ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SENROOFS PHASE - III

Registered No litigation declared Residential / Group Housing project

SENROOFS PHASE - III

By PIONEER HOUSING

RG-MH-58163 · RERA P51800032087 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
15 of 380Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

SENROOFS PHASE - III is a Residential / Group Housing project by PIONEER HOUSING in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032087 on 6 Dec 2021. Possession is promised by 31 Dec 2027. 365 of the 380 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSENROOFS PHASE - III
  • TypeResidential / Group Housing
  • Location
    • GOREGAON MULUND LINK ROAD
    • NAHUR EAST
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800032087
  • ReraGenie IDRG-MH-58163

Builder

  • NamePIONEER HOUSING
  • Entity typePartnership
  • PartnerCHAMPALLAL KISHORECHANDRA VARDHAN
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

96%365 of 380 units booked
78.3%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SENONNA64553800380

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SENON: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2091

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,091
Closed/Covered2,091

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,058 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Nov 2025
LandownerVillageDistrict
CRESCENT BUILDERSKurlaMumbai Suburban
JANARDHAN ATMARAM PATILKalyanThane

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MAHANAGAR PALIKA
Permissible FSI45409.38
Proposed, not sanctioned26,287 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMARATHON MAX, OPPOSITE RTO, MULUND GOREGAON LINK ROAD, MULUND WEST
Estimated costRs 391.77 cr
Cost incurredRs 306.73 cr
Work done78.29%
BuildingWingEstimatedIncurred
SENONNARs 362.05 crRs 293.67 cr
-NARs 29.72 crRs 13.06 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHATNAGAR AMBRE KOTHARI ARCHITECTS
ArchitectVINOD GAIKWAD
EngineerHASMUKH RAMPARIYA
Chartered AccountantSANKET R SHAH
Chartered AccountantAMIT D SHETH
PartnerRole in project
PIONEER HOUSING-

Litigation declared1

CaseCourtStatus
3051/2011HIGH COURT BOMBAYPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Senon Arct Cert 31 03 26.pdf18 May 2026
Withdrawal Update Form 2File: Senon Eng Cert 31 03 26.pdf18 May 2026
Withdrawal Update Form 3File: Senon CA Cert 31 03 26_11zon.pdf18 May 2026
Withdrawal Update Form 1File: Senon Arct Cert.pdf11 Mar 2026
Withdrawal Update Form 1File: Senon Arct Cert.pdf11 Mar 2026
Withdrawal Update Form 2File: Senon Eng Certi.pdf11 Mar 2026
Withdrawal Update Form 2File: Senon Eng Certi.pdf11 Mar 2026
Withdrawal Update Form 3File: Senon CA Certi_11zon.pdf11 Mar 2026
Withdrawal Update Form 3File: Senon CA Certi_11zon.pdf11 Mar 2026
Withdrawal Update Form 1File: Form I 30 09 25 SENON.pdf5 Dec 2025
Withdrawal Update Form 2File: Form II 30 09 25 SENON.pdf5 Dec 2025
Withdrawal Update Form 3File: Form III 30 09 25 SENON_11zon.pdf5 Dec 2025
Withdrawal Update Form 1File: Form I 30 06 25 SENON.pdf27 Nov 2025
Withdrawal Update Form 2File: Form II 30 06 25 SENON.pdf27 Nov 2025
Withdrawal Update Form 3File: Form III 30 06 25 SENON.pdf27 Nov 2025
Form 1File: form 1.pdf9 Jun 2025
Form 2File: form 2.pdf9 Jun 2025
Form 3File: form 3.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: disclosure senrof phase III.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: Rera senrof phase III.pdf9 Jun 2025
Layout approvalFile: Approved Plan_Salona_compressed.pdf25 Feb 2025
Copy of Layout Approval (in case of layout)File: Approved Plan_Salona_compressed.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form V - Pioneer.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9th Floor Architect Work Completion Certificate-20230323 (1).pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III (250423) - Tower 3 (Final)_compressed.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form V (F Y 2021-22) - Senroof Phase II.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf4 Apr 2023
Copy of the legal title reportFile: TITLE REPORT.pdf3 Dec 2021
Copy of the legal title reportFile: Copy of the legal title report-2-26.pdf3 Dec 2021
CERSAI detailsFile: CERSAI DECLARATION LETTER .pdf2 Dec 2021
Building plan approvalFile: 2188338_IOD_signed.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_1-1.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_2-2.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_3-3.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_4-4.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_5-5.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_6-6.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_7-7.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_8-8.pdf1 Dec 2021
Layout approvalFile: Ammended Approved Drawing_9-9.pdf1 Dec 2021
Layout approvalFile: PLANS 10 - 11.pdf1 Dec 2021
Layout approvalFile: PLANS 12- 13.pdf1 Dec 2021
Layout approvalFile: PLANS 14 - 15.pdf1 Dec 2021
Layout approvalFile: PLANS 16 -17.pdf1 Dec 2021
Details of encumbrancesFile: Encumbrance Letter.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_1-1.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_2-2.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_3-3.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_4-4.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_5-5.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_6-6.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_7-7.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_8-8.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: Ammended Approved Drawing_9-9.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS 10 - 11.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS 12- 13.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS 14 - 15.pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS 16 -17.pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 2188338_IOD_signed.pdf1 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Revalidation IOD-CC-Paid Receipt.pdf1 Dec 2021
Declaration about Commencement CertificateFile: CC Declaration (1).pdf1 Dec 2021
Declaration in FORM BFile: FORM B, DEVLOPERS, PIONEER HOUSING.pdf1 Dec 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf1 Dec 2021
PAN CardFile: 1 PAN Card.pdf23 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: 2220969_FirstCC_signed.pdf23 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-RERA-20211123 (4).pdf23 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf23 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf23 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf23 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Nov 2021
Proforma of Allotment letterFile: RERA AGREEMENT FOR SALE BLDG NO D1.pdf23 Nov 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SENROOFS PHASE IISENROOFS MILE OFF GOREGAN-MULUND LINK ROAD NAHUR EAST 400081512CompletedDec 2018Dec 2018
SPIRO TOWERMULUND EAST17CompletedDec 2014Late, Apr 2016
SENROOFS - SANCTURASENROOFS GOREGAON MULUND LINK ROAD NAHUR EAST 400081344CompletedDec 2014Late, Jan 2016

How this compares with Mumbai Suburban

96%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SENROOFS PHASE - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAHUR EAST6,700+ in Mumbai Suburban

2 kmSENROOFS PHASE - IIICompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: PIONEER HOUSING

PIONEER HOUSING has 4 registrations on MahaRERA, including SENROOFS PHASE - II and SENROOFS PHASE - III. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SENROOFS PHASE - III is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SENROOFS PHASE - III?

The registered promoter entity is PIONEER HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SENROOFS PHASE - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SENROOFS PHASE - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SENROOFS PHASE - III?

The professionals named in the filing: Architect: BHATNAGAR AMBRE KOTHARI ARCHITECTS; Architect: VINOD GAIKWAD; Engineer: HASMUKH RAMPARIYA; Chartered Accountant: SANKET R SHAH; Chartered Accountant: AMIT D SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENROOFS PHASE - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENROOFS PHASE - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENROOFS PHASE - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.