Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 57 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRUDDHI EVERGREENS PHASE-4C is a Others project by Poddar Housing and Development Limited in Thane, Maharashtra, registered with MahaRERA as P51700009156 on 19 Aug 2017. Possession was promised by 27 Dec 2024 and is now 22 months past that date. The completion date has moved by 57 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameSAMRUDDHI EVERGREENS PHASE-4C
- TypeOthers
- Location
- -
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700009156
- ReraGenie IDRG-MH-26229
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion27 Dec 2024
- Revised completionRevised to 27 Dec 2024 (originally 31 Mar 2020)
- Buildings7 building records
- Documents filed124 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 140 | NA | 4 | 0 | 0 | 0 | 0 |
| 141 | NA | 4 | 0 | 0 | 0 | 0 |
| 142 | NA | 4 | 0 | 0 | 0 | 0 |
| 143 | NA | 4 | 0 | 0 | 0 | 0 |
| 144 | NA | 4 | 0 | 0 | 0 | 0 |
| 145 | NA | 4 | 0 | 0 | 0 | 0 |
| 148 | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 18 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
63 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Podiums (if any), at 0%.
14082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
14882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 85% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Parin Shah Architects |
| Engineer | Semac Constultants Pvt. Ltd. |
| Partner | Role in project |
|---|---|
| Poddar Housing and Development Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRequest to extend till 31-Mar-2021 due to heavy rain and flood at Badlapur in monsoon seasons, further delayed in procurement of work and subsequently delayed to complete the project as declared in RERA at the time of RERA registration.
Reason as filed by the promoterWe, Poddar Housing and Development Limited, hereby apply for extension of registration of the project known as SAMRUDDHI EVERGREENS PHASE 4C, project registration certificate bearing No. P51700009156. As required, we hereby submit the following documents and information, namely: - (i) Fees as prescribed for extension as provided under sub-rule (3) of rule 7; (ii) The Consent of the allottee as required are marked and annexed as “Annexure A” (iii) Authenticated copy of approved plan of the project and Tabular form along with Photographs of the building reflecting stage of development works unde
Reason as filed by the promoterThe project was register in 2017 as SAMRUDDHI EVERGREEN PHASE-4C.Initially it got delay because of COVID-19 and after that it was delayed because of reasons beyond control of Promoter.95% of construction work is completed if you give 12 months extension then Promoter will complete the project and handover possession to purchaser
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000395860 | Rajaram Muralidharan | Poddar Samruddhi Evergreens | 12/08/2023 |
| CC12500048 | Rajaram Muralidharan | Poddar Housing and Development Limited | 05/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed124
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf | 18 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form mar 24.pdf | 18 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect for jun 24.pdf | 18 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect for sep 24.pdf | 18 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1 Dec 24.pdf | 18 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 22.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 22.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 23.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 23.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 24.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 24.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 Jun 23.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 Dec 24.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 24.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD PODDAR.pdf | 2 Feb 2024 |
| Declaration in FORM BFile: FORM B.pdf | 29 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 PH IVC New Format.pdf | 29 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Leagl Encumbrances -2.pdf | 8 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Leagl Encumbrances -2.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 8 Dec 2023 |
| CERSAI detailsFile: CERSAI_Search_Report Aditya Birla.pdf | 8 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of other projects.pdf | 8 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate bank account.pdf | 8 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Devoation report allotment.pdf | 8 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report AFS.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PH IV C 22-23.pdf | 28 Apr 2023 |
| Certificates of CA (Form 3)File: Final RERA 4C Certificate.pdf | 13 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PH IC C Architect Dec 21.pdf | 13 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1985_221013124813_001.pdf | 13 Oct 2022 |
| Certificates of CA (Form 3)File: RERA June 2022 PH IV C.pdf | 13 Oct 2022 |
| Certificates of CA (Form 3)File: RERA Mar 22 PH IV C.pdf | 3 Aug 2022 |
| Details of encumbrancesFile: Encumbrance for RERA Samruddhi Evergreens Phase IV-C.pdf | 25 Jul 2022 |
| Declaration in FORM BFile: FORM B for RERA Samruddhi Evergreens Phase IV-C.pdf | 25 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf | 19 Jul 2022 |
| Declaration about Commencement CertificateFile: Commencement Certificate_SIGNED.pdf | 16 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Samruddhi evergreens Engineering Certificate Mar 22_Phase IV-C_signed.pdf | 16 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Samruddhi evergreens Quality Certificate_Dec-21.pdf | 16 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Samruddhi evergreens Quality Certificate_Mar-22.pdf | 16 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Samruddhi evergreens Quality Certificate_Jun-22.pdf | 16 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold and Booked_SIGNED.pdf | 16 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate PH IV C Dec 21.pdf | 4 May 2022 |
| Certificates of CA (Form 3)File: Rera Certificate_Samruddhi Evergreens Phase 4C (1).pdf | 11 Apr 2022 |
| Details of encumbrancesFile: Encumbrance for RERA Samruddhi Evergreens Phase IV-C.pdf | 1 Apr 2022 |
| Declaration in FORM BFile: Form B_Samruddhi Evergreens_Phase 4C_Comp.pdf | 1 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Evergreen Badlapur Phase 4c.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Badlapur Phase IVc- FORM 1 - ARCHITECT'S CERTIFICATE 30-09-2021 (1).pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Evergreen Badlapur Phase 4c.pdf | 7 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 0275_220104181933_001 (1).pdf | 5 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0304_220105165407_001.pdf | 5 Jan 2022 |
| Certificates of CA (Form 3)File: PH IVC RERA SEPT 2021 .pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Badlapur Phase IVc- FORM 1 - ARCHITECT'S CERTIFICATE 30-06-2021.pdf | 4 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE-IVC.pdf | 4 Jan 2022 |
| Certificates of CA (Form 3)File: 2021 10 19 PG PHDL SAMRUDDHI EVERGREEN IV C JUNE 2021.pdf | 9 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Badlapur Phase IVc- FORM 1 - ARCHITECT'S CERTIFICATE 31-03-2021.pdf | 28 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 4C_Compressed.pdf | 28 Sep 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Samruddhi Evergreens 4C Society declaration.pdf | 24 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form-2_Engineers Certificate_Samruddhi Evergreens 4C_Mar-21.pdf | 14 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Samruddhi Evergreens Phase_4C_Form 2A Quality Mar-21.pdf | 14 Jul 2021 |
| Certificates of CA (Form 3)File: 2021 07 13 PG PHDL SEG 4C RERA MARCH 2021-compressed.pdf | 14 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Ceritificate 31-12-20 Phase IV C-compressed.pdf | 4 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-2 - 4C.pdf | 4 Mar 2021 |
| Certificates of CA (Form 3)File: PHDL 4C FORM3.pdf | 3 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE-4C RERA ARCHITECT DEC-20.pdf | 2 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4C_compressed (1).pdf | 4 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4C.pdf | 4 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4C.pdf | 4 Jan 2021 |
| Certificates of CA (Form 3)File: Badlapur 4C-.pdf | 4 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4C- Engineer certificate as on June 2020.pdf | 7 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4c - March 20- 2A.pdf | 7 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4c - June 2020 -2A.pdf | 7 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4C-min.pdf | 1 Oct 2020 |
| Certificates of CA (Form 3)File: 2020 09 14 PHDL SAMRUDDHI EVERGREEN RERA JUNE 2020.pdf | 1 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Architect certificate 31-03-20 4c-compressed.pdf | 30 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 4C - March.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: 2020 09 11 PHDL SAMRUDDHI EVERGREEN RERA MARCH 2020.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate Badlapur 4C-min.pdf | 30 Sep 2020 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PODDAR RIVIERA PHASE - IP51700023508 | MHARAL, Thane | 720 | Dec 2019 | Ongoing | Sep 2025 | Not delivered |
| PODDAR WONDERCITY PHASE - IIP51700020028 | JOVELI VILLAGE, Thane | - | Mar 2019 | Certificate Signed | Jun 2022 | Not delivered |
| SAMRUDDHI EVERGREENS-PHASE-4B | BADLAPUR | 178 | - | Completed | Mar 2019 | Aug 2018 |
| SAMRUDDHI EVERGREENS-PHASE-4A | BADLAPUR | 160 | - | Completed | Mar 2018 | Mar 2018 |
| PODDAR EVERGREEN PHASE 3 | BADLAPUR | 796 | - | Completed | Dec 2015 | Late, Mar 2016 |
| PODDAR BRIO INTERNATIONAL SCHOOL | BADLAPUR | - | - | Completed | Aug 2015 | Aug 2015 |
| CENTRAL HOSPITAL | BADLAPUR | - | - | Completed | Mar 2015 | Mar 2015 |
| PODDAR EVERGREEN PHASE 2 | BADLAPUR | 672 | - | Completed | Dec 2014 | Dec 2014 |
| SAMRUDDHI COMPLEX | BHIVPURI KARJAT | 1,264 | - | Completed | Apr 2014 | Apr 2014 |
| SAMRUDDHI COMMERCIAL COMPLEX | BHIVPURI KARJAT | 45 | - | Completed | Apr 2014 | Apr 2014 |
| PODDAR EVERGREEN PHASE 1 | BADLAPUR | 516 | - | Completed | Aug 2013 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 124 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SAMRUDDHI EVERGREENS PHASE-4C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -7,600+ in Thane
Filed coordinates, straight-line distance. 426 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: Poddar Housing and Development Limited
Poddar Housing and Development Limited has 13 registrations on MahaRERA, including PODDAR SPRAHA DIAMOND PHASE-I and SAMRUDDHI EVERGREENS-PHASE-4A. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SAMRUDDHI EVERGREENS PHASE-4C shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAMRUDDHI EVERGREENS PHASE-4C is delayed beyond 27 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRUDDHI EVERGREENS PHASE-4C?
The registered promoter entity is Poddar Housing and Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRUDDHI EVERGREENS PHASE-4C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMRUDDHI EVERGREENS PHASE-4C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMRUDDHI EVERGREENS PHASE-4C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRUDDHI EVERGREENS PHASE-4C?
The professionals named in the filing: Architect: Parin Shah Architects; Engineer: Semac Constultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRUDDHI EVERGREENS PHASE-4C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback