Shankeshwar Crimson

By Nitin Chhaganlal Jain

RG-MH-02096 · RERA P52100000087 · Last updated on MahaRERA portal: 18 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 10 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
10 of 11Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Shankeshwar Crimson is a Mixed project by Nitin Chhaganlal Jain in Pune, Maharashtra, registered with MahaRERA as P52100000087 on 28 Jun 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.

At a glance

Project

  • NameShankeshwar Crimson
  • TypeMixed
  • Location
    • Jadhavwadi
    • Chikhali
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000087
  • ReraGenie IDRG-MH-02096

Builder

  • NameNitin Chhaganlal Jain
  • Entity typeIndividual
  • GSTIN27AAQPB0293C1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects12 →

Key dates

this monthRegisteredJun 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

Building 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered61

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,722 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Tukaram Nivrutti JadhavPimpri Chinchawad (M Corp.)Pune
Vaishali Tukaram JadhavPimpri Chinchawad (M Corp.)Pune
Ramdas Nivrutti JadhavPimpri Chinchawad (M Corp.)Pune
Sadhana Ramdas JadhavPimpri Chinchawad (M Corp.)Pune
Sandeep Rasiklal ShahPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI5227.0
Proposed, not sanctioned4,296 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 119, City Survey no 1467, Opp Jayhind School, Jamtani Chowk, Pimpri, Pune 411017

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Design Group Usha Rangarajan
EngineerG A Bhilare Consultants Pvt Ltd
PartnerRole in project
Nitin Chhaganlal Jain-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Aug 2021

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: 1-1-20_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 1-21-39_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 2-1-20_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 2-21-39_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 3-1-15_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 3-16-31_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 4-1-15_11zon.pdf18 Oct 2023
Status of ConveyanceFile: 4-16-30_11zon.pdf18 Oct 2023
OtherFile: SSP - CA Certificate (Form 5)_compressed.pdf19 Aug 2021
OtherFile: Architect Certificate - Form 4.pdf19 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_compressed.pdf9 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Crimson.pdf8 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Form 1.pdf12 Jun 2019
Form 2AFile: Engineers Certificate Form 2A_compressed.pdf12 Jun 2019
Certificates of CA (Form 3)File: 190412 CA Certificate (Crimson)_compressed.pdf3 May 2019
Certificates of CA (Form 5)File: SSP - CA Certificate (Form 5)_compressed.pdf2 May 2019
Certificates of CA (Form 5)File: SSP - CA Certificate (Form 5)_compressed.pdf2 May 2019
Certificates of Architect (Form 4)File: Architect Certificate - Form 4.pdf2 May 2019
OtherFile: Completion Certificate_compressed.pdf2 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crimson Architect Certificate_compressed.pdf29 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crimson Engineers certificate.pdf29 Mar 2019
Certificates of CA (Form 3)File: Crimson CA Certificate_compressed.pdf25 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - compressed.pdf19 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf14 Dec 2018
Certificates of CA (Form 5)File: Shankeshwar Crimson-From 5-compressed.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-compressed.pdf6 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf6 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crimson Architect Certificate.pdf26 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crimson Architect Certificate-compressed.pdf26 Jun 2018
Certificates of CA (Form 3)File: Crimson - CA Certificate-compressed.pdf26 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Crimson 20 JUNE 2018.pdf23 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crimson Architect Certificate-compressed.pdf24 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shankeshwar Crimson - Engineer Certificate.PDF24 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf3 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate (compressed).pdf3 Jan 2018
Certificates of CA (Form 3)File: CA Certificate (compressed).pdf3 Jan 2018
Building plan approval or NA orderFile: default 0005.pdf26 Sep 2017
Building plan approval or NA orderFile: default 0006.pdf26 Sep 2017
Building plan approval or NA orderFile: default 00007.pdf26 Sep 2017
Layout approvalFile: default 0005.pdf26 Sep 2017
Layout approvalFile: default 0006.pdf26 Sep 2017
Layout approvalFile: default 00007.pdf26 Sep 2017
Copy of Layout Approval (in case of layout)File: default 0005.pdf26 Sep 2017
Copy of Layout Approval (in case of layout)File: default 0006.pdf26 Sep 2017
Copy of Layout Approval (in case of layout)File: default 00007.pdf26 Sep 2017
Building Plan Approval (IOD)File: default 0005.pdf26 Sep 2017
Building Plan Approval (IOD)File: default 0006.pdf26 Sep 2017
Building Plan Approval (IOD)File: default 00007.pdf26 Sep 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf26 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf26 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf26 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf26 Sep 2017
Certificates of CA (Form 3)File: CA Certificate.pdf26 Sep 2017
Layout approvalFile: Order Blue Print-1.pdf21 Jun 2017
Layout approvalFile: Order Blue Print-2.pdf21 Jun 2017
Copy of Layout Approval (in case of layout)File: Order Blue Print-1.pdf21 Jun 2017
Copy of Layout Approval (in case of layout)File: Order Blue Print-2.pdf21 Jun 2017
Layout approvalFile: Temp00067 (1).pdf20 Jun 2017
Layout approvalFile: Temp00068 (1).pdf20 Jun 2017
Layout approvalFile: Temp00070 (1).pdf20 Jun 2017
Building plan approval or NA orderFile: Temp00067 (1).pdf20 Jun 2017
Building plan approval or NA orderFile: Temp00068 (1).pdf20 Jun 2017
Building plan approval or NA orderFile: Temp00070 (1).pdf20 Jun 2017
PAN CardFile: New Pan Card of Nitin Sir.pdf20 Jun 2017
Copy of the legal title reportFile: Search Report Shankeshwar Crimson.pdf20 Jun 2017
Details of encumbrancesFile: Details of encumbrances.pdf20 Jun 2017
Copy of Layout Approval (in case of layout)File: Temp00067 (1).pdf20 Jun 2017
Copy of Layout Approval (in case of layout)File: Temp00068 (1).pdf20 Jun 2017
Copy of Layout Approval (in case of layout)File: Temp00070 (1).pdf20 Jun 2017
Building Plan Approval (IOD)File: Temp00067 (1).pdf20 Jun 2017
Building Plan Approval (IOD)File: Temp00068 (1).pdf20 Jun 2017
Building Plan Approval (IOD)File: Temp00070 (1).pdf20 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate june 2017.pdf20 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: crimson latest commencement 160117.pdf20 Jun 2017
Declaration in FORM BFile: Declaration (Nitin).pdf20 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf20 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf20 Jun 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf20 Jun 2017
Proforma of Allotment letterFile: Allotment Letter and Agreement.pdf20 Jun 2017

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shankeshwar CapitalP52100048864Chikhali, Pune78Jan 2023OngoingDec 2027Not due yet
Shankeshwar GravityP52100024786NA, Pune-Mar 2020CompletedDec 2025Apr 2024
Shankeshwar CrystalP52100032452DUDULGAON, Pune-Jan 2022CompletedDec 2025Feb 2025
Shankeshwar RoyaleP52100020786Chikhali, Pune-May 2019CompletedSep 2024Sep 2024
Shankeshwar WisdomP52100023359Moshi, Pune-Dec 2019CompletedSep 2023Mar 2023
Shankeshwar PrestigeP52100017693Moshi, Pune-Sep 2018CompletedDec 2022Jun 2022
NilayP52100002147Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedDec 2022Jun 2022
Shankeshwar DarshanP52100000830Pimpri, Pune-Jul 2017CompletedDec 2021Registered original: Dec 2019Dec 2019
Shankeshwar IconGAT No. 11125-CompletedJun 2017Apr 2017
Shankeshwar VillaSurvey No. 216 P64-CompletedMay 2017Apr 2017
Shankeshwar DreamsGAT No.52447-CompletedMar 2017Mar 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankeshwar Crimson on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmShankeshwar CrimsonCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Nitin Chhaganlal Jain

Nitin Chhaganlal Jain has 5 registrations on MahaRERA, including Shankeshwar Crimson and Shankeshwar Prestige. Its filings disclose 12 earlier MahaRERA projects: declares 11 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shankeshwar Crimson is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankeshwar Crimson?

The registered promoter entity is Nitin Chhaganlal Jain, an individual as per the filing. Its GSTIN 27AAQPB0293C1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankeshwar Crimson?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shankeshwar Crimson?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankeshwar Crimson?

The professionals named in the filing: Architect: Landmark Design Group Usha Rangarajan; Engineer: G A Bhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankeshwar Crimson?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankeshwar Crimson. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankeshwar Crimson to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.