Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samraat Symphony Project 02 is a Residential / Group Housing project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600002742 on 4 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameSamraat Symphony Project 02
- TypeResidential / Group Housing
- Location
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600002742
- ReraGenie IDRG-MH-01253
Builder
- NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
- Entity typeCompany
- CINU55100MH2005PTC155493
- GSTIN27AAJCS4306F1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorSujoy Jayant Gupta
- DirectorSUDHIR CHANDRAKANT METKAR
- Other registrations14 more →
- Completed8 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion31 Dec 2019
- Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 - Wing D | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Building 1 - Wing D: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Soyuz Talib |
| Architect | Ar Tapasya H Bendale |
| Engineer | STRUDCOM |
| Chartered Accountant | BCS AND ASSOCIATES |
| Chartered Accountant | KALE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSamraat Symphony Project 02 Construction of Building is complete. Water connection is received. Electric power connection received. Applied for occupancy certificate to Nashik Municipal corporation vide receipt no 0686699 . Occupancy certificate is awaited.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Sep 2019
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate.pdf | 23 May 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of AFS SYMPHONY.pdf | 23 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sym 2.pdf | 22 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Form 1 _Symphony 02.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018 19 SYM.pdf | 19 May 2023 |
| Certificates of CA (Form 5)File: Symphony P-II.pdf | 30 Sep 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion Symphony Project 02 110319.pdf | 27 Sep 2019 |
| Certificates of CA (Form 3)File: FORM 3 SAMRAAT SYMPHONY PROJECT 2.pdf | 17 Jul 2019 |
| Certificates of Architect (Form 4)File: Full Completion Symphony Project 02 110319.pdf | 13 Jun 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Symphony Deed Of Declaration_Part1.pdf | 13 Jun 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Symphony Deed Of Declaration_Part2.pdf | 13 Jun 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Symphony Deed Of Declaration_Part3.pdf | 13 Jun 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Symphony Deed Of Declaration_Part4.pdf | 13 Jun 2019 |
| Status of ConveyanceFile: Symphony Deed Of Declaration_Part1.pdf | 20 May 2019 |
| Status of ConveyanceFile: Symphony Deed Of Declaration_Part2.pdf | 20 May 2019 |
| Status of ConveyanceFile: Symphony Deed Of Declaration_Part3.pdf | 20 May 2019 |
| Status of ConveyanceFile: Symphony Deed Of Declaration_Part4.pdf | 20 May 2019 |
| OtherFile: SYMPHONY FINAL FIRE NOC WING D 02-01-2019.pdf | 15 Mar 2019 |
| Building plan approvalFile: Full Completion Symphony Project 02 110319.pdf | 14 Mar 2019 |
| Building plan approvalFile: Sheet 01 Symphony.pdf | 14 Mar 2019 |
| Building plan approvalFile: Sheet 02 Symphony.pdf | 14 Mar 2019 |
| Building Plan Approval (IOD)File: Full Completion Symphony Project 02 110319.pdf | 14 Mar 2019 |
| Building Plan Approval (IOD)File: Sheet 01 Symphony.pdf | 14 Mar 2019 |
| Building Plan Approval (IOD)File: Sheet 02 Symphony.pdf | 14 Mar 2019 |
| Certificates of Architect (Form 4)File: Form 4 Arch certificate for completion Symphony Project 02.pdf | 14 Mar 2019 |
| Certificates of CA (Form 3)File: Form 3 - Samraat Symphony 092018.pdf | 2 Jan 2019 |
| Certificates of CA (Form 5)File: Symphony_RERA FORM V.pdf | 30 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Symphony 280918.pdf | 28 Sep 2018 |
| Details of encumbrancesFile: SYMPHONY MORTGAGE DEED.pdf | 26 Sep 2018 |
| Certificates of CA (Form 3)File: SYMPHONY PROJECT 2.pdf | 16 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Symphony architects Ceritificate 50718compressed.pdf | 5 Jul 2018 |
| Certificates of CA (Form 3)File: CA Certficate Symphony.pdf | 20 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Symphony May2018.pdf | 14 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Symphony architect certificate 16042018.pdf | 25 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Symphony_Jan18.pdf | 24 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate__ Symphony 02 200118.pdf | 22 Jan 2018 |
| Building plan approvalFile: Symphony Wing D 4-12-17 01.pdf | 9 Dec 2017 |
| Building plan approvalFile: Symphony Wing D 4-12-17 02.pdf | 9 Dec 2017 |
| Building Plan Approval (IOD)File: Symphony Wing D 4-12-17 01.pdf | 9 Dec 2017 |
| Building Plan Approval (IOD)File: Symphony Wing D 4-12-17 02.pdf | 9 Dec 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE--FOR -D-WING-DATED--4-12-2017.pdf | 9 Dec 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Attach_3_Engineer Certificate_symphony181017.pdf | 18 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Symphony_Project 0211102017.pdf | 16 Oct 2017 |
| Proforma of Allotment letterFile: Agreement of Sale -Symphony 11102017.pdf | 16 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi certificate.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Symphony Project 2.pdf | 26 Jul 2017 |
| Declaration in FORM BFile: B Form Symphony Project II.pdf | 25 Jul 2017 |
| Layout approvalFile: FINAL LAYOUT LETTER.pdf | 24 Jul 2017 |
| Layout approvalFile: Layout_899.pdf | 24 Jul 2017 |
| Building plan approvalFile: IOD APPLICATION.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 1 Of 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 2 Of 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 3 Of 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 4 Of 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 5 Of 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: Symphony Sheet 6 Of 6.pdf | 24 Jul 2017 |
| PAN CardFile: Entity PAN.pdf | 24 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 24 Jul 2017 |
| Details of encumbrancesFile: Symphony Index II.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: FINAL LAYOUT LETTER.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout_899.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: IOD APPLICATION.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 1 Of 6.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 2 Of 6.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 3 Of 6.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 4 Of 6.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 5 Of 6.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Symphony Sheet 6 Of 6.pdf | 24 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Symphony Project 02.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: Agreement of Sale - Symphony - Residential.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER -Symphony Residential.pdf | 24 Jul 2017 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Samraat Apna Ghar Phase-IIP51600020657 | Someshwar Satpur Link Road Near DJ Reva Meadows, Nashik | - | Apr 2019 | Completed | Dec 2023 | Late, Jan 2025 |
| Samraat Apna Ghar Phase-IP51600020299 | Someshwar -Satpur link Road near DJ Reva Meadows, Nashik | - | Apr 2019 | Completed | Jun 2023 | Nov 2022 |
| Samraat Symphony Project 02 | IndiraNagar Nashik Maharashtra | 28 | - | Completed | Dec 2019 | Mar 2019 |
| Samraat Gokuldham Project 01 | Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra | 241 | - | Completed | Dec 2019 | Oct 2018 |
| Samraat Vrindavan | Om Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003 | 240 | - | Completed | Mar 2017 | Late, Jun 2017 |
| Signature | Serene Meadows Gangapur Road Anandwali Nashik 422013 | 60 | - | Completed | Dec 2016 | Late, Jun 2017 |
| Samraat Symphony Project 03 | NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009 | 112 | - | Completed | Dec 2016 | Late, Jul 2017 |
| Samraat Symphony Project 01 | Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 422009 | 84 | - | Completed | Dec 2016 | Late, Jul 2017 |
| Samraat Tropicano 01 | Serene Meadows Gangapur Road Anandwali Nashik 422013 | 460 | - | Completed | Oct 2016 | Late, Jul 2017 |
| Dream Grandeur | Matoshri Nagar Tidke Colony Nashik 422002 | 16 | - | Completed | Jun 2012 | Late, Nov 2012 |
| Dream Nest | Near Ryan International School Old Wadala Road Nashik 422006 | 104 | - | Completed | Mar 2012 | Late, May 2012 |
| Dream Villaas | Ganesh baba Nagar Nashik-Pune Highway Nashik 422011 | 56 | - | Completed | Dec 2011 | Late, Mar 2012 |
| Dream Castle | Madhuban Colony Makhamalabad Road Panchavati Nashik 422003 | 106 | - | Completed | Dec 2010 | Late, Apr 2011 |
| Dream Flower | Nashik-Pune Highway Opposite Inox MultiPlex Nashik 422006 | 94 | - | Completed | Nov 2010 | Late, Mar 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep Samraat Symphony Project 02 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Samraat Symphony Project 02 is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samraat Symphony Project 02?
The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samraat Symphony Project 02?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samraat Symphony Project 02?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samraat Symphony Project 02?
The professionals named in the filing: Architect: Ar Soyuz Talib; Architect: Ar Tapasya H Bendale; Engineer: STRUDCOM; Chartered Accountant: BCS AND ASSOCIATES; Chartered Accountant: KALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samraat Symphony Project 02?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback