Home / Browse projects / Thane, Maharashtra / MANOHAR VIKAS SHREEJI PARAISO PHASE - 2

Registered No litigation declared Residential / Group Housing project

MANOHAR VIKAS SHREEJI PARAISO PHASE - 2

By DEEPLAXMI DEVELOPERS

RG-MH-28143 · RERA P51700024942 · Last updated on MahaRERA portal: 18 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
60 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 90%
249 of 578Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 237 documents Report an error

MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 is a Residential / Group Housing project by DEEPLAXMI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700024942 on 12 Mar 2020. Possession is promised by 30 Mar 2029. 329 of the 578 units on this registration are recorded sold or booked, and 60 of 77 construction stages are filed complete.

At a glance

Project

  • NameMANOHAR VIKAS SHREEJI PARAISO PHASE - 2
  • TypeResidential / Group Housing
  • Location
    • PANVEL BYPASS ROAD KATRAP
    • KATRAP LAKE
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024942
  • ReraGenie IDRG-MH-28143

Builder

  • NameDEEPLAXMI DEVELOPERS
  • Entity typePartnership
  • PartnersKANTILAL MAVJI PATEL, KIRIT MAVJI PATEL, MOHANLAL HANSRAJ PATEL, MUKESH PUNJA PATEL, MANOHAR KANU MASHKAR, VIKAS RAGHUNATH GUPTE, SHAILESH MANOHAR MHASKAR, VEENA CHANDRASHEKAR MASHKAR, VIKRANT VIKAS GUPTE
  • Other registrations4 more →
  • Completed3 of 5
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2020PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2020
  • Promised completion30 Mar 2029
  • Revised completionNone
  • Buildings7 building records
  • Documents filed237 files

Current status

57%329 of 578 units booked
91.3%Work done, per cost certificate

Figures as on 18 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA1515481058
C WINGNA15159518113
E WINGNA161678078
F WINGNA16161020102
G WINGNA141472072
H WINGNA141471071
I WINGNA141484084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 90%.

B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F WING86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
G WING85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
H WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed220

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots220
Closed/Covered220
BuildingClosed/CoveredTotal
B WING3333
C WING5050
E WING3535
F WING4545
G WING3535
H WING2222

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,766 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR NAGARPARISHAD
Permissible FSI42415.0
Proposed, not sanctioned42,415 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREEJI CENTER KATRAP NAKA BADLAPUR
Estimated costRs 137.00 cr
Cost incurredRs 125.11 cr
Work done91.32%
BuildingWingEstimatedIncurred
C WINGNARs 23.08 crRs 23.08 cr
-NARs 21.00 crRs 9.45 cr
F WINGNARs 18.80 crRs 18.61 cr
I WINGNARs 16.23 crRs 16.23 cr
G WINGNARs 15.57 crRs 15.42 cr
E WINGNARs 15.09 crRs 15.09 cr
H WINGNARs 14.80 crRs 14.80 cr
B WINGNARs 12.43 crRs 12.43 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectURBAN VASTU DESIGNER
EngineerS V PATEL & ASSOCIATES
Chartered AccountantL K DEDHIA & CO
PartnerRole in project
DEEPLAXMI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2029

Documents filed237

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 237 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf18 Dec 2025
Withdrawal Update Form 1File: FORM 1 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 JUN 25.pdf31 Oct 2025
Withdrawal Update Form 3File: FORM 3 JUN 25.pdf31 Oct 2025
Form 1File: FORM 1 JUN 20.pdf21 Jun 2025
Form 2File: FORM 2 JUN 20.pdf21 Jun 2025
Form 3File: FORM 3 JUN 20.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 20.pdf21 Jun 2025
Form 1File: FORM 1 JUN 21.pdf21 Jun 2025
Form 2File: FORM 2 JUN 21.pdf21 Jun 2025
Form 3File: FORM 3 JUN 21.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 21.pdf21 Jun 2025
Form 1File: FORM 1 JUN 22.pdf21 Jun 2025
Form 2File: FORM 2 JUN 22.pdf21 Jun 2025
Form 3File: FORM 3 JUN 22.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 22.pdf21 Jun 2025
Form 1File: FORM 1 JUN 23.pdf21 Jun 2025
Form 2File: FORM 2 JUN 23.pdf21 Jun 2025
Form 3File: FORM 3 JUN 23.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 23.pdf21 Jun 2025
Form 1File: FORM 1 JUN 24.pdf21 Jun 2025
Form 2File: FORM 2 JUN 24.pdf21 Jun 2025
Form 3File: FORM 3 JUN 24.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 24.pdf21 Jun 2025
Form 1File: FORM 1 SEPT 20.pdf21 Jun 2025
Form 2File: FORM 2 SEPT 20.pdf21 Jun 2025
Form 3File: FORM 3 SEPT 20.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 20.pdf21 Jun 2025
Form 1File: FORM 1 SEPT 21.pdf21 Jun 2025
Form 2File: FORM 2 SEPT 21.pdf21 Jun 2025
Form 3File: FORM 3 SEPT 21.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 21.pdf21 Jun 2025
Form 1File: FORM 1 SEPT 22.pdf21 Jun 2025
Form 2File: FORM 2 SEPT 22.pdf21 Jun 2025
Form 3File: FORM 3 SEPT 22.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 22.pdf21 Jun 2025
Form 1File: FORM 1 SEPT 23.pdf21 Jun 2025
Form 2File: FORM 2 SEPT 23.pdf21 Jun 2025
Form 3File: FORM 3 SEPT 23.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 23.pdf21 Jun 2025
Form 1File: FORM 1 SEPT 24.pdf21 Jun 2025
Form 2File: FORM 2 SEPT 24.pdf21 Jun 2025
Form 3File: FORM 3 SEPT 24.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 24.pdf21 Jun 2025
Form 1File: FORM 1 DEC 20.pdf21 Jun 2025
Form 2File: FORM 2 DEC 20.pdf21 Jun 2025
Form 3File: FORM 3 DEC 20.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 20.pdf21 Jun 2025
Form 1File: FORM 1 DEC 21.pdf21 Jun 2025
Form 2File: FORM 2 DEC 21.pdf21 Jun 2025
Form 3File: FORM 3 DEC 21.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 21.pdf21 Jun 2025
Form 1File: FORM 1 DEC 22.pdf21 Jun 2025
Form 2File: FORM 2 DEC 22.pdf21 Jun 2025
Form 3File: FORM 3 DEC 22.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 22.pdf21 Jun 2025
Form 1File: FORM 1 DEC 23.pdf21 Jun 2025
Form 2File: FORM 2 DEC 23.pdf21 Jun 2025
Form 3File: FORM 3 DEC 23.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 23.pdf21 Jun 2025
Form 1File: FORM 1 DEC 24.pdf21 Jun 2025
Form 2File: FORM 2 DEC 24.pdf21 Jun 2025
Form 3File: FORM 3 DEC 24.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 24.pdf21 Jun 2025
Form 1File: FORM 1 MAR 20.pdf21 Jun 2025
Form 2File: FORM 2 MAR 20.pdf21 Jun 2025
Form 3File: FORM 3 MAR 20.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 20.pdf21 Jun 2025
Form 1File: FORM 1 MAR 21.pdf21 Jun 2025
Form 2File: FORM 2 MAR 21.pdf21 Jun 2025
Form 3File: FORM 3 MAR 21.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 21.pdf21 Jun 2025
Form 1File: FORM 1 MAR 22.pdf21 Jun 2025
Form 2File: FORM 2 MAR 22.pdf21 Jun 2025
Form 3File: FORM 3 MAR 22.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 22.pdf21 Jun 2025
Form 1File: FORM 1 MAR 23.pdf21 Jun 2025
Form 2File: FORM 2 MAR 23.pdf21 Jun 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MANOHAR SHREEJI NIRVANANEAR KATRAP SCHOOL KATRAP BADLAPUR EAST 4215031CompletedApr 2017Mar 2017
VIKAS GALAXYS NO 90 KULGOAN BADLAPUR ROAD KULGOAN BADLAPUR 4215031CompletedDec 2014Nov 2014

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAP LAKE7,600+ in Thane

2 kmMANOHAR VIKAS SHREEJI PACompleted 195Lapsed / revoked 77Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 392 registered projects within 2 km.

Builder: DEEPLAXMI DEVELOPERS

DEEPLAXMI DEVELOPERS has 5 registrations on MahaRERA, including MANOHAR VIKAS SHREEJI PARAISO PHASE 1 and MANOHAR SHREEJI NIRVANA PHASE 4. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 is delayed beyond 30 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANOHAR VIKAS SHREEJI PARAISO PHASE - 2?

The registered promoter entity is DEEPLAXMI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANOHAR VIKAS SHREEJI PARAISO PHASE - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANOHAR VIKAS SHREEJI PARAISO PHASE - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANOHAR VIKAS SHREEJI PARAISO PHASE - 2?

The professionals named in the filing: Architect: URBAN VASTU DESIGNER; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: L K DEDHIA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANOHAR VIKAS SHREEJI PARAISO PHASE - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANOHAR VIKAS SHREEJI PARAISO PHASE - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.