Home / Browse projects / Mumbai Suburban, Maharashtra / Shraddha Pavillion

Registered No litigation declared Others project

Shraddha Pavillion

By Shraddha Prime Projects Limited

RG-MH-37386 · RERA P51800049739 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of Aditya Birla Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 81%
108 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

Shraddha Pavillion is a Others project by Shraddha Prime Projects Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049739 on 24 Feb 2023. Possession is promised by 9 Jan 2027. 58 of the 166 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameShraddha Pavillion
  • TypeOthers
  • Location
    • Kanjur Village Road
    • Kanjurmarg East
    • Mumbai
    • Kanjurmarg
    • Kurla
    • Mumbai Suburban
    • 400042
  • Pincode400042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049739
  • ReraGenie IDRG-MH-37386

Builder

  • NameShraddha Prime Projects Limited
  • Entity typeCompany
  • CINL70100MH1993PLC394793
  • GSTIN27AAACT6881D1Z8
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSudhir Balu Mehta, Ramchandra Krishna Ralkar, Santosh Sadashiv Samant, Shivangi Datta, Nimisha Soni, Rohit Mahesh Agrawal
  • Other registrations7 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredFeb 2023PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion9 Jan 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed127 files

Current status

35%58 of 166 units booked
65.8%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA222288795
Building 2NA211971071

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 81%.

Building 134%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)60%
Plinth60%
Stilt Floor50%
Slabs of Super Structure81%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 236%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)60%
Plinth70%
Stilt Floor60%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126
BuildingClosed/CoveredTotal
Building 16363
Building 26363

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,944 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on11 Dec 2025
LandownerVillageDistrict
Bhandari Co-operative Housing Society LimitedKanjurmargMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8429.51
Proposed, not sanctioned8,415 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1, 101, Parmeshwari Plaza, Mulund - West, Mumbai - 400080
Estimated costRs 37.60 cr
Cost incurredRs 24.76 cr
Work done65.85%
BuildingWingEstimatedIncurred
Building 1NARs 18.42 crRs 12.38 cr
Building 2NARs 18.42 crRs 12.38 cr
-NARs 75.20 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm Architecture
ArchitectRajendra Bankar
EngineerSK Consultants & Engineers
EngineerRajendra Bankar
EngineerS K Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Shraddha Prime Projects Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 9 Jan 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY 25-26 SHRADDHA PAVILLION.pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Pavillion as on 31st March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Pavillion as on 31st March 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Pavillion as on 31st March 2026.pdf15 May 2026
Building plan approvalFile: Building Plan Sheet 9.pdf15 Apr 2026
Building plan approvalFile: Building Plan Sheet 10.pdf15 Apr 2026
Building plan approvalFile: Building Plan sheet 11.pdf15 Apr 2026
Building plan approvalFile: Building Plan Sheet 12.pdf15 Apr 2026
Building plan approvalFile: Building Plan Sheet 13.pdf15 Apr 2026
Layout approvalFile: Shraddha Pavilion Layout - Highlighted.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 2.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 3.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 4.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 5.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 6.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 7.pdf14 Apr 2026
Building plan approvalFile: Building Plan Sheet 8.pdf14 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A- Shraddha Pavilion FY 2023- 2024.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A- Shraddha Pavilion FY 2024-2025.pdf9 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A Shraddha Pavillion FY 2022-2023.pdf9 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 - Shraddha Pavillion for FY 2024-25.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1- Shraddha Pavilion Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 1File: Form 1- Shraddha Pavilion Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2- Shraddha Pavilion as on dec 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2- Shraddha Pavilion as on dec 2025.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Pavillion as on Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Pavillion as on Dec 2025.pdf27 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 Shraddha Pavillion FY 2023-24.pdf27 Mar 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Pavillion as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 1File: Form 1 - Shraddha Pavillion as on Sep 2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2 - Shraddha Pavillion as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2 - Shraddha Pavillion as on Sep 2025.pdf30 Dec 2025
Withdrawal Update Form 3File: Form 3 - Shraddha Pavillion as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 3File: Form 3 - Shraddha Pavillion as on Sep 2025.pdf30 Dec 2025
Building plan approvalFile: Bhandari Amended IOD Drawings.pdf18 Dec 2025
Form 1File: Form 1 - Shraddha Pavillion as on 31st March 2025.pdf29 Sep 2025
Form 2File: Form 2 - Shraddha Pavillion as on March 2025.pdf29 Sep 2025
Form 3File: Form 3 - Shraddha Pavillion as on 31st March 2025.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Pavillion as on March 2025.pdf29 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on 31st March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on Dec 2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on Dec 2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: sh pavillion_0001.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on Sep 2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on 30-09-2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on 30-09-2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on Sep 2024.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Pavillion FY 2023-24.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Pavillion FY 2023-24.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: Shraddha Pavillion Encumbrance (1).pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Shraddha Pavillion Encumbrance (1).pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on June 2024.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on June 2024_11zon.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Pavillion as on June 2024.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on June 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on March 2024.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on March 2024.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FF.pdf20 Apr 2024
Proforma of Agreement for saleFile: PAVILLION_AFS.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Pavillion as on March 2023.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Pavillion as on June 2023.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Pavillion as on Sep 2023.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Pavillion as on Dec 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on March 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on June 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on Sep 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Pavillion as on Dec 2023.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on March 2023.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on June 2023.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on Sep 2023.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Pavillion as on Dec 2023.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Shraddha Pavillion for FY 2022-23.pdf1 Feb 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shraddha Park CityP51800055750Dahisar East, Borivali, Mumbai Suburban1,159Apr 2024OngoingDec 2029Not due yet
Pratham - By ShraddhaP51800077622Borivali East, Mumbai Suburban-Oct 2024OngoingDec 2029Not due yet
Shraddha Paradise EnclavePR1180002600018Veena Nagar Phase II, Mumbai Suburban207Apr 2026OngoingMar 2029Not due yet
Shraddha ParadiseP51800052244Borivali, Mumbai Suburban353Aug 2023OngoingDec 2028Not due yet
Shraddha PalaciousP51800052241Bhandup West, Mumbai Suburban398Aug 2023OngoingDec 2027Not due yet
Shraddha PanoramaP51800053318Mulund, Mumbai Suburban282Oct 2023OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shraddha Pavillion on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kanjurmarg East, Mumbai6,700+ in Mumbai Suburban

2 kmShraddha PavillionCompleted 39Lapsed / revoked 31Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: Shraddha Prime Projects Limited

Shraddha Prime Projects Limited has 8 registrations on MahaRERA, including Shraddha Pavillion and Shraddha Paradise. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shraddha Pavillion is delayed beyond 9 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shraddha Pavillion?

The registered promoter entity is Shraddha Prime Projects Limited, a company as per the filing. Its CIN L70100MH1993PLC394793 and GSTIN 27AAACT6881D1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shraddha Pavillion?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shraddha Pavillion?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shraddha Pavillion?

The professionals named in the filing: Architect: The Firm Architecture; Architect: Rajendra Bankar; Engineer: SK Consultants & Engineers; Engineer: Rajendra Bankar; Engineer: S K Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shraddha Pavillion?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shraddha Pavillion. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shraddha Pavillion to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.