Shankeshwar Vithuchandra Citadel
By Shankeshwar Vithuchandra Developers LLP
RG-MH-44255 · RERA P52100054605 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shankeshwar Vithuchandra Citadel is a Others project by Shankeshwar Vithuchandra Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100054605 on 31 Jan 2024. Possession is promised by 31 Dec 2027. 91 of the 155 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameShankeshwar Vithuchandra Citadel
- TypeOthers
- Location
- Moshi-Alandi Road
- Dudulgaon
- Moshi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054605
- ReraGenie IDRG-MH-44255
Builder
- NameShankeshwar Vithuchandra Developers LLP
- Entity typePartnership
- GSTIN27AEYFS6227B1ZN
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersNitin Chhaganlal Jain, Pratik Sanjay Talekar, Abhijit Tukaram Talekar, Rahul Baban Talekar, Sanket Subhash Talekar, Vinil Bharat Kothari, Shree Shankeshwar Highrisers Private Limited, Harsh Umesh Jain
- Other registrations1 more →
- Declared earlier projects13 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 22 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building Wing A - Shankeshwar Vithuchandra Citadel | NA | 10 | 10 | 135 | 20 | 155 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 85%.
Building Wing A - Shankeshwar Vithuchandra Citadel: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed180
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Baban Vitthal Talekar | Moshi | Pune |
| Sanjay Vitthal Talekar | Moshi | Pune |
| Subhash Vitthal Talekar | Moshi | Pune |
| Shilpa Tukaram Talekar | Moshi | Pune |
| Abhijeet Tukaram Talekar | Moshi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building Wing A - Shankeshwar Vithuchandra Citadel | NA | Rs 27.00 cr | Rs 20.28 cr |
| - | NA | Rs 9.00 cr | Rs 2.23 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Karan Darda |
| Engineer | Spectrum Consultants - Mr. Parag Chopada |
| Engineer | Raghuveer Jambhal |
| Chartered Accountant | NPSR & Associates - CA. Nandkishor Lahoti |
| Chartered Accountant | NPSR & Associates |
| Chartered Accountant | Ganesh SUNIL Mandlecha |
| Partner | Role in project |
|---|---|
| Shankeshwar Vithuchandra Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architects Certificate Form 1.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate Form 3.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Shankeshwar Citadel Form 1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Citadel Q3.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate Form 3 - Dt- 31-12-2025 SV Citadel_11zon.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 with sign.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate from-3 shree shankeshwar vithuchandradevelopers llp (1)_11zon.pdf | 15 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5 with sign.pdf | 3 Oct 2025 |
| Form 5 (FY 2024-2025)File: form 5 with sign.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 - 01-07-25 (1).pdf | 21 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Citadel Q1.pdf | 21 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Shankeshwar Vithuchandra Citadel Q4.pdf | 21 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Dt 11-04-2025 SV Citadel.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Form 1 02-04-2025 SV Citadel.pdf | 15 Apr 2025 |
| Layout approvalFile: Sheet No 1_compressed.pdf | 17 Mar 2025 |
| Layout approvalFile: Sheet No 1_compressed.pdf | 17 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed.pdf | 17 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed.pdf | 17 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Citadel 31 12 24.pdf | 5 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: citadel Form 3 dt 31 12 24.pdf | 4 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate - Form 5 Dt 26 08 2024 SV Citadel.pdf | 19 Feb 2025 |
| Building plan approvalFile: Sheet No 2.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 3.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 4.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 5.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 6.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 7.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 8.pdf | 7 Feb 2025 |
| Building plan approvalFile: Sheet No 9.pdf | 7 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed (1).pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 2.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 3.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 4.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 5.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 6.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 7.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 8.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 9.pdf | 7 Feb 2025 |
| Layout approvalFile: Sheet No 1.pdf | 5 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Sheet No 1.pdf | 5 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Sheet No 3.pdf | 5 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Sheet No 2.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Dt 18 11 2024.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Dt 31 12 2024 SV Citadel.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SV Citadel dt 30 09 24_compressed.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Citadel 30 06 24_compressed.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SV Citadel 30 06 24.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 Citadel 30 09.pdf | 11 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024 CITADEL.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024 CITADEL.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shankeshwar Citadel.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf | 12 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate For Quality Assurance Form 2A.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shankeshwar Vithuchandra Citadel Q4.pdf | 12 Jul 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 10 Jan 2024 |
| Declaration in FORM BFile: Form B - Shankeshwar Vithuchandra Developers LLP.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Final_compressed.pdf | 2 Dec 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200288783968_For_Asset_Based_Search_01_12_2023_19_16_37_849.pdf | 2 Dec 2023 |
| Proforma of Agreement for saleFile: Draft AGREEMENT Final.pdf | 2 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Detailed Deviation Report with Agreement.pdf | 2 Dec 2023 |
| Layout approvalFile: Final Layout.pdf | 1 Dec 2023 |
| Building plan approvalFile: IOD 1.pdf | 1 Dec 2023 |
| Building plan approvalFile: IOD 2.pdf | 1 Dec 2023 |
| Building plan approvalFile: IOD 3.pdf | 1 Dec 2023 |
| Building plan approvalFile: IOD.pdf | 1 Dec 2023 |
| PAN CardFile: PAN CARD- Shankeshwar LLP.pdf | 1 Dec 2023 |
| Copy of the legal title reportFile: Legal Tittle Report.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Details Of Encumbrances Concerned to Finance.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrances Concerned to Legal.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Details Of Encumbrances Concerned to Finance.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrances Concerned to Legal.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Final Layout.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD 1.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD 2.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD 3.pdf | 1 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 1 Dec 2023 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Shankeshwar WorldPM1260002500768 | Rajgurunagar, Pune | 298 | Sep 2025 | Ongoing | Jun 2030 | Not due yet |
| Shankeshwar SparshP52100055256 | Moshi, Pune | 474 | Mar 2024 | Ongoing | Dec 2028 | Not due yet |
| Shankeshwar CapitalP52100048864 | Chikhali, Pune | 65 | Jan 2023 | Ongoing | Dec 2027 | Not due yet |
| Shankeshwar GravityP52100024786 | NA, Pune | - | Mar 2020 | Completed | Dec 2025 | Apr 2024 |
| Shankeshwar CrystalP52100032452 | DUDULGAON, Pune | - | Jan 2022 | Completed | Dec 2025 | Feb 2025 |
| SHANKESHWAR PEARLP52100035074 | RAVET, Pune | 85 | May 2022 | Ongoing | Dec 2025 | Not delivered |
| Shankeshwar RoyaleP52100020786 | Chikhali, Pune | - | May 2019 | Completed | Sep 2024 | Apr 2023 |
| Shankeshwar WisdomP52100023359 | Moshi, Pune | - | Dec 2019 | Completed | Sep 2023 | Mar 2023 |
| Shankeshwar PrestigeP52100017693 | Moshi, Pune | - | Sep 2018 | Completed | Dec 2022 | Jun 2022 |
| NilayP52100002147 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Dec 2022 | Dec 2021 |
| Shankeshwar DarshanP52100000830 | Pimpri, Pune | - | Jul 2017 | Completed | Dec 2021Registered original: Dec 2019 | Nov 2020 |
| Shankeshwar CrimsonP52100000087 | Chikhali, Pune | - | Jun 2017 | Completed | Dec 2019 | Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shankeshwar Vithuchandra Citadel on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dudulgaon13,700+ in Pune
Filed coordinates, straight-line distance. 164 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Shankeshwar Vithuchandra Developers LLP
Shankeshwar Vithuchandra Developers LLP has 2 registrations on MahaRERA, including Shankeshwar Vithuchandra Citadel and Shankeshwar Vithuchandra Skye. Its filings disclose 13 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shankeshwar Vithuchandra Citadel is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shankeshwar Vithuchandra Citadel?
The registered promoter entity is Shankeshwar Vithuchandra Developers LLP, a partnership as per the filing. Its GSTIN 27AEYFS6227B1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shankeshwar Vithuchandra Citadel?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shankeshwar Vithuchandra Citadel?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shankeshwar Vithuchandra Citadel?
The professionals named in the filing: Architect: Karan Darda; Engineer: Spectrum Consultants - Mr. Parag Chopada; Engineer: Raghuveer Jambhal; Chartered Accountant: NPSR & Associates - CA. Nandkishor Lahoti; Chartered Accountant: NPSR & Associates; Chartered Accountant: Ganesh SUNIL Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shankeshwar Vithuchandra Citadel?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback