Home / Browse projects / Thane, Maharashtra / SHREEJI SQUARE PHASE I

Completed No litigation declared Residential / Group Housing project

SHREEJI SQUARE PHASE I

By SHREEJI DEVELOPERS

RG-MH-29910 · RERA P51700029512 · Last updated on MahaRERA portal: 14 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
48 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
210 of 425Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SHREEJI SQUARE PHASE I is a Residential / Group Housing project by SHREEJI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700029512 on 4 Jun 2021. The registration is recorded completed; possession was promised by 30 Jun 2026. 215 of the 425 units on this registration are recorded sold or booked, and 48 of 55 construction stages are filed complete.

At a glance

Project

  • NameSHREEJI SQUARE PHASE I
  • TypeResidential / Group Housing
  • Location
    • ERANJAD
    • BADLAPUR
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029512
  • ReraGenie IDRG-MH-29910

Builder

  • NameSHREEJI DEVELOPERS
  • Entity typePartnership
  • PartnersKIRIT MAVJI PATEL, MOHANLAL HANSRAJ PATEL, MUKESH PUNJABHAI PATEL, PIYUSH RATILAL PATEL, DAKSHA KANTILAL PATEL, REKHA KIRIT PATEL, NIKHIL ZAVERBHAI PATEL
  • Other registrations26 more →
  • Completed11 of 27
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredJun 2021PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jun 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed64 files

Current status

51%215 of 425 units booked
100.0%Work done, per cost certificate

Figures as on 14 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA131355964
BUILDING BNA13131100110
BUILDING ENA6618018
BUILDING CNA13131100110
BUILDING DNA13131230123

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 14 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
BUILDING A11
BUILDING B11
BUILDING E11
BUILDING C11
BUILDING D11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,327 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR NAGAR PARISHAD
Permissible FSI19379.97
Proposed, not sanctioned19,380 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR
Estimated costRs 48.35 cr
Cost incurredRs 48.35 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING CNARs 11.91 crRs 11.91 cr
BUILDING BNARs 11.80 crRs 11.80 cr
BUILDING DNARs 11.03 crRs 11.03 cr
BUILDING ANARs 8.08 crRs 8.08 cr
-NARs 3.85 crRs 3.85 cr
BUILDING ENARs 1.68 crRs 1.68 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectURBAN ARCHITECTS
EngineerS V PATEL AND ASSOCIATES
Chartered AccountantL K DEDHIA AND CO
Chartered AccountantR V THAKKAR & ASSOCIATES
PartnerRole in project
SHREEJI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 SEPT 25.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2 SEPT 25.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 SEPT 25.pdf14 Nov 2025
Form 5 (FY 2024-2025)File: SHREEJI DEVELOPERS FORM 5.pdf11 Nov 2025
Withdrawal Update Form 1File: FORM 1 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 3File: FORM 3 JUN 25.pdf31 Oct 2025
Form 1File: FORM 1 MAR 25.pdf1 Jul 2025
Form 2File: FORM 2 MAR 25.pdf1 Jul 2025
Form 3File: FORM 3 MAR 25.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 25.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUN 22.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEP 22.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DEC 22.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 23.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUN 23.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEP 23.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DEC 23.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUN 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 22.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN 24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 23.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN 23.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 MAR 23.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 22.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JUN 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DEC 24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEP 24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JUN 24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DEC 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEP 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 22.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN 23.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR 23.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A MAR 24.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SHREEJI DEV ( SHREEJI SQUARE P 1).pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A MAR22.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A MAR23.pdf16 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SS.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf19 Apr 2023
Declaration about Commencement CertificateFile: SHREEJI SQUARE - 1 Declaration Certificate.PDF27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SHREEJI SQUARE - 1 Quality Certificate June 2021.PDF27 Jul 2021
Disclosure of sold/ booked inventoryFile: SHREEJI SQUARE - 1 Sold Inventory.PDF27 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed (1).pdf27 May 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE draft.pdf27 May 2021
Building plan approvalFile: BUILDING PLAN.pdf26 May 2021
Layout approvalFile: MYSCAN_20210318_01.pdf26 May 2021
Copy of the legal title reportFile: TITLE.pdf26 May 2021
Details of encumbrancesFile: Non encumbrance certificate.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: MYSCAN_20210318_01.pdf26 May 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf26 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.PDF26 May 2021
Declaration in FORM BFile: FORM B.PDF26 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf26 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf26 May 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREEJI HEIGHTSGHORPADE CHOWK SURVEY NO 30 KATRAP HIGHWAY KATRAP BADLAPUR E64CompletedJan 2013Aug 2012
SHREEJI CENTERGHORPADE CHOWK SURVEY NO 30 KATRAP HIGHWAY BADLAPUR E36CompletedJan 2013Aug 2012

How this compares with Thane

51%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJI SQUARE PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR7,600+ in Thane

2 kmSHREEJI SQUARE PHASE ICompleted 44Lapsed / revoked 14Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: SHREEJI DEVELOPERS

SHREEJI DEVELOPERS has 27 registrations on MahaRERA, including SAHAJANAND INTEGRITY and SHREEJI DREAMS. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREEJI SQUARE PHASE I is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJI SQUARE PHASE I?

The registered promoter entity is SHREEJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJI SQUARE PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJI SQUARE PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJI SQUARE PHASE I?

The professionals named in the filing: Architect: URBAN ARCHITECTS; Engineer: S V PATEL AND ASSOCIATES; Chartered Accountant: L K DEDHIA AND CO; Chartered Accountant: R V THAKKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJI SQUARE PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJI SQUARE PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJI SQUARE PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.