Registered No litigation declared Mixed project

Shankeshwar World

By Nitin Chhaganlal Jain

RG-MH-32740 · RERA PM1260002500768 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 11 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
3 of 151Construction stages doneacross 16 buildings; furthest along: Excavation, 90%
326 of 326Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

Shankeshwar World is a Mixed project by Nitin Chhaganlal Jain in Pune, Maharashtra, registered with MahaRERA as PM1260002500768 on 15 Sep 2025. Possession is promised by 30 Jun 2030. 0 of the 326 units on this registration are recorded sold or booked, and 3 of 151 construction stages are filed complete.

At a glance

Project

  • NameShankeshwar World
  • TypeMixed
  • Location
    • 108/2/A AND 108/2/B
    • Wada Road
    • Sangam Garden
    • Rajgurunagar
    • Rajgurunagar (CT)
    • Khed
    • Pune
    • 410505
  • Pincode410505
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1260002500768
  • ReraGenie IDRG-MH-32740

Builder

  • NameNitin Chhaganlal Jain
  • Entity typeIndividual
  • GSTIN27AAQPB0293C1ZZ
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects12 →

Key dates

this monthRegisteredSep 2025PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Sep 2025
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings16 building records
  • Documents filed35 files

Current status

0%0 of 326 units booked
3.3%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial BuildingNA5402626
Building ANA9740040
Building BNA9742042
Building CNA9742042
Building DNA9742042
Building ENA9742042
Building FNA9742042
Building GNA9742042
Unit A BUnit A22101
Unit A BUnit B22101
Unit C DUnit C22101
Unit C DUnit D22101
Unit E FUnit E22101
Unit E FUnit F22101
Unit G HUnit G22101
Unit G HUnit H22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building16

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 151 construction stages are filed complete across 16 buildings. The stage furthest along is Excavation, at 90%.

Commercial Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B9%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C9%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D9%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E10%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building F10%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building G10%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit A B · wing Unit A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit A B · wing Unit B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit C D · wing Unit C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit C D · wing Unit D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit E F · wing Unit E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit E F · wing Unit F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit G H · wing Unit G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Unit G H · wing Unit H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed289

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots289
Closed/Covered130
Open Space7
Basement152
BuildingClosed/CoveredOpen SpaceBasementTotal
Commercial Building07512
Building A1702138
Building B1802139
Building C1902140
Building D1902140
Building E1902140
Building F1902140
Building G1902140

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,615 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025
LandownerVillageDistrict
Dilip Shankar Sandbhor-Pune
Dattatray Shankar SandbhorRajgurunagar (CT)Pune
Pushpa Subhash KaleKalewadi DarekarwadiPune
Ranjana Shankar SandbhorRajgurunagar (CT)Pune
Ramdas Chimaji SandbhorPune (M Corp.)Pune
Vitthal Chimaji SandbhorRajgurunagar (CT)Pune
Narayan Chimaji SandbhorSandbhorwadiPune
Kisan Chimaji SandbhorSandbhorwadiPune

Approvals and building plan

Sanctioning authorityRajgurunagar Municipal Council
Permissible FSI31512.58
Proposed, not sanctioned21,605 sq m
Buildings approved12
Buildings sanctioned12

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT N0. 119, CITY SURVEY NO. 1467, OPP. TO JAIHIND SCHOOL, JAMTANI CHOWK, PIMPRI, PUNE-411017
Estimated costRs 33.00 cr
Cost incurredRs 1.09 cr
Work done3.31%
BuildingWingEstimatedIncurred
Building BNARs 4.37 crRs 6.56 lakh
Building CNARs 4.37 crRs 6.56 lakh
Building DNARs 4.37 crRs 6.56 lakh
Building ENARs 4.37 crRs 6.56 lakh
Building FNARs 4.37 crRs 6.56 lakh
Building GNARs 4.37 crRs 6.56 lakh
Commercial BuildingNARs 1.99 crRs 2.98 lakh
-NARs 1.50 crRs 62.00 lakh
Building ANARs 1.25 crRs 1.88 lakh
Unit A BUnit ARs 27.70 lakhRs 41,590
Unit A BUnit BRs 27.70 lakhRs 41,590
Unit C DUnit CRs 24.80 lakhRs 37,238

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKARAN DHANYAKUMAR DARDA
ArchitectPratik Popat Patole
EngineerRaghuveer Shivaji Jambhale
Chartered AccountantVivek Nandkishor Lahoti
Chartered AccountantGanesh Sunil Mandlecha
PartnerRole in project
Nitin Chhaganlal Jain-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate Form 1.pdf22 Jun 2026
Withdrawal Update Form 1File: Architects Certificate Form 1_compressed.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 Shankeshwar World.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 Shankeshwar World.pdf22 Jun 2026
Layout approvalFile: main pages-11.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-1.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-2.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-3.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-4.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-5.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-6.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-7.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-8.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-9.pdf4 Feb 2026
Building plan approvalFile: revise sanction plan-10.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 Dt 05082025 S - World_11zon.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 Dt 16012026 Shankeshwar World.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q 2.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q 3.pdf29 Jan 2026
Withdrawal Update Form 3File: CA Certificate Form 3_1_11zon.pdf29 Jan 2026
Withdrawal Update Form 3File: C A CERTIFICATE 200126_11zon.pdf29 Jan 2026
Layout approvalFile: Main Layout Compressed NEW.pdf10 Sep 2025
Declaration and undertaking (Annexure A)File: Old Declaration Cum Undertaking Annexure A.pdf14 Jul 2025
Building plan approvalFile: Commercial.pdf4 Jun 2025
Building plan approvalFile: IOD A.pdf4 Jun 2025
Building plan approvalFile: IOD B.pdf4 Jun 2025
Building plan approvalFile: IOD C.pdf4 Jun 2025
Building plan approvalFile: IOD D.pdf4 Jun 2025
Building plan approvalFile: IOD E.pdf4 Jun 2025
Building plan approvalFile: IOD F.pdf4 Jun 2025
Building plan approvalFile: IOD G.pdf4 Jun 2025
Building plan approvalFile: Bunglow 1.pdf4 Jun 2025
Building plan approvalFile: Bunglow 2.pdf4 Jun 2025

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shankeshwar CapitalP52100048864Chikhali, Pune78Jan 2023OngoingDec 2027Not due yet
Shankeshwar GravityP52100024786NA, Pune-Mar 2020CompletedDec 2025Apr 2024
Shankeshwar CrystalP52100032452DUDULGAON, Pune-Jan 2022CompletedDec 2025Feb 2025
Shankeshwar RoyaleP52100020786Chikhali, Pune-May 2019CompletedSep 2024Sep 2024
Shankeshwar WisdomP52100023359Moshi, Pune-Dec 2019CompletedSep 2023Mar 2023
Shankeshwar PrestigeP52100017693Moshi, Pune-Sep 2018CompletedDec 2022Jun 2022
NilayP52100002147Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedDec 2022Jun 2022
Shankeshwar DarshanP52100000830Pimpri, Pune-Jul 2017CompletedDec 2021Registered original: Dec 2019Dec 2019
Shankeshwar CrimsonP52100000087Chikhali, Pune-Jun 2017CompletedDec 2019Dec 2019
Shankeshwar IconGAT No. 11125-CompletedJun 2017Apr 2017
Shankeshwar VillaSurvey No. 216 P64-CompletedMay 2017Apr 2017
Shankeshwar DreamsGAT No.52447-CompletedMar 2017Mar 2016

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankeshwar World on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rajgurunagar13,700+ in Pune

2 kmShankeshwar WorldCompleted 9Lapsed / revoked 8Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Nitin Chhaganlal Jain

Nitin Chhaganlal Jain has 5 registrations on MahaRERA, including Shankeshwar Crimson and Shankeshwar Prestige. Its filings disclose 12 earlier MahaRERA projects: declares 11 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shankeshwar World is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankeshwar World?

The registered promoter entity is Nitin Chhaganlal Jain, an individual as per the filing. Its GSTIN 27AAQPB0293C1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankeshwar World?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shankeshwar World?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankeshwar World?

The professionals named in the filing: Architect: KARAN DHANYAKUMAR DARDA; Architect: Pratik Popat Patole; Engineer: Raghuveer Shivaji Jambhale; Chartered Accountant: Vivek Nandkishor Lahoti; Chartered Accountant: Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankeshwar World?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankeshwar World. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankeshwar World to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.