Home / Browse projects / Pune, Maharashtra / SENSORIUM, PHASE II

Registration lapsed No litigation declared Residential / Group Housing project

SENSORIUM, PHASE II

By Joyville Shapoorji Housing Private Limited

RG-MH-16145 · RERA P52100024964 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 10 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
4 of 11Construction stages donefurthest along: Staircases, 96%
1Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

SENSORIUM, PHASE II is a Residential / Group Housing project by Joyville Shapoorji Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100024964 on 12 Mar 2020. Possession was promised by 30 May 2025 and is now 17 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSENSORIUM, PHASE II
  • TypeResidential / Group Housing
  • Location
    • Village Maan
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024964
  • ReraGenie IDRG-MH-16145

Builder

  • NameJoyville Shapoorji Housing Private Limited
  • Entity typeCompany
  • CINU70109MH2007PTC166942
  • GSTIN27AACCD9800E1ZV
  • DirectorsRanjana Agarwal, Subrata Dutta Gupta, Sandeep Awasthi, Anuj Puri, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri and 29 more
  • ChairpersonsVenkatesh Gopalkrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan and 1 more
  • Managing DirectorsSriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan and 1 more
  • Other registrations50 more →
  • Completed23 of 51
  • No longer live11 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects14 →

Key dates

17 months past promisethis monthRegisteredMar 2020PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Mar 2020
  • Promised completion30 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed140 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRISMA BUILDING ENA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 96%.

PRISMA BUILDING E: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities17

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes13%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes47%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes30%
Street LightingYes13%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered ParkingYes0%
Club HouseYes5%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,080 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Sep 2024

Approvals and building plan

Permissible FSI8368.35
Proposed, not sanctioned8,368 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jehagir Building, MG Road, Fort, Mumbai 400001

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikalpan Architects & Planners
ArchitectMSK Architectsand Associates
EngineerSandip E Kaspale
EngineerAkshay Lalit Kasar
Chartered AccountantHarshad Doshi
Chartered AccountantB R Nagda & Co
Chartered AccountantHarshad Doshi & Co.
PartnerRole in project
Joyville Shapoorji Housing Private Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500994Bhaskar Vishnu Jugulkar JoshiJoyville Shapoorji Housing Private Limited21/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Apr 2025

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_Hinjewadi Phase 2.pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202503 RERA Certificate Ph 2 - RERA.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE II - PHASE II.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower E.pdf20 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E BUILDING COMPLETION CERTIFICATE.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE II - PHASE II.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE II - PHASE II.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE II - PHASE II.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_December 24.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202412 RERA Certificate Ph 2 - RERA.pdf19 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_December 24.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202412 RERA Certificate Ph 2 - RERA.pdf19 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202412 RERA Certificate Ph 2 - RERA.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_December 24.pdf19 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sensorium Phase 2.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202409 RERA Certificate Ph 2 - RERA.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_October 24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Sensorium,PHASE II - PHASE II.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sensorium_Phase_2_-_March_24.pdf6 Oct 2024
Form 5 (FY 2023-2024)File: Sensorium_Phase_2_Upload.pdf27 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_June 24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Tower E.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Ph2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202406 RERA Certificate Ph 2 - RERA.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Phase 2.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_March 24.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower E.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Phase 2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403 RERA Certificate Ph 2 - RERA.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArCert2-2TowerE(Prisma).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)-01-07-2020.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 2 Tower E (Prisma) JULY 20.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Prisma March 20.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 1 Tower C(Ambrosia)-03-07-2020.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Snsorium Phase-2-30th June 2020.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sensorium, Phase 2-31st Dec 2020.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sensorium Pahe 2 - 30th Sept 2021.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sensorium Phase 2 -30th March 2020.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_December 23.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower E.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase 2.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 RERA Certificate Ph 2 - RERA.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase 2.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_September 23.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202309 RERA Certificate Ph 2 - RERA.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sensorium Phase 2 FY 22-23.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sensorium Phase 2.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_June 23.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202306 RERA Certificate Ph 2 - RERA.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower E.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_March 23.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Phase2.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202303 RERA Certificate Ph 2 - RERA.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202212 RERA Certificate Ph 2 - RERA.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Sensorium Ph2.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 2 Tower E (Prisma).pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_December 22.pdf7 Jan 2023
Proforma of Agreement for saleFile: AFS.pdf7 Nov 2022
Disclosure of sold/ booked inventoryFile: Phase 2.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Phase 2.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202209 RERA Certificate Ph 2 - RERA.pdf13 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 2 Tower E (Prisma).pdf6 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Plot 2 Phase 2 Tower E (Prisma)_September 22.pdf6 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Plot-2 - Phase-2 - Sensorium - Prisma - Tower-E.pdf6 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Hinjewadi Plot 2 Phase 2 Signed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi Plot 2 Phase 2 Signed.pdf29 Sep 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 2.pdf14 Sep 2022
Disclosure of sold/ booked inventoryFile: Phase 2.pdf25 Aug 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 2.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Sensorium Phase 2.pdf30 Jul 2022
PAN CardFile: Joyville PAN.pdf20 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hinjawadi Phase 2 Certificate.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Plot 2 Phase 2 Tower E (Prisma).pdf19 Jul 2022

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mahindra Citadel Phase 1P52100047656Pimpri, Pune448Nov 2022OngoingJun 2028Not due yet
Mahindra Happinest Tathawade Phase 2P52100045388Tathawade, Pune314May 2022OngoingMay 2027Not due yet
Nest EWSP52100045279Tathawade, Pune89May 2022OngoingJan 2027Not due yet
Happinest Tathawade Phase-1P52100028049Tathawade, Pune-Jan 2021OngoingJan 2027Not due yet
Centralis Tower 2P52100019393Pimpri, Pune-Jan 2019CompletedAug 2023Aug 2023
Centralis Tower 1P52100019406Pimpri, Pune-Jan 2019CompletedAug 2023Jul 2023
Centralis Tower 4P52100019375Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centralis Tower 3P52100019407Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centro MHADAP52100030814Pimpri, Pune-Sep 2021CompletedFeb 2023Feb 2023
Antheia A3P52100000171Pimpri, Pune-Jul 2017CompletedDec 2020Dec 2020
Joyville HowrahKWIC Howrah392-CompletedJun 2020Feb 2020
Antheia B4P52100000281Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia A4P52100000210Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia C1P52100000217Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedMar 2018Mar 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SENSORIUM, PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Maan13,700+ in Pune

2 kmSENSORIUM, PHASE IICompleted 22Lapsed / revoked 11Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Joyville Shapoorji Housing Private Limited

Joyville Shapoorji Housing Private Limited has 51 registrations on MahaRERA, including Joyville Virar Phase 1 and Joyville Virar Phase 2. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 30 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SENSORIUM, PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SENSORIUM, PHASE II is delayed beyond 30 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SENSORIUM, PHASE II?

The registered promoter entity is Joyville Shapoorji Housing Private Limited, a company as per the filing. Its CIN U70109MH2007PTC166942 and GSTIN 27AACCD9800E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SENSORIUM, PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SENSORIUM, PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SENSORIUM, PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SENSORIUM, PHASE II?

The professionals named in the filing: Architect: Abhikalpan Architects & Planners; Architect: MSK Architectsand Associates; Engineer: Sandip E Kaspale; Engineer: Akshay Lalit Kasar; Chartered Accountant: Harshad Doshi; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENSORIUM, PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENSORIUM, PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENSORIUM, PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.