ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SHRADDHA VARDAAN

Registered No litigation declared Residential / Group Housing project

SHRADDHA VARDAAN

By SHRADDHA LANDMARK PRIVATE LIMITED

RG-MH-29609 · RERA P51800028936 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 170.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
21 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 79%
77 of 723Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

SHRADDHA VARDAAN is a Residential / Group Housing project by SHRADDHA LANDMARK PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028936 on 15 Apr 2021. Possession is promised by 31 Dec 2027. 646 of the 723 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHRADDHA VARDAAN
  • TypeResidential / Group Housing
  • Location
    • VILLAGE KANJUR
    • BHANDUP WEST
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028936
  • ReraGenie IDRG-MH-29609

Builder

  • NameSHRADDHA LANDMARK PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSUDHIR BALU MEHTA, VISHAL PRITHVIRAJ SALECHA, RAMCHANDRA KRISHNA RALKAR, DHRUV RAJESH MEHTA
  • Other registrations20 more →
  • Completed11 of 21
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed126 files

Current status

89%646 of 723 units booked
95.1%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA42372130213
WING BNA42382930293
WING CNA42382170217

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 79%.

WING A80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING B80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING C61%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed130

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots130
Closed/Covered130

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,741 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 170.00 crore
CERSAI search filedYes
Declared on20 May 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI46195.0
Proposed, not sanctioned24,333 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 1, Commercial Wing Vikas Paradise, Lbs Marg, Mulund West
Estimated costRs 180.00 cr
Cost incurredRs 171.13 cr
Work done95.08%
BuildingWingEstimatedIncurred
WING BNARs 67.22 crRs 67.22 cr
WING CNARs 53.50 crRs 53.50 cr
WING ANARs 50.28 crRs 50.28 cr
-NARs 9.00 crRs 13.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS. S. ASSOCIATES
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
SHRADDHA LANDMARK PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
SUIT NO 2011 OF 2019/2019CITY CIVIL COURT MUMBAI FORTPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504491Chandrashekhar Ramchandra ShindeSHRADDHA LANDMARK PRIVATE LIMITED16/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Shraddha Vardaan as on 31st March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Vardaan as on 31st March 2026.pdf26 May 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Vardaan as on 31st March 2026.pdf26 May 2026
Form 5 (FY 2024-2025)File: Form 5 - Shraddha Vardaan for FY 2024-25.pdf4 Apr 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Vardaan as on Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Vardaan as on Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Vardaan as on Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Vardaan as on Sep 2025.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Vardaan as on Sep 2025.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Vardaan as on Sep 2025.pdf3 Jan 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Vardaan as on June 2025.pdf29 Dec 2025
Withdrawal Update Form 2File: Form 2 - Shraddha Vardaan as on June 2025.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 - Shraddha Vardaan as on June 2025.pdf29 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on Dec 2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: sh vardaan_0001_8_11zon.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Vardaan FY2023-24.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Vardaan FY2023-24.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on Sep 2024.pdf29 Oct 2024
Details of encumbrancesFile: Rera Encumbrance_Shraddha Vardaan.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan as on 30th Sep 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on Sep 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 - Shraddha Vardaan as on 30th June 2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on June 2024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 - Shraddha Vardaan as on 31-03-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf20 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf12 Apr 2024
Declaration about Commencement CertificateFile: FORMAT D (32).pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on Dec 2023_11zon.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on Dec 2023_11zon.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Shraddha Vardaan as on Dec 2023_11zon.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan as on Dec 2023_11zon.pdf12 Apr 2024
Building plan approvalFile: 1.pdf10 Apr 2024
Building plan approvalFile: 2.pdf10 Apr 2024
Building plan approvalFile: 3.pdf10 Apr 2024
Building plan approvalFile: 4.pdf10 Apr 2024
Building plan approvalFile: 5.pdf10 Apr 2024
Building plan approvalFile: 6.pdf10 Apr 2024
Building plan approvalFile: 7.pdf10 Apr 2024
Building plan approvalFile: 8.pdf10 Apr 2024
Building plan approvalFile: 9.pdf10 Apr 2024
Building plan approvalFile: 10.pdf10 Apr 2024
Layout approvalFile: 1.pdf10 Apr 2024
Copy of Layout Approval (in case of layout)File: 1.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan 30-09-2023.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on Dec 2023.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 - Shraddha Vardaan as on 31-12-2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sharaddha Vardaan_ (2).pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 (14)_11zon.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf11 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan as on 30-09-2023_11zon.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-23).pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on March 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Vardaan as on Sep 2023.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on June 2023.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Vardaan as on Sep 2023.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan as on June 2023.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Vardaan as on Sep 2023.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shraddha Vardaan as on 03-07-2023_compressed.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Shraddha vardaan as on 31-03-2023.pdf30 Sep 2023
Layout approvalFile: IOD PLAN COPY.pdf13 Sep 2023
Copy of Layout Approval (in case of layout)File: IOD PLAN COPY.pdf13 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: LATEST CC.pdf13 Sep 2023
Other - LegalFile: SUIT for bank.pdf13 Sep 2023

How this compares with Mumbai Suburban

89%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRADDHA VARDAAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHANDUP WEST6,700+ in Mumbai Suburban

2 kmSHRADDHA VARDAANCompleted 39Lapsed / revoked 34Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 187 registered projects within 2 km.

Builder: SHRADDHA LANDMARK PRIVATE LIMITED

SHRADDHA LANDMARK PRIVATE LIMITED has 21 registrations on MahaRERA, including SHRADDHA EVOQUE and SHRADDHA ORCHID AVENUE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRADDHA VARDAAN is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRADDHA VARDAAN?

The registered promoter entity is SHRADDHA LANDMARK PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRADDHA VARDAAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRADDHA VARDAAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHRADDHA VARDAAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRADDHA VARDAAN?

The professionals named in the filing: Architect: S. S. ASSOCIATES; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRADDHA VARDAAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRADDHA VARDAAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRADDHA VARDAAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.