Registered No litigation declared Residential / Group Housing project

RutuGandh Mahabaleshwar-3

By Hi-Tek Vyas Developers LLP

RG-MH-14688 · RERA P52700023251 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 66 months from the original
6 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 50%
3 of 3Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

RutuGandh Mahabaleshwar-3 is a Residential / Group Housing project by Hi-Tek Vyas Developers LLP in Satara, Maharashtra, registered with MahaRERA as P52700023251 on 9 Dec 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 66 months from the original filing. 0 of the 3 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.

At a glance

Project

  • NameRutuGandh Mahabaleshwar-3
  • TypeResidential / Group Housing
  • Location
    • MDR-26
    • Pawar vasti
    • Khambil chorge
    • Mahabaleshwar
    • Satara
    • 412806
  • Pincode412806
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700023251
  • ReraGenie IDRG-MH-14688

Builder

  • NameHi-Tek Vyas Developers LLP
  • Entity typePartnership
  • Authorized SignatoryShripad Murlidhar Vyas
  • PartnerMahesh Pundalik Nevarekar
  • Other registrations2 more →

Key dates

this monthRegisteredDec 2019First promiseDec 2022Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Dec 2019
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed80 files

Current status

0%0 of 3 units booked
20.6%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
11NA21101
12NA21101
13NA21101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 50%.

1123%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
1223%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
1323%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes20%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Open Space3
BuildingOpen SpaceTotal
1111
1211
1311

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,487 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
Hi-Tek Vyas Developers LLPPethPune

Approvals and building plan

Sanctioning authorityDistirct Collector
Permissible FSI298.86
Proposed, not sanctioned299 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch893 6 Lohia Jain house Bhandarkar road Pune
Estimated costRs 1.74 cr
Cost incurredRs 35.87 lakh
Work done20.62%
BuildingWingEstimatedIncurred
-NARs 63.99 lakhRs 17.79 lakh
11NARs 36.67 lakhRs 6.02 lakh
12NARs 36.67 lakhRs 6.02 lakh
13NARs 36.67 lakhRs 6.02 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr D S Joglekar
ArchitectOHINTAMANI INNOVATIVE DESIGNS
EngineerEr Rakesh Jain
EngineerDEVASHIKAR B PATIL
Chartered AccountantAbhijit Kolapkar
Chartered AccountantJayant Kolapkar
PartnerRole in project
Hi-Tek Vyas Developers LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700013382Dec 2022 → May 2025

Reason as filed by the promoterNon Availability of Raw material and Labour Due to Covid 19 Pandemic

EA18072502107Dec 2022 → Jun 2028

Reason as filed by the promoterDue to insufficiency and constrains of funds, we need extended time for completion of project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf12 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf12 Aug 2026
Withdrawal Update Form 3File: FORM 3.pdf12 Aug 2026
Withdrawal Update Form 1File: FORM 1 FINAL.pdf16 May 2026
Withdrawal Update Form 2File: FORM 2 FINAL.pdf16 May 2026
Withdrawal Update Form 3File: FORM 3.pdf16 May 2026
Withdrawal Update Form 1File: Form-1 Rutu 3 31-12-2025.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM-2 31-12-2025.pdf27 Jan 2026
Withdrawal Update Form 3File: FORM-3 CA form 3 Rutu-3.pdf27 Jan 2026
Withdrawal Update Form 1File: Archi certificate Rutu 3.pdf6 Dec 2025
Withdrawal Update Form 2File: Engineer certificate rutu 3.pdf6 Dec 2025
Withdrawal Update Form 3File: form-3 rutuganda-3.pdf6 Dec 2025
Withdrawal Update Form 1File: phase3 arch certificate.pdf18 Oct 2025
Withdrawal Update Form 1File: Architects certificate Rutu Maha 3.pdf18 Oct 2025
Withdrawal Update Form 2File: Er_Rutu_3.pdf18 Oct 2025
Withdrawal Update Form 2File: Er_Rutu_3.pdf18 Oct 2025
Withdrawal Update Form 3File: CA Certificate 3.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Rutu 03.pdf18 Oct 2025
Form 1File: Form 1 Rutu 3.pdf23 Jul 2025
Form 2File: Form 2 Rutu 3.pdf23 Jul 2025
Form 3File: Form 3 Rutu 3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Rutu 3.pdf23 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Rutu 3.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate Rutu Maha 3.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Inventory Rutu Maha 3.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rutugandh 03.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Cert-Rutu Mah-3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert-Rutu Mah-3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory- Rutu Mah-3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RUTUGANDH MAHABALESHWAR - 3 (3).pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: RUTUGANDH MAHABALESHWAR - 3 (4).pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RUTUGANDH MAHABALESHWAR - 3.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold phase 3.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 3.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: eng cert phase 3.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase3 arch certificate.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer cert form 2 (3).pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC008.PDF29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert rutu maha -3.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engr cert rutu maha-3.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: sold inventory rutu maha -3.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rutugandh 3 20240121031614.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 3sep.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 3sep.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: sold 3sep.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: sold inventory (2).pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2023 Project 3.pdf12 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023 Project 3_compressed.pdf12 Sep 2023
Disclosure of sold/ booked inventoryFile: Rutugandh Mahabaleshwar - 3_removed.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2023 Project 3_compressed.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2023 Project 3_compressed.pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23 Project 3.pdf12 Sep 2023
Declaration about Commencement CertificateFile: Commencement Declaration FORM-D.pdf29 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_compressed.pdf29 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate_compressed.pdf29 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality assurance 2019-2020_compressed.pdf29 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality assurance 2020-2021_compressed.pdf29 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality assurance 2021-2022_compressed.pdf29 Dec 2022
Disclosure of sold/ booked inventoryFile: Discolsure Of Inventory-RM 3.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021_compressed.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-2022_compressed.pdf29 Dec 2022
Layout approvalFile: 4a (24-6) Approved Layout NA.PDF9 Nov 2019
Layout approvalFile: 4b (24-6) Approved Dwg with stamp.pdf9 Nov 2019
Details of encumbrancesFile: 3 Encumbrances NA (24-6-3).pdf9 Nov 2019
Copy of Layout Approval (in case of layout)File: 4a (24-6) Approved Layout NA.PDF9 Nov 2019
Copy of Layout Approval (in case of layout)File: 4b (24-6) Approved Dwg with stamp.pdf9 Nov 2019
Declaration in FORM BFile: 7 (24-6) Form B Signed Diclaration.pdf9 Nov 2019
Building plan approvalFile: 5 (24-6) Approved Dwg with stamp.pdf31 Oct 2019
PAN CardFile: 1 Hi-Tek Vyas Dev LLP PanCard.pdf31 Oct 2019
Copy of the legal title reportFile: 2a (24-6) Title Report.pdf31 Oct 2019
Copy of the legal title reportFile: 2b (24-6) Title Certificate.pdf31 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 (24-6) Approved Dwg with stamp.pdf31 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 24-6 NA-012.pdf31 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 24-6 NA-034.pdf31 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 24-6 NA-056 Dwg.pdf31 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 RERA Form-1 Architect Certificate 24-6-3.pdf31 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 RERA Form-2 Engineer Certificate 24-6-3.pdf31 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 RERA Form-3 CA Certificate 24-6-3.pdf31 Oct 2019
Proforma of Allotment letterFile: 15b (24-6-3) ALLOTTMENT LETTER.pdf31 Oct 2019
Proforma of Allotment letterFile: 15a (24-6-3) Agreement for Sale (RERA).pdf31 Oct 2019

How this compares with Satara

0%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 66 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep RutuGandh Mahabaleshwar-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pawar vasti1,100+ in Satara

2 kmRutuGandh Mahabaleshwar-Completed 15Lapsed / revoked 22Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Hi-Tek Vyas Developers LLP

Hi-Tek Vyas Developers LLP has 3 registrations on MahaRERA, including RutuGandh Mahabaleshwar-1 and RutuGandh Mahabaleshwar-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if RutuGandh Mahabaleshwar-3 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RutuGandh Mahabaleshwar-3?

The registered promoter entity is Hi-Tek Vyas Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RutuGandh Mahabaleshwar-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RutuGandh Mahabaleshwar-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RutuGandh Mahabaleshwar-3?

The professionals named in the filing: Architect: Ar D S Joglekar; Architect: OHINTAMANI INNOVATIVE DESIGNS; Engineer: Er Rakesh Jain; Engineer: DEVASHIKAR B PATIL; Chartered Accountant: Abhijit Kolapkar; Chartered Accountant: Jayant Kolapkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RutuGandh Mahabaleshwar-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RutuGandh Mahabaleshwar-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RutuGandh Mahabaleshwar-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.