Home / Browse projects / Pune, Maharashtra / Shankeshwar Sparsh

Registered No litigation declared Others project

Shankeshwar Sparsh

By Munisuvrat Properties

RG-MH-40919 · RERA P52100055256 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
28 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 70%
263 of 474Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

Shankeshwar Sparsh is a Others project by Munisuvrat Properties in Pune, Maharashtra, registered with MahaRERA as P52100055256 on 14 Mar 2024. Possession is promised by 31 Dec 2028. 211 of the 474 units on this registration are recorded sold or booked, and 28 of 44 construction stages are filed complete.

At a glance

Project

  • NameShankeshwar Sparsh
  • TypeOthers
  • Location
    • Kudale Vasti
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055256
  • ReraGenie IDRG-MH-40919

Builder

  • NameMunisuvrat Properties
  • Entity typePartnership
  • GSTIN27AAZFM5975D1ZJ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNitin Chhaganlal Jain, Santoshi Nitin Jain, Mahavir Basantilal Chopra
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed133 files

Current status

45%211 of 474 units booked
33.9%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA14101270127
Building BNA22181910191
Building CNA14101180118
Shopping ComplexNA2203838

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 70%.

Building A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shopping Complex64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed561

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots561
Closed/Covered155
Open Space406
BuildingClosed/CoveredOpen SpaceTotal
Building A108236344
Building B7714
Building C10163173
Shopping Complex30030

Land and ownership16

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,102 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 May 2025
LandownerVillageDistrict
Balasaheb Pandharinath KudaleMoshiPune
Ashok Dattu KudaleMoshiPune
Popat Pandharinath KudaleMoshiPune
Ramdas Haribhau KudaleMoshiPune
Sandip Kundalik KudaleMoshiPune
Navnath Dattoba KudaleMoshiPune
Pravin Dnyaneshwar KudaleMoshiPune
Avinash Dnyaneshwar KudaleMoshiPune
Somnath Dattoba KudaleMoshiPune
Sachin Laxman KudaleMoshiPune
Santosh Kundlik KudaleMoshiPune
Vimal Laxman KudaleMoshiPune
Aruna Dnyanoba KudaleMoshiPune
Laxmibai Pandharinath KudaleMoshiPune
Sundarabai Dattu KudaleMoshiPune
Vijay Dnyanoba KudaleMoshiPune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal corporation
Permissible FSI36366.99
Proposed, not sanctioned14,123 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOpp PCMC Building, Pimpri Pune
Estimated costRs 130.00 cr
Cost incurredRs 44.03 cr
Work done33.87%
BuildingWingEstimatedIncurred
Building BNARs 53.67 crRs 17.08 cr
Building ANARs 35.81 crRs 11.39 cr
Building CNARs 23.39 crRs 7.44 cr
-NARs 10.00 crRs 5.85 cr
Shopping ComplexNARs 7.13 crRs 2.27 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Karan Darda Architects - Mr. Karan Darda
EngineerRaghuveer Jambhale
Chartered AccountantNPSR & Associates - CA. Nandkishor Lahoti
Chartered AccountantNPSR & Associates
Chartered AccountantGanesh Sunil Mandlecha
PartnerRole in project
Munisuvrat Properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architects Certificate_compressed.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf27 Jun 2026
Withdrawal Update Form 1File: Architects Certificate Form 1 Dt 14012026 S Sparsh (1)_1_11zon.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q3 working.pdf19 Jan 2026
Withdrawal Update Form 3File: CA Certificate Form 3.pdf19 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - Form 1 Date 30-09-2025 Shankeshwar Sparsh.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2 working.pdf15 Jan 2026
Withdrawal Update Form 3File: CA Certificate Form 3 - Dt 30-09-2025 S Sparsh_1_11zon.pdf15 Jan 2026
Form 5 (FY 2024-2025)File: form 5 with sign.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: form 5 with sign.pdf30 Sep 2025
Withdrawal Update Form 1File: Archiects Certificate - Form 1 Dt- 10-07-2025 Shankeshwar Sparsh.pdf23 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (1) with sign.pdf23 Sep 2025
Withdrawal Update Form 3File: CA Certificate - From 3 Dt30-06-2025 Shankeshwar Sparsh_11zon.pdf23 Sep 2025
Withdrawal Update Form 1File: Architects Certificate - Form 1.pdf30 Jul 2025
Withdrawal Update Form 2File: Engineers Certificate Form 2 Q1.pdf30 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate-Sparsh_compressed.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect' Certificate Dt 07-04-2025 Shankeshwar Sparsh_compressed.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Dt 31-03-2025 - Shankeshwar Sparsh_compressed.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Form 2 Dt 17-04-2025 Sparsh.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: nEW Form 3 Sparsh dt - 1902025.pdf12 Mar 2025
Declaration about Commencement CertificateFile: Declaration about CC - 05032025.pdf12 Mar 2025
Layout approvalFile: Sheet No 1_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 2_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 3_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 4_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 5_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 6_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 7_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 8_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 9_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 10_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 11_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 12_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 13_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 14_compressed.pdf11 Mar 2025
Building plan approvalFile: Sheet No 15_compressed.pdf11 Mar 2025
Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed.pdf11 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate Sparsh_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 2_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 3_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 4_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 5_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 6_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 7_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 8_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 9_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 10_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 11_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 12_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 13_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 14_compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 15_compressed.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dt 31 12 2024 Shankeshwar Sparsh_compressed.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh 30 06 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh dt 30 09 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Dt 31 12 2024 - Shankeshwar Sparsh_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh 30 06 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh dt 30 09 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Dt 31 12 2024 - Shankeshwar Sparsh_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh 30 06 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sparsh dt 30 09 24_compressed.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Dt 31 12 2024 - Shankeshwar Sparsh_compressed.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q2.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q2.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Q2.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300624 SPARSH_compressed (1).pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300924 SPARSH_compressed.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300624 SPARSH_compressed (1).pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300924 SPARSH_compressed.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300624 SPARSH_compressed (1).pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300924 SPARSH_compressed.pdf30 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Undertaking- Sparsh V1.pdf19 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrance Undertaking- Sparsh V1.pdf19 Jun 2024
Other - LegalFile: ilovepdf_merged (3).pdf6 Mar 2024
Other - LegalFile: Release Deed - 12404-2022 Anita.pdf6 Mar 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Shankeshwar GravityP52100024786NA, PuneMar 2020CompletedDec 2025Apr 2024

How this compares with Pune

45%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankeshwar Sparsh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

2 kmShankeshwar SparshCompleted 51Lapsed / revoked 26Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: Munisuvrat Properties

Munisuvrat Properties has 3 registrations on MahaRERA, including Shankeshwar Gravity and Shankeshwar Sparsh. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shankeshwar Sparsh is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankeshwar Sparsh?

The registered promoter entity is Munisuvrat Properties, a partnership as per the filing. Its GSTIN 27AAZFM5975D1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankeshwar Sparsh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shankeshwar Sparsh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankeshwar Sparsh?

The professionals named in the filing: Architect: M/s. Karan Darda Architects - Mr. Karan Darda; Engineer: Raghuveer Jambhale; Chartered Accountant: NPSR & Associates - CA. Nandkishor Lahoti; Chartered Accountant: NPSR & Associates; Chartered Accountant: Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankeshwar Sparsh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankeshwar Sparsh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankeshwar Sparsh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.