Home / Browse projects / Thane, Maharashtra / Rumah Bali Phase 3
Rumah Bali Phase 3
RG-MH-55538 · RERA P51700015955 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 17 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rumah Bali Phase 3 is a Others project by Puranik Builders Limited in Thane, Maharashtra, registered with MahaRERA as P51700015955 on 10 Apr 2018. Possession is promised by 30 Dec 2031. 457 of the 615 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 17 complaints are on record with the regulator.
At a glance
Project
- NameRumah Bali Phase 3
- TypeOthers
- Location
- Ghodbunder Road
- Bhainderpada
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700015955
- ReraGenie IDRG-MH-55538
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Apr 2018
- Promised completion30 Dec 2031
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building Type C | NA | 44 | 36 | 568 | 47 | 615 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.
Building Type C: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 92% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 28% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 51% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 7% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed240
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Chandrabhaga Pandurang Patil and others | Thane (M Corp.) | Thane |
| Kanta Anant Patil | Thane (M Corp.) | Thane |
| Kanchan Vishwanath Thakur | Thane (M Corp.) | Thane |
| Suryakant Sitaram Thakur | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shashi Deshmukh and Associates |
| Architect | Vastushilp Associates |
| Engineer | Thorton and Tomsetti |
| Engineer | Sagar Abnave |
| Engineer | Kedar Yernalkar |
| Chartered Accountant | HDO & Associates |
| Chartered Accountant | VMD and Company |
| Chartered Accountant | VMD & Co |
| Partner | Role in project |
|---|---|
| Puranik Builders Limited | - |
Litigation declared8
| Case | Court | Status |
|---|---|---|
| SCS 227/2011 | Civil Judge Senior Division Thane | For Evidence |
| 12341/2015 | Bombay High Court | For Admission |
| RCS 146/2011 | Civil Judge Senior Division Thane | For Evidence |
| SCS 466/2016 | Civil Judge Senior Division Thane | Dispose off |
| WP 312/2019 | Bombay High Court | for Hearing |
| 6095/2021 | Bombay High Court | For admission |
| RCS 365/2020 | Civil Judge Senior Division Thane | For Amendment |
| 306/2020 | District Consumer Dispute Redressal Forum | For filing Evidence Affidavit |
Complaints filed with MahaRERA17
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000375072 | Vikas Liladhar Patil | Puranik Builders Limited | 04/04/2023 |
| CC006000000429404 | Rupesh Chintaman Ambavane | PURANIK BUILDERS LIMITED | 24/02/2024 |
| CC12500854 | arwaz Alam | Puranik Builders Limited | 12/03/2025 |
| CC12501155 | Saikiran Ravikishore Gorge | Puranik Builders Limited | 07/04/2025 |
| CC12502733 | Manohar Kistaswami Addagatla | Puranik Builders Limited | 04/08/2025 |
| CC12600693 | ARUN UDAY PADHI | Puranik Builders Limited | 06/02/2026 |
| CC12600933 | Pramod Sahadev Bhole | Puranik Builders Limited | 20/02/2026 |
| CC12601267 | Vinod Rajeshwar Charpilwar | Puranik Builders Limited | 09/03/2026 |
| CC12601962 | Puranik Builders Limited | MOHAMMAD AMJAD SHAIKH | 03/04/2026 |
| CC12602562 | Ruturaj Mulik | Puranik Builders Limited | 02/05/2026 |
| CC12603162 | Rose Ukkan | Puranik Builders Limited | 27/05/2026 |
| CC12602689 | MANISHA KUMAR VAIBHAV JAISWAR | Puranik Builders Limited | 09/05/2026 |
| CC12603111 | Sanjay Kumar | Puranik Builders Limited | 25/05/2026 |
| CC12603405 | Vaishnavi Sanjay Tekade | Puranik Builders Limited | 03/06/2026 |
| CC12603988 | pankaj vishwas patil | Puranik Builders Limited | 27/06/2026 |
| CC12604168 | Chetan Anil Chavan | Puranik Builders Limited | 03/07/2026 |
| CC12604233 | Jayant Ravindra Kharat | Puranik Builders Limited | 06/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2031
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - RB 3.pdf | 20 Apr 2026 |
| Form 2File: Form 2.pdf | 20 Apr 2026 |
| Form 3File: CA Certificates - RB III 31-03-2026 Final.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sales Data_compressed.pdf | 20 Apr 2026 |
| Form 1File: 01-GB-24- architect Certificate for 01st OCT 25 to 31ST DEC 25.pdf | 21 Jan 2026 |
| Form 2File: Form 2 Engineers Certificate RB 3-GB1.pdf | 21 Jan 2026 |
| Form 3File: CA Certificates - RB III Final_compressed.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory.pdf | 21 Jan 2026 |
| Form 1File: 23- architect Certificate for 01st APR 25 to 30 th JUNE 25.pdf | 16 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate RB 3-GB1.pdf | 16 Nov 2025 |
| Form 3File: CA Certificates - RB III 30062025.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory -Puraniks Rumah Bali 3.pdf | 16 Nov 2025 |
| Form 1File: 23- architect Certificate for 01st JULY 25 to 30 th SEPT 25.pdf | 16 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate RB 3-GB1 30092025.pdf | 16 Nov 2025 |
| Form 3File: CA Certificates - RB III 30-09-2025 Final_.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: RB Phase 3.pdf | 16 Nov 2025 |
| Form 5 (FY 2024-2025)File: Rera Form 5 - Rumah Bali Phase 3 - sign.pdf | 29 Sep 2025 |
| Certificates of CA (Form 3)File: CA Certificates - RB III 31122024_compressed.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-GB1 - 30092024.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-GB1 -31122024.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for 01st oct 24 to 31st dec 24(GB).pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB3.pdf | 20 Oct 2024 |
| Certificates of CA (Form 3)File: Rumah Bali Phase 3_compressed.pdf | 20 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certificates - RB III 30092024.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rumahbali Phase 3_Singed.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-GB1 - 30062024.pdf | 24 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- RB3 Year 23-24.pdf | 24 Jul 2024 |
| Certificates of CA (Form 3)File: Rumah Bali Phase 3_compressed.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB1WIN G A B.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024 Architects Certificate FORM-1 RB 3.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Rumah Bali Phase 3_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-GB1.pdf | 26 Apr 2024 |
| Certificates of CA (Form 3)File: Ruma Bali 3.pdf | 26 Apr 2024 |
| Certificates of CA (Form 3)File: Ruma Bali 3_compressed.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17-RB PH03 - oct 23 to Dec23.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-Gb1.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB 3 RB PHASE-III WING A B RERA CERTIIFICATE 30-9-23.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-Gb1 _30092023.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: HDO - RB III - 30062023.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: RB 3.pdf | 16 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - 12102023.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Rumah Bali Phase 3 - signed final.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- RB3.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15-RB 3 30062023.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-Gb1 31032023.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-Gb1 30062023.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14-RB PHASE -III WING A B 310323.pdf | 2 May 2023 |
| Certificates of CA (Form 3)File: Project rumah bali-lll_compressed (2).pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13-RB PHASE III 31122022.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3 31122022.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: Rumah Bali III Dec 2022.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30062019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30092019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 31122019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: RUMA BALI PHASE 3.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30062020.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30092020.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: RB III.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 310321.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30062021.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 30092021.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates RB III 31122021.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: 6 CA Certificates RB III 31032022.pdf | 11 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB III.pdf | 21 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB III RERA CERTIFICATE 06072022_compressed.pdf | 21 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB III RERA CERTIFICATE30092022.pdf | 21 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3 30092022.pdf | 21 Dec 2022 |
| Certificates of CA (Form 3)File: RUMAH BALI III PBPL_compressed.pdf | 21 Dec 2022 |
| Certificates of CA (Form 3)File: RB-III.pdf | 21 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ruma Bali Ph-3.pdf | 1 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 27 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RB 3 RERA certificate.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3.pdf | 27 Jul 2022 |
| Details of encumbrancesFile: RB 3 Encumbrance certificate.pdf | 26 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate RB 3-Gb1.pdf | 7 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC GB One 17112021 1.pdf | 28 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rumabhali Phase 3.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Form no 5 RB Phase 3.pdf | 5 Aug 2021 |
| Details of Restarting of Construction work post lockdownFile: RB 3 - REPORT.pdf | 14 Jul 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RUMAH BALI PHASE 3.pdf | 27 Jan 2020 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hometown Part C | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2016 | Late, Apr 2017 |
| Aldea Annexo | Aldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045 | 129 | Completed | Dec 2016 | Late, Apr 2017 |
| Hometown Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 159 | Completed | Aug 2014 | Late, Jan 2015 |
| Hometown Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 176 | Completed | Jun 2013 | Late, Nov 2013 |
| Puranik City Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2012 | Late, Feb 2013 |
| Puranik City Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 80 | Completed | Dec 2011 | Late, Apr 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rumah Bali Phase 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhainderpada7,600+ in Thane
Filed coordinates, straight-line distance. 80 registered projects within 2 km.
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: Puranik Builders Limited
Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Rumah Bali Phase 3 is delayed beyond 30 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rumah Bali Phase 3?
The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rumah Bali Phase 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Rumah Bali Phase 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Rumah Bali Phase 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rumah Bali Phase 3?
The professionals named in the filing: Architect: Shashi Deshmukh and Associates; Architect: Vastushilp Associates; Engineer: Thorton and Tomsetti; Engineer: Sagar Abnave; Engineer: Kedar Yernalkar; Chartered Accountant: HDO & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rumah Bali Phase 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback