ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Sarode Park Phase 1 - Building No. A

Registered No litigation declared Residential / Group Housing project

Sarode Park Phase 1 - Building No. A

By Narayan Labhu Sarode

RG-MH-49152 · RERA P51600055886 · Last updated on MahaRERA portal: 26 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 75%
35 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Sarode Park Phase 1 - Building No. A is a Residential / Group Housing project by Narayan Labhu Sarode in Nashik, Maharashtra, registered with MahaRERA as P51600055886 on 29 Apr 2024. Possession is promised by 31 Dec 2026. 0 of the 35 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSarode Park Phase 1 - Building No. A
  • TypeResidential / Group Housing
  • Location
    • Near Pathardi Gaon Circle
    • Behind Mhada Building
    • Pathardi
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600055886
  • ReraGenie IDRG-MH-49152

Builder

  • NameNarayan Labhu Sarode
  • Entity typeIndividual
  • GSTIN27AMCPS2335J1ZX
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations7 more →
  • Completed6 of 8
  • Declared earlier projects8 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

0%0 of 35 units booked

Figures as on 26 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No ANA8735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

Building No A: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered44
Open Space36

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area825 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI2599.76
Proposed, not sanctioned2,500 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Arcade, Upendra nagar, Ambad Link Road, Opposite Hotel Excellency Inn, Nashik - 422009

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijaya Consultants
EngineerSagar Shah
Chartered AccountantSaril
Chartered AccountantNirav Shailesh Shah & Co.
PartnerRole in project
Narayan Labhu Sarode-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q1.pdf26 Sep 2025
Form 2File: Form 2 Q1.pdf26 Sep 2025
Form 3File: Form 3 SD Q1.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q1.pdf26 Sep 2025
Form 1File: Form 1 Q2.pdf26 Sep 2025
Form 2File: Form 2 Q2.pdf26 Sep 2025
Form 3File: Form 3 SD Q2.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q2.pdf26 Sep 2025
Form 1File: Form 1 Q3.pdf26 Sep 2025
Form 2File: Form 2 Q3.pdf26 Sep 2025
Form 3File: Form 3 SD 24-25 Q3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-12-2024.pdf26 Sep 2025
Form 1File: Form 1 24-25 Q4.pdf26 Sep 2025
Form 2File: Form 2 24-25 Q4.pdf26 Sep 2025
Form 3File: Form 3 SD 24-25 Q4.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-03-2025.pdf26 Sep 2025
Form 1File: Form 1 25-26 Q1.pdf26 Sep 2025
Form 2File: Form 2 25-26 Q1.pdf26 Sep 2025
Form 3File: Form 3 SD 25-26 Q1.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q1.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf26 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q4.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q3.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q4.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q4.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: Inventory 31-12-2024.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: Inventory 31-03-2025.pdf1 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q1.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q2.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q1.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q2.pdf30 Dec 2024
Other - LegalFile: Plot Purchase Deed.pdf10 Apr 2024
Other - LegalFile: 7-12 Extract.pdf10 Apr 2024
Proforma of Agreement for saleFile: Agreement For Sale.pdf25 Mar 2024
Other - TechnicalFile: Verification of CC.pdf25 Mar 2024
Other - TechnicalFile: Plot Area Breakup.pdf25 Mar 2024
Layout approvalFile: DLR Map.pdf4 Mar 2024
Building plan approvalFile: SP 1.pdf4 Mar 2024
Building plan approvalFile: SP 2.pdf4 Mar 2024
PAN CardFile: PAN.pdf4 Mar 2024
Copy of the legal title reportFile: Title Report.pdf4 Mar 2024
Details of encumbrances concerned to FinanceFile: No Financial Encumbrances.pdf4 Mar 2024
Details of encumbrances concerned to FinanceFile: No Legal Encumbrances.pdf4 Mar 2024
Details of encumbrances concerned to LegalFile: No Financial Encumbrances.pdf4 Mar 2024
Details of encumbrances concerned to LegalFile: No Legal Encumbrances.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: DLR Map.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 1.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 2.pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 Mar 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf4 Mar 2024
Declaration in FORM BFile: Form B.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Mar 2024
CERSAI detailsFile: Cersai Declaration.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf4 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf4 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf4 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf4 Mar 2024
Deviation Report with respect to Allotment letterFile: No Deviation - Allotment Letter.pdf4 Mar 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement For Sale.pdf4 Mar 2024
Other - TechnicalFile: Annexure A Order No 50.pdf4 Mar 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shree Ganesh Row House - BP51600047514Patil Park, Chunchale, Nashik-Nov 2022CompletedDec 2024Apr 2023
KRUSHNA KUNJ PARKP51600021740DATTA NAGAR CHUNCHALE, Nashik-Jul 2019CompletedDec 2024Aug 2020
GOLDEN PARKP51600027510NEAR DATTA MANDIR STOP, CHUNCHALE, Nashik-Dec 2020CompletedJun 2024Mar 2022
Shree Ganesh Row HouseP51600033841Near Papaya Nursery, Patil Park, Nashik-Mar 2022CompletedDec 2023Jul 2022
Sarode SankulP51600018930CHUNCHALE, Nashik-Dec 2018CompletedDec 2021Jul 2019
VASTU PARKDATTA NAGAR CHUNCHALE NASHIK25-CompletedAug 2020Aug 2018
Ashtvinayak Row-HousesDatta Nagar Chunchale Nashik8-CompletedDec 2017Jun 2017

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sarode Park Phase 1 - Building No. A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Behind Mhada Building, Pathardi4,100+ in Nashik

2 kmSarode Park Phase 1 - BuCompleted 110Lapsed / revoked 20Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: Narayan Labhu Sarode

Narayan Labhu Sarode has 8 registrations on MahaRERA, including Vastu Park and Sarode Sankul. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Sarode Park Phase 1 - Building No. A is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sarode Park Phase 1 - Building No. A?

The registered promoter entity is Narayan Labhu Sarode, an individual as per the filing. Its GSTIN 27AMCPS2335J1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sarode Park Phase 1 - Building No. A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sarode Park Phase 1 - Building No. A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sarode Park Phase 1 - Building No. A?

The professionals named in the filing: Architect: Vijaya Consultants; Engineer: Sagar Shah; Chartered Accountant: Saril; Chartered Accountant: Nirav Shailesh Shah & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sarode Park Phase 1 - Building No. A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sarode Park Phase 1 - Building No. A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sarode Park Phase 1 - Building No. A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.