Completed No litigation declared Residential / Group Housing project

SENSORIUM, PHASE III

By Joyville Shapoorji Housing Private Limited

RG-MH-16147 · RERA P52100024965 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 10 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 50 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: External plumbing and external plaster, 92%
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

SENSORIUM, PHASE III is a Residential / Group Housing project by Joyville Shapoorji Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100024965 on 12 Mar 2020. The registration is recorded completed; possession was promised by 30 May 2025.

At a glance

Project

  • NameSENSORIUM, PHASE III
  • TypeResidential / Group Housing
  • Location
    • Village Maan
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024965
  • ReraGenie IDRG-MH-16147

Builder

  • NameJoyville Shapoorji Housing Private Limited
  • Entity typeCompany
  • CINU70109MH2007PTC166942
  • GSTIN27AACCD9800E1ZV
  • DirectorsRanjana Agarwal, Subrata Dutta Gupta, Sandeep Awasthi, Anuj Puri, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri and 29 more
  • ChairpersonsVenkatesh Gopalkrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan and 1 more
  • Managing DirectorsSriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan and 1 more
  • Other registrations50 more →
  • Completed23 of 51
  • No longer live11 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects14 →

Key dates

this monthRegisteredMar 2020PromisedMay 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Mar 2020
  • Promised completion30 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ELATION BUILDING BNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 92%.

ELATION BUILDING B: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%

Progress on shared amenities17

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes76%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes67%
Storm Water DrainsYes36%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered ParkingYes0%
Club HouseYes5%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,282 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Sep 2024

Approvals and building plan

Permissible FSI9531.7
Proposed, not sanctioned9,532 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jehagir Building, MG Road, Fort Mumbai 400001

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikalpan Architects & Planners
ArchitectMSK Architectsand Associates
ArchitectMSK Arch and Associates
EngineerSandip E Kaspale
EngineerAkshay Lalit Kasar
Chartered AccountantHarshad Doshi
Chartered AccountantB R Nagda & Co
Chartered AccountantPooja Rajendrakumar Boob
PartnerRole in project
Joyville Shapoorji Housing Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2024

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_Hinjewadi Phase 3.pdf29 Sep 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sensorium_Phase_3_-March_24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_June 24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Tower B.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Ph3.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202406 RERA Certificate Ph 3 - RERA.pdf20 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf5 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Tower B.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Phase 3.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_March 24.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TOWER B.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Phase 3.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403 RERA Certificate Ph 3 - RERA.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArCert2-3TowerB(Elation).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)-01-07-2020.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: joyvillephase3bldg1.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sensoriumphase3.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 3 Tower B (Elation) JULY 20.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Elation march20.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sensorium Phase 3- 30th June 2020.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sensorium Phase 3- 30th June 2020.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sensorium Phase 3 - 31st Dec 2020.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_December 23.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower B.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase 3.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 RERA Certificate Ph 3 - RERA.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase 3.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_September 23.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202309 RERA Certificate Ph 3 - RERA.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sensorium Phase 3 FY 22-23.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sensorium Phase 3.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_June 23.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202306 RERA Certificate Ph 3 - RERA.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_March 23.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Phase3.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202303 RERA Certificate Ph 3 - RERA.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Sensorium Ph3.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202212 RERA Certificate Ph 3 - RERA.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 3 Tower B (Elation).pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_December 22.pdf7 Jan 2023
Disclosure of sold/ booked inventoryFile: Phase 3.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Phase 3.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202209 RERA Certificate Ph 3 - RERA.pdf13 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 3 Tower B (Elation).pdf6 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_September 22.pdf6 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Plot-2 - Phase-3- Sensorium - Elation - Tower-B.pdf6 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Hinjewadi Plot 2 Phase 3 Signed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi Plot 2 Phase 3 Signed.pdf29 Sep 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 3.pdf14 Sep 2022
Disclosure of sold/ booked inventoryFile: Phase 3.pdf25 Aug 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 3.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 3.pdf30 Jul 2022
PAN CardFile: Joyville PAN.pdf20 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hinjawadi Phase 3 Certificate.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 3 Tower B (Elation).pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_June 22.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Plot-2 - Phase-3- Sensorium - Elation - Tower-B.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 3.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202206 RERA Certificate Ph 3 - RERA.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Plot-2 - Phase-3- Sensorium - Elation - Tower-B.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202203 RERA Certificate Ph 3 - RERA.pdf3 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 3 Tower B _3rd Phase.pdf2 Jun 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf13 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 3 Tower B (Elation)_March 22.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf30 Mar 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf10 Mar 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf9 Mar 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf28 Feb 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf4 Feb 2022
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE III - PHASE III.pdf20 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202112 RERA Certificate Ph 3 - RERA.pdf18 Jan 2022

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mahindra Citadel Phase 1P52100047656Pimpri, Pune448Nov 2022OngoingJun 2028Not due yet
Mahindra Happinest Tathawade Phase 2P52100045388Tathawade, Pune314May 2022OngoingMay 2027Not due yet
Nest EWSP52100045279Tathawade, Pune89May 2022OngoingJan 2027Not due yet
Happinest Tathawade Phase-1P52100028049Tathawade, Pune-Jan 2021OngoingJan 2027Not due yet
Centralis Tower 2P52100019393Pimpri, Pune-Jan 2019CompletedAug 2023Aug 2023
Centralis Tower 1P52100019406Pimpri, Pune-Jan 2019CompletedAug 2023Jul 2023
Centralis Tower 4P52100019375Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centralis Tower 3P52100019407Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centro MHADAP52100030814Pimpri, Pune-Sep 2021CompletedFeb 2023Feb 2023
Antheia A3P52100000171Pimpri, Pune-Jul 2017CompletedDec 2020Dec 2020
Joyville HowrahKWIC Howrah392-CompletedJun 2020Feb 2020
Antheia B4P52100000281Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia A4P52100000210Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia C1P52100000217Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedMar 2018Mar 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SENSORIUM, PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Maan13,700+ in Pune

2 kmSENSORIUM, PHASE IIICompleted 21Lapsed / revoked 12Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Joyville Shapoorji Housing Private Limited

Joyville Shapoorji Housing Private Limited has 51 registrations on MahaRERA, including Joyville Virar Phase 1 and Joyville Virar Phase 2. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 30 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SENSORIUM, PHASE III is delayed beyond 30 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SENSORIUM, PHASE III?

The registered promoter entity is Joyville Shapoorji Housing Private Limited, a company as per the filing. Its CIN U70109MH2007PTC166942 and GSTIN 27AACCD9800E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SENSORIUM, PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SENSORIUM, PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SENSORIUM, PHASE III?

The professionals named in the filing: Architect: Abhikalpan Architects & Planners; Architect: MSK Architectsand Associates; Architect: MSK Arch and Associates; Engineer: Sandip E Kaspale; Engineer: Akshay Lalit Kasar; Chartered Accountant: Harshad Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENSORIUM, PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENSORIUM, PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENSORIUM, PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.