Shankeshwar Capital

By Nitin Chhaganlal Jain

RG-MH-83561 · RERA P52100048864 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 11 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 95%
60 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

Shankeshwar Capital is a Commercial project by Nitin Chhaganlal Jain in Pune, Maharashtra, registered with MahaRERA as P52100048864 on 24 Jan 2023. Possession is promised by 31 Dec 2027. 5 of the 65 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameShankeshwar Capital
  • TypeCommercial
  • Location
    • Jadhavwadi
    • Chikhali
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048864
  • ReraGenie IDRG-MH-83561

Builder

  • NameNitin Chhaganlal Jain
  • Entity typeIndividual
  • GSTIN27AAQPB0293C1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects12 →

Key dates

this monthRegisteredJan 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed135 files

Current status

8%5 of 65 units booked
40.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA141406565

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

Building A: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered66
Open Space262

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,379 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2025
LandownerVillageDistrict
Dnyanoba Ananta JadhavChikhali Bk.Pune
Ramhari Bhagawanta JadhavChikhali Bk.Pune
Somnath Vitthal JadhavChikhali Bk.Pune
Sukhadev Rangnath JadhavChikhali Bk.Pune
Madhukar Shankar JadhavChikhali Bk.Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal corporation
Permissible FSI12246.0
Proposed, not sanctioned11,276 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAKA CHAMBERS, CHINCHWAD STATION, MIDC TELCO ROAD, CHINCHWAD,PUNE 411019
Estimated costRs 55.00 cr
Cost incurredRs 21.99 cr
Work done39.99%
BuildingWingEstimatedIncurred
Building ANARs 40.00 crRs 17.28 cr
-NARs 15.00 crRs 4.71 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPramod S Shinde
EngineerG. A. Bhilare Consultants Pvt. Ltd.
EngineerRaghuveer jambhale
Chartered AccountantNPSR & Associates - CA. Vivek N. Lahoti
Chartered AccountantNPSR & Associates
Chartered AccountantGanesh Mandlecha
PartnerRole in project
Nitin Chhaganlal Jain-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate Form 1.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate Form 3.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Capital Q3 OG.pdf24 Jan 2026
Withdrawal Update Form 3File: CA Certificate Form 3 Dt 31-12-2025 Shankeshwar Capital.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf16 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Capital Q2.pdf16 Dec 2025
Withdrawal Update Form 3File: CA Certificate shree shankeshwar properties.pdf16 Dec 2025
Building plan approvalFile: Sheet No- 1_11zon.pdf29 Nov 2025
Building plan approvalFile: Sheet No- 2.pdf29 Nov 2025
Building plan approvalFile: Sheet No- 3.pdf29 Nov 2025
Building plan approvalFile: Sheet No- 4.pdf29 Nov 2025
Building plan approvalFile: Sheet No-5.pdf29 Nov 2025
Building plan approvalFile: Sheet No-6.pdf29 Nov 2025
Building plan approvalFile: Sheet No-7.pdf29 Nov 2025
Building plan approvalFile: Sheet No-8.pdf29 Nov 2025
Building plan approvalFile: Sheet No- 9.pdf29 Nov 2025
Building plan approvalFile: Sheet No-10.pdf29 Nov 2025
Building plan approvalFile: Sheet No-11.pdf29 Nov 2025
Building plan approvalFile: Sheet No-12.pdf29 Nov 2025
Building plan approvalFile: Sheet No-13_11zon (1).pdf29 Nov 2025
Withdrawal Update Form 1File: Architects Certificate - Form1 Dt 01-07-2025 Shankeshwar Capital (2).pdf29 Nov 2025
Withdrawal Update Form 1File: Architects Certificate - Form1 Dt 01-07-2025 Shankeshwar Capital (2).pdf29 Nov 2025
Withdrawal Update Form 2File: Engineers Certificate - Form 2 Date 30 06 2025 Shankeshwar Capital.pdf29 Nov 2025
Withdrawal Update Form 2File: Engineers Certificate - Form 2 Date 30 06 2025 Shankeshwar Capital.pdf29 Nov 2025
Withdrawal Update Form 3File: CA Certificate Form 3 Date30062025 Shankeshwar Capital.pdf29 Nov 2025
Withdrawal Update Form 3File: CA Certificate Form 3 Date30062025 Shankeshwar Capital.pdf29 Nov 2025
Form 5 (FY 2023-2024)File: form 5 with sign.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: form 5 with sign.pdf30 Sep 2025
Building plan approvalFile: Sheet No- 1.pdf14 Jul 2025
Building plan approvalFile: Sheet No-2.pdf14 Jul 2025
Building plan approvalFile: Sheet No-3.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 4.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 5.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 6.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 7.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 8.pdf14 Jul 2025
Building plan approvalFile: Sheet No-9.pdf14 Jul 2025
Building plan approvalFile: Sheet No-10.pdf14 Jul 2025
Building plan approvalFile: Sheet No-11.pdf14 Jul 2025
Building plan approvalFile: Sheet No- 12.pdf14 Jul 2025
Building plan approvalFile: Sheet No-13.pdf14 Jul 2025
Building plan approvalFile: Sheet No 1.pdf20 Jun 2025
Building plan approvalFile: Sheet No 2.pdf20 Jun 2025
Building plan approvalFile: Sheet No 3.pdf20 Jun 2025
Building plan approvalFile: Sheet No 4.pdf20 Jun 2025
Building plan approvalFile: Sheet No 6.pdf20 Jun 2025
Building plan approvalFile: Sheet No 7.pdf20 Jun 2025
Building plan approvalFile: Sheet No 8_11zon.pdf20 Jun 2025
Building plan approvalFile: Sheet No 9.pdf20 Jun 2025
Building plan approvalFile: Sheet No 11.pdf20 Jun 2025
Building plan approvalFile: Sheet No 12.pdf20 Jun 2025
Building plan approvalFile: Sheet No 13.pdf20 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Dt 31032025 - Shankeshwar Capital_compressed.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 - Dt 17042025 Shankeshwar Capital.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dt 01 04 2025 Shankeshwar Capital.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3 Dt 12 03 2025 Shankeshwar Capital_compressed.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Form 2 Dt 31 12 2024 Shankeshwar Capital.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate - Form 5 Dt 26 08 2024 Capital.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 07 24 Capital.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 30 09 24 Capital_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital 30 06 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital 30 09 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital 31 12 24.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSP CA CERTIFICATE Q1.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSP CA CERTIFICATE Q2.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form t Shankeshwar Capital.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer's Certificate For Quality Assurance FORM 2A.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shankeshwar Capital Q4.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - From 2 30062023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - From 2 30092023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - From 2 31122023.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 Final_compressed.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 Final_compressed.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 Final_compressed.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Shankeshwar Capital.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf20 Jan 2024

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shankeshwar GravityP52100024786NA, Pune-Mar 2020CompletedDec 2025Apr 2024
Shankeshwar CrystalP52100032452DUDULGAON, Pune-Jan 2022CompletedDec 2025Feb 2025
Shankeshwar RoyaleP52100020786Chikhali, Pune-May 2019CompletedSep 2024Sep 2024
Shankeshwar WisdomP52100023359Moshi, Pune-Dec 2019CompletedSep 2023Mar 2023
Shankeshwar PrestigeP52100017693Moshi, Pune-Sep 2018CompletedDec 2022Jun 2022
NilayP52100002147Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedDec 2022Jun 2022
Shankeshwar DarshanP52100000830Pimpri, Pune-Jul 2017CompletedDec 2021Registered original: Dec 2019Dec 2019
Shankeshwar CrimsonP52100000087Chikhali, Pune-Jun 2017CompletedDec 2019Dec 2019
Shankeshwar IconGAT No. 11125-CompletedJun 2017Apr 2017
Shankeshwar VillaSurvey No. 216 P64-CompletedMay 2017Apr 2017
Shankeshwar DreamsGAT No.52447-CompletedMar 2017Mar 2016

How this compares with Pune

8%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankeshwar Capital on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmShankeshwar CapitalCompleted 80Lapsed / revoked 42Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: Nitin Chhaganlal Jain

Nitin Chhaganlal Jain has 5 registrations on MahaRERA, including Shankeshwar Crimson and Shankeshwar Prestige. Its filings disclose 12 earlier MahaRERA projects: declares 11 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shankeshwar Capital is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankeshwar Capital?

The registered promoter entity is Nitin Chhaganlal Jain, an individual as per the filing. Its GSTIN 27AAQPB0293C1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankeshwar Capital?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shankeshwar Capital?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankeshwar Capital?

The professionals named in the filing: Architect: Pramod S Shinde; Engineer: G. A. Bhilare Consultants Pvt. Ltd.; Engineer: Raghuveer jambhale; Chartered Accountant: NPSR & Associates - CA. Vivek N. Lahoti; Chartered Accountant: NPSR & Associates; Chartered Accountant: Ganesh Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankeshwar Capital?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankeshwar Capital. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankeshwar Capital to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.