Home / Browse projects / Thane, Maharashtra / Rumah Bali Phase 4

Registered Litigation declared Residential / Group Housing project

Rumah Bali Phase 4

By Puranik Builders Limited

RG-MH-64601 · RERA P51700046777 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 73%
57 of 240Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Rumah Bali Phase 4 is a Residential / Group Housing project by Puranik Builders Limited in Thane, Maharashtra, registered with MahaRERA as P51700046777 on 5 Sep 2022. Possession is promised by 31 Dec 2028. 183 of the 240 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRumah Bali Phase 4
  • TypeResidential / Group Housing
  • Location
    • Ghodbunder Road
    • Bhainderpada
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046777
  • ReraGenie IDRG-MH-64601

Builder

  • NamePuranik Builders Limited
  • Entity typeCompany
  • CINU99999MH1990PLC056451
  • GSTIN27AABCP0109R1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorShailesh Gopal Puranik
  • DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
  • Other registrations19 more →
  • Completed5 of 20
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredSep 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Sep 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Current status

76%183 of 240 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3 - MegahNA383626026
A4 -SantaiNA38362140214

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 73%.

A3 - Megah36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor73%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.7%
A4 -Santai35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor67%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.7%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes30%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes45%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes45%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48
BuildingClosed/CoveredTotal
A3 - Megah2424
A4 -Santai2424

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,159 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Chandrabhaga Pandurang Patil and othersThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI22467.59
Proposed, not sanctioned13,246 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHighstreet Mall, Kapurbawadi Junction, Ghodbunder Road Thane

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashi Deshmukh and Associates
ArchitectVastushilp Associates
EngineerKelkar Designs Private Limited
EngineerSagar Abnave
EngineerKedar Yernalkar
Chartered AccountantH D O Associates
Chartered AccountantVMD and Company
Chartered AccountantVMD & Co
PartnerRole in project
Puranik Builders Limited-

Litigation declared7

CaseCourtStatus
SCS 227/2011Civil Judge Senior Division ThaneFor Issues
12341/2015Bombay High Courtfor Admission
RCS 146/2011Civil Judge Senior Division ThaneFor Argument
SCS 466/2016Civil Judge Senior Division ThaneFor Hearing
WP 312/2019Bombay High CourtFor Hearing
WP 6411/2019Bombay High Courtfor Admission
SCS 227/2011Civil Judge Senior Division, ThaneOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400353Avdheshkumar Vansraj YadavAvdheshkumar Yadav06/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 RB 4.pdf20 Apr 2026
Form 2File: Form 2.pdf20 Apr 2026
Form 3File: Form 3 Final.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sales Data.pdf20 Apr 2026
Form 1File: 02-RB- architect Certificate for 01st OCT 25 to 31st DEC 25.pdf21 Jan 2026
Form 2File: Form 2 Engineers Certificate RB 4.pdf21 Jan 2026
Form 3File: CA Certificates - RB Ph-IV A3 A4 Final.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory.pdf21 Jan 2026
Form 1File: 23- architect Certificate for 01st APRIL 25 to 30 th JUNE 25.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate RB 4-A3 A4.pdf16 Nov 2025
Form 3File: CA Certificates - RB Ph-IV A3 & A4 30062025.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory-Rumah Bali Phase 4 A3 & A4.pdf16 Nov 2025
Form 1File: 24- architect Certificate for 01st JULY 25 to 30 th SEPT 25.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate RB 4-A3 A4 30092025.pdf16 Nov 2025
Form 3File: CA Certificates - RB Ph-IV A3 & A4 30092025 F.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: RB IV A3 & A4_0001.pdf16 Nov 2025
Form 5 (FY 2024-2025)File: Rera Form 5 - Rumah Bali Phase 4 - sign.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T6B.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificates - RB Ph-IV A3 A4 31122024_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 - 30092024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 -31122024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for 01st OCT 24 to 31st DEC 24(RB).pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB 4.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificates - RB Ph-IV A3 - A4 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rumahbali Phase 4_singed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 - 30062024.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- RB4 Year 23-24.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: RB-4-A3_page-0001.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Puraniks Runah Bali 4.PDF24 Jul 2024
Disclosure of sold/ booked inventoryFile: Rumah Bali Phase 4-A3,A4.PDF24 Jul 2024
Disclosure of sold/ booked inventoryFile: Rumahbali Phase 3 A3-A4_page-0001.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Rumah Bali Phase 4-A3,A4.PDF24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024 Architects Certificate FORM-1 RB 4.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rumah Bali Phase 4_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB_A3 A4.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ruma Bali 4.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ruma Bali 4_compressed.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17-RB PH04 - Oct23 to Dec23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB 4- Architect Certificate 30-09-2023.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 _30092023.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RB 4.pdf16 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - 12102023.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Rumah Bali Phase 4 - signed final.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Rumah Bali A3-A4.PDF14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15- RB 4 Architect Certificate 30062023.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: RB-3-A3.PDF10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- RB4.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 31032023.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4 30062023.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HDO - RB IV - 032.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15- Architect Certificate 31032023.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Project rumah bali-lV_compressed.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13-RB Phase IV 31122022.pdf25 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rumah Bali IV Dec 2022.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4-A3 A4.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rumah Bali IV Dec 2022.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB 4 Architect Certificate 30092022.pdf21 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 4 30092022.pdf21 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RB 4.pdf21 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account declaration 26082022.pdf26 Aug 2022
Details of encumbrances concerned to FinanceFile: RB Declaration 22082022.pdf23 Aug 2022
Proforma of Allotment letterFile: RB - RERA Allotment Letter 22082022.pdf23 Aug 2022
Proforma of Allotment letterFile: AGREEMENT_FOR_SALE Final 23082022 FINAL12.pdf23 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Devitation report.pdf23 Aug 2022
Other - LegalFile: RB Declaration 4.pdf23 Aug 2022
CERSAI detailsFile: S No 100 CERSAI Asset based Search Report.pdf22 Aug 2022
CERSAI detailsFile: S No 98 CERSAI Asset based Search Report.pdf22 Aug 2022
CERSAI detailsFile: S No 101 109 CERSAI Asset based Search Report.pdf22 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA Certificates - RB PH 4.pdf22 Aug 2022
PAN CardFile: PBL PAN CARD.pdf31 Jul 2022
Other - LegalFile: Master Layout.pdf27 Jul 2022
Other - TechnicalFile: Technical - declaration.pdf27 Jul 2022
Details of encumbrances concerned to LegalFile: RB Phase 4 Encumrances Certificate LEGAL.pdf26 Jul 2022
Declaration about Commencement CertificateFile: CC declaration.pdf26 Jul 2022
Declaration in FORM BFile: Declaration-compressed.pdf26 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation - Allotment Letter.pdf26 Jul 2022
Layout approvalFile: 01_compressed-LR.pdf25 Jul 2022
Building plan approvalFile: 9 floor plan.pdf25 Jul 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hometown Part CKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2016Late, Apr 2017
Aldea AnnexoAldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045129CompletedDec 2016Late, Apr 2017
Hometown Part BKasarvadavali Ghodbunder Road Thane west 400615159CompletedAug 2014Late, Jan 2015
Hometown Part AKasarvadavali Ghodbunder Road Thane west 400615176CompletedJun 2013Late, Nov 2013
Puranik City Part AKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2012Late, Feb 2013
Puranik City Part BKasarvadavali Ghodbunder Road Thane west 40061580CompletedDec 2011Late, Apr 2012

How this compares with Thane

76%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rumah Bali Phase 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhainderpada7,600+ in Thane

2 kmRumah Bali Phase 4Completed 61Lapsed / revoked 19Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: Puranik Builders Limited

Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Rumah Bali Phase 4 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rumah Bali Phase 4?

The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rumah Bali Phase 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rumah Bali Phase 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rumah Bali Phase 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rumah Bali Phase 4?

The professionals named in the filing: Architect: Shashi Deshmukh and Associates; Architect: Vastushilp Associates; Engineer: Kelkar Designs Private Limited; Engineer: Sagar Abnave; Engineer: Kedar Yernalkar; Chartered Accountant: H D O Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rumah Bali Phase 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rumah Bali Phase 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rumah Bali Phase 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.