SHRADDHA EVOQUE

By SHRADDHA LANDMARK PRIVATE LIMITED

RG-MH-21291 · RERA P51800008864 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 32 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
81 of 88Construction stages doneacross 8 buildings; furthest along: Basement (if any), 0%
104 of 674Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

SHRADDHA EVOQUE is a Others project by SHRADDHA LANDMARK PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008864 on 19 Aug 2017. Possession was promised by 30 Aug 2026 and is now 2 months past that date. The completion date has moved by 32 months from the original filing. 570 of the 674 units on this registration are recorded sold or booked, and 81 of 88 construction stages are filed complete.

At a glance

Project

  • NameSHRADDHA EVOQUE
  • TypeOthers
  • Location
    • Lake Road
    • Ram Rahim Udyog Nagar
    • Sadan wadi
    • Bhandup West
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008864
  • ReraGenie IDRG-MH-21291

Builder

  • NameSHRADDHA LANDMARK PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSUDHIR BALU MEHTA, VINAY MADHUKAR NAYAK
  • Other registrations20 more →
  • Completed11 of 21
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

2 months past promisethis monthRegisteredAug 2017First promiseDec 2023Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion30 Aug 2026
  • Revised completionRevised to 30 Aug 2026 (originally 30 Dec 2023)
  • Buildings8 building records
  • Documents filed146 files

Current status

85%570 of 674 units booked
89.4%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALE TOWER 1 WING BNA24221019110
SALE TOWER 1 WING ANA242364973
SALE TOWER 1 WING CNA24231039112
SALE TOWER 1 WING DNA42412668274
SALE TOWER 1 WING FNA24221050105
SALE TOWER 1 WING ENA240000
SALE TOWER 2NA80000
SALE TOWER 3NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

81 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Basement (if any), at 0%.

SALE TOWER 1 WING B91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 1 WING A91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 1 WING C91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 1 WING D91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 1 WING F91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 1 WING E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SALE TOWER 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed148

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots148
Closed/Covered148
BuildingClosed/CoveredTotal
SALE TOWER 1 WING B2929
SALE TOWER 1 WING A1717
SALE TOWER 1 WING C2525
SALE TOWER 1 WING D2424
SALE TOWER 1 WING F2525
SALE TOWER 1 WING E2424
SALE TOWER 222
SALE TOWER 322

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,442 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI24057.02
Proposed, not sanctioned15,653 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1, 101 NETAJI SUBHASH ROAD, MULUND WEST, MUMBAI 400080
Estimated costRs 131.00 cr
Cost incurredRs 117.12 cr
Work done89.41%
BuildingWingEstimatedIncurred
SALE TOWER 1 WING BNARs 15.56 crRs 13.82 cr
SALE TOWER 1 WING ANARs 15.56 crRs 13.82 cr
SALE TOWER 1 WING CNARs 15.56 crRs 13.82 cr
SALE TOWER 1 WING DNARs 15.56 crRs 13.82 cr
SALE TOWER 1 WING FNARs 15.56 crRs 13.82 cr
SALE TOWER 1 WING ENARs 15.56 crRs 13.82 cr
SALE TOWER 2NARs 15.56 crRs 13.82 cr
SALE TOWER 3NARs 15.56 crRs 13.82 cr
-NARs 6.55 crRs 6.55 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY TURBADKAR
EngineerSK Consultants & Engineers
EngineerRajendra Bankar
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantVishwas & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
SHRADDHA LANDMARK PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800015282Dec 2023 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51800025628Dec 2023 → Dec 2025

Reason as filed by the promoterThe delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We have received Occupancy Certificate for Building A, B, C & F & the remaining work is finished. Given the circumstances, we kindly request an extension until 30-12-2025 to complete the project and fulfil all regulatory requirements. We seek your understanding and approval of this request.

EA22042620696Dec 2023 → Aug 2026

Reason as filed by the promoterThe project is substantially completed, with all major construction activities finished. Only minor finishing works such as final touch-ups, common area detailing, testing/commissioning of services, and statutory compliances remain. The extension is sought solely to complete these residual works and to obtain the OC, ensuring full compliance with statutory requirements and delivering the project in a proper and compliant manner to allottees. The extension is requested to complete residual works and obtain the OC in compliance with statutory requirements. Given the circumstances, we kindly requ

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2025

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1.pdf11 Aug 2026
Withdrawal Update Form 2File: 2.pdf11 Aug 2026
Withdrawal Update Form 3File: 3.pdf11 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 - Shraddha Evoque for FY 2024-25.pdf13 Jun 2026
Form 2A (FY 2019-2020)File: Form 2A 19-20 Signed.pdf25 May 2026
Form 2A (FY 2020-2021)File: Form 2A 20-21 Signed.pdf25 May 2026
Form 2A (FY 2021-2022)File: Form 2A 21-22 Signed.pdf25 May 2026
Form 2A (FY 2022-2023)File: Form 2A 22-23 Signed.pdf25 May 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24 Signed.pdf25 May 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25 Signed.pdf25 May 2026
Form 5 (FY 2018-2019)File: Form 5 18-19 Signed.pdf25 May 2026
Form 5 (FY 2019-2020)File: Form 5 19-20 Signed.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Evoque as on 31st March 2026.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Evoque as on 31st March 2026.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Evoque as on 31st March 2026.pdf20 May 2026
Form 1File: Form 1 - Shraddha Evoque as on June 2025.pdf26 Feb 2026
Form 2File: Form 2 - Shraddha Evoque as on June 2025.pdf26 Feb 2026
Form 3File: Form 3 - Shraddha Evoque as on June 2025.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Evoque as on June 2025.pdf26 Feb 2026
Form 1File: Form 1 - Shraddha Evoque as on Sep 2025.pdf26 Feb 2026
Form 2File: Form 2 - Shraddha Evoque as on Sept 2025.pdf26 Feb 2026
Form 3File: Form 3 - Shraddha Evoque as on Sept 2025.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Evoque as on Sep 2025.pdf26 Feb 2026
Form 1File: Form 1 - Shraddha Evoque as on Dec 2025.pdf26 Feb 2026
Form 2File: Form 2 - Shraddha Evoque as on Dec 2025.pdf26 Feb 2026
Form 3File: Form 3 - Shraddha Evoque as on Dec 2025.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Evoque as on Dec 2025.pdf26 Feb 2026
Form 1File: Form 1 - Shraddha Evoque as on March 2025.pdf16 Sep 2025
Form 2File: Form 2 - Shraddha Evoque as on March 2025.pdf16 Sep 2025
Form 3File: Form 3 - Shraddha Evoque as on March 2025.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Evoque as on March 2025.pdf16 Sep 2025
Certificates of CA (Form 3)File: Form 3 - Shraddha Evoque as on March 2025.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shraddha Evoque as on March 2025.pdf5 May 2025
Certificates of CA (Form 3)File: Form 3 - Shraddha Evoque as on Dec 2024.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shraddha Evoque as on Dec 2024.pdf17 Apr 2025
Certificates of CA (Form 3)File: Form 3 - 30-09-2024 revised_11zon.pdf28 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OCC Sale Bldg Wing ABCF Madan Cottage_11zon.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - 30-09-2024_11zon.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Shraddha Evoque for FY 2023-24.pdf11 Dec 2024
Declaration in FORM BFile: Form B.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form 3 - Shraddha Evoque 30th Sept_11zon.pdf30 Oct 2024
Certificates of CA (Form 5)File: FORM 5 17-18.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Sept 24.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: CIRCULER 29 updated_11zon.pdf30 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D.pdf30 Oct 2024
CERSAI detailsFile: DECLARATION of Cersai.pdf30 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXTURE A.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf30 Oct 2024
Certificates of CA (Form 3)File: 22 Certificates of CA (Form 3).pdf28 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf28 Oct 2024
Certificates of CA (Form 3)File: New Format Form 3 - Shraddha Evoque as on 30th Sept.pdf20 Oct 2024
Certificates of CA (Form 3)File: New Format Form 3 - Shraddha Evoque as on 31st March 2024.pdf20 Oct 2024
Certificates of CA (Form 3)File: New Format Form 3 - Shraddha Evoque 30-06-2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shraddha Evoque as on Sept 2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shraddha Evoque as on March 2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shraddha Evoque as on June 2024.pdf20 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf20 Jul 2024
Certificates of CA (Form 3)File: 19 Certificates of CA (Form 3).pdf20 Jul 2024
Certificates of CA (Form 3)File: 20 Certificates of CA (Form 3) (1).pdf20 Jul 2024
Details of encumbrancesFile: ENCUMBRANCE ON PROJECT (SHRADDHA EVOQUE).pdf11 Jul 2024
Layout approvalFile: 1.pdf18 Apr 2024
Building plan approvalFile: 2_3_merged.pdf18 Apr 2024
Copy of Layout Approval (in case of layout)File: 1.pdf18 Apr 2024
Building Plan Approval (IOD)File: 2_3_merged.pdf18 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shraddha Evoque as on March 2023.pdf1 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shraddha Evoque as on June 2023.pdf1 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shraddha Evoque as on Sep 2023.pdf1 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MARLESHWAR CHSMARLESHWAR CHS KONKAN NAGAR NEXT TO HANUMAN MANDIR BHANDUP WEST MUMBAI 40007860CompletedJan 2016Late, Jun 2017

How this compares with Mumbai Suburban

85%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 32 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRADDHA EVOQUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ram Rahim Udyog Nagar, Sadan wadi, Bhandup West6,700+ in Mumbai Suburban

2 kmSHRADDHA EVOQUECompleted 53Lapsed / revoked 36Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 171 registered projects within 2 km.

Builder: SHRADDHA LANDMARK PRIVATE LIMITED

SHRADDHA LANDMARK PRIVATE LIMITED has 21 registrations on MahaRERA, including SHRADDHA EVOQUE and SHRADDHA ORCHID AVENUE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRADDHA EVOQUE is delayed beyond 30 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRADDHA EVOQUE?

The registered promoter entity is SHRADDHA LANDMARK PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRADDHA EVOQUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRADDHA EVOQUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRADDHA EVOQUE?

The professionals named in the filing: Architect: VIJAY TURBADKAR; Engineer: SK Consultants & Engineers; Engineer: Rajendra Bankar; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Vishwas & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRADDHA EVOQUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRADDHA EVOQUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRADDHA EVOQUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.