RIVERDALE AVENUE

By DUVILLE ESTATES PRIVATE LIMITED

RG-MH-70643 · RERA P52100034874 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • Completion date moved by 1 months
  • 1 extension taken
  • Rs 185.00 crore secured on the land, in favour of HDFC BANK LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Oct 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
7 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

RIVERDALE AVENUE is a Commercial project by DUVILLE ESTATES PRIVATE LIMITED in NEW KHARADI BEHIND ZENSER IT PARK, 411014, registered with MahaRERA as P52100034874 on 28 Apr 2022. The registration is recorded completed; possession was promised by 15 Oct 2025. The completion date has moved by 1 months from the original filing. 34 of the 41 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameRIVERDALE AVENUE
  • TypeCommercial
  • Location
    • SHIVANE RIVERSIDE ROAD
    • NEW KHARADI BEHIND ZENSER IT PARK
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034874
  • ReraGenie IDRG-MH-70643

Builder

  • NameDUVILLE ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorTushad Behram Dubash
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2022First promiseSep 2025Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion15 Oct 2025
  • Revised completionRevised to 15 Oct 2025 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed146 files

Current status

83%34 of 41 units booked
53.1%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Riverdale AvenueNA6404141

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Riverdale Avenue: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,262 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofHDFC BANK LIMITED
Secured amountRs 185.00 crore
CERSAI search filedYes
Declared on21 Aug 2025
LandownerVillageDistrict
Tushad Behram Dubash Trust & Ria Behram Dubash TruMumbai CityMumbai City
Ramesh AdhavPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Authority
Permissible FSI5378.43
Proposed, not sanctioned5,378 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR JEHANGIR BUILDING M G ROAD FORT MUMBAI 400001
Estimated costRs 86.19 cr
Cost incurredRs 45.81 cr
Work done53.15%
BuildingWingEstimatedIncurred
Riverdale AvenueNARs 69.32 crRs 38.94 cr
-NARs 16.87 crRs 6.87 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac AECL Consultancy Pvt Ltd
EngineerJones Lang LaSalle
Chartered AccountantDhirubhai Shah & Co LLP
Chartered AccountantKalyaniwalla & Mistry LLP
PartnerRole in project
DUVILLE ESTATES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13112518319Sep 2025 → Oct 2025

Reason as filed by the promoterThe Promoter has completed construction of the project and applied with Pune Municipal Corporation (PMC) for occupancy certificate of units and parking spaces of the Project well with the validity period of the project. However, the Occupancy Certificate of the Project has been received on 15th October, 2025, i.e., 15 days after expiry of the said validity of the said Project on 30th September, 2025. A copy of occupancy certificate dated 15th October issued by PMC us enclosed herewith. Considering the fact that, the Project is completed in all respect, OC has already been issued by PMC and we

Litigation declared5

CaseCourtStatus
1774/2015The Court of Civil Judge Senior Division PuneClosed
226/2015The Court of Civil Judge Senior Division PuneOngoing
597/2015The Court of Civil Judge Senior Division PuneOngoing
142/2017The Court of Civil Judge Senior Division PuneOngoing
6027/2012The Court of Civil Judge Senior Division PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1 - Riverdale Avenue - Oct 2025.pdf22 May 2026
Withdrawal Update Form 2File: Avenue Form 2.pdf22 May 2026
Withdrawal Update Form 3File: Avenue Form 3 15 October 2025.pdf22 May 2026
Occupational CertificateFile: Occupancy Certificate -Avenue - 41 Shops.pdf22 May 2026
Withdrawal Update Form 1File: RERA Form 1 - Riverdale Avenue - Oct 2025.pdf20 May 2026
Withdrawal Update Form 2File: 13 Form 2 - Riverdale Avenue - Sep 2025.pdf20 May 2026
Withdrawal Update Form 3File: Avenue Form 3 15 October 2025.pdf20 May 2026
Form 5 (FY 2023-2024)File: Form 5 - Riverdale Avenue - FY 2023-24.pdf15 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 - Rivedale Avenue - FY 2022-23.pdf15 Dec 2025
Withdrawal Update Form 1File: Form 1 - Rivedale Avenue - Sep 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: 13 Form 2 - Riverdale Avenue - Sep 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: 13 Form 3 - Riverdale Avenue - Sep 2025.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - Riverdale Avenue - FY 2024-25.pdf30 Sep 2025
Withdrawal Update Form 1File: RERA Form 1 - Riverdale Avenue - 30-06-2025.pdf2 Sep 2025
Withdrawal Update Form 2File: 12 Form 2 - Riverdale Avenue - June 2025.pdf2 Sep 2025
Withdrawal Update Form 3File: Avenue Form 3 June 2025.pdf2 Sep 2025
Form 1File: Form 1 - Riverdale Avenue - Mar 2023 - Counter Signed.pdf29 Aug 2025
Form 2File: 3 Form 2 - Riverdale Avenue - Mar 2023 - Counter Signed.pdf29 Aug 2025
Form 3File: 4 Form 3 - Riverdale Avenue - Mar 2023.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1 Inventory Details - Avenue - Mar 2023.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Jun 2023.pdf29 Aug 2025
Form 2File: 2 Form 2 - Riverdale Avenue - Jun 2023.pdf29 Aug 2025
Form 3File: 5 Form-3 - Riverdale Avenue - June 2023.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 2 Inventory Details - Avenue - Jun 2023.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 Inventory Details - Sep 2023.pdf29 Aug 2025
Form 3File: 6 Form-3 - Riverdale Avenue - Sep 2023.pdf29 Aug 2025
Form 2File: 5 Form 2 - Riverdale Avenue - Sep 2023.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Sep 2023.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Dec 2023.pdf29 Aug 2025
Form 2File: 6 Form 2 - Riverdale Avenue - Dec 2023.pdf29 Aug 2025
Form 3File: Form-3 - Riverdale Avenue - Dec 2023.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 Avenue.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Mar 2024.pdf29 Aug 2025
Form 2File: 7 Form 2 - Riverdale Avenue - Mar 2024.pdf29 Aug 2025
Form 3File: Form 3 Avenue Mar 2024.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Avenue Mar2024.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Sep 2024.pdf29 Aug 2025
Form 2File: Avenue 2 sep 24.pdf29 Aug 2025
Form 3File: Form 3 - Riverdale Avenue - Sep 2024.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sept 2024 Avenue.pdf29 Aug 2025
Form 1File: Form 1 - Riverdale Avenue - Jun 2024.pdf25 Aug 2025
Form 2File: 8 Form 2 - Riverdale Avenue - Jun 2024.pdf25 Aug 2025
Form 3File: Form-3 - Riverdale Avenue - June 2024.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: June 2024 Avenue.pdf25 Aug 2025
Form 1File: Form 1 Riverdale Avenue March 2025.pdf22 Jul 2025
Form 2File: Form 2 Riverdale Avenue March 2025.pdf22 Jul 2025
Form 3File: Form 3 R Avenue March 2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Avenue March 2025.pdf22 Jul 2025
Form 1File: RERA Form 1 - Riverdale Avenue - 31-12-2024.pdf10 Jul 2025
Form 2File: FORM 2 Avenue.pdf10 Jul 2025
Form 3File: Avenue Form 3 Dec24.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Avenue Sales Data.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Riverdale Avenue March 2025.pdf9 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Riverdale Avenue March 2025.pdf9 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA Form 2A Riverdale Avenue.pdf9 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avenue Form 3 Dec24_compressed.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: Avenue Sales Data.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 - Riverdale Avenue - 31-12-2024.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Avenue.pdf21 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Avenue.pdf21 Feb 2025
Declaration about Commencement CertificateFile: Declaration about CC - Avenue.pdf9 Dec 2024
Layout approvalFile: plan 01-53_compressed.pdf3 Dec 2024
Building plan approvalFile: plan 04-53 - P1 Parking and Shops_compressed.pdf3 Dec 2024
Building plan approvalFile: plan 05-53 - P2 Parking and Shops_compressed.pdf3 Dec 2024
Copy of Layout Approval (in case of layout)File: plan 01-53_compressed.pdf3 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-2053-2024 17Oct2024.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 04-53 - P1 Parking and Shops_compressed.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 05-53 - P2 Parking and Shops_compressed.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue Sept2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue Sept2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Form 2.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Riverdale Avenue - Sep-24.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Riverdale Avenue - Sep 2024.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - Riverdale Avenue - June 2024.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - Riverdale Avenue - Jun 2024.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Avenue Inv june24.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Avenue.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Riverdale Avenue - Jun 2024.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Riverdale Avenue - FY 2023-24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avenue Form 1 June24.pdf12 Aug 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Riverdale Residences-IP52100004692KHARADI-Aug 2017CompletedOct 2023Registered original: Oct 2022Late, Feb 2024
Riverdale HeightsKharadi Shivane Road Village Kharadi Talukar Haveli Pune557-CompletedFeb 2021Late, Feb 2022

Keep RIVERDALE AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEW KHARADI BEHIND ZENSER IT PARK

2 kmRIVERDALE AVENUECompleted 4Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: DUVILLE ESTATES PRIVATE LIMITED

Duville Estates Private Limited has 8 registrations on MahaRERA, including Riverdale Heights and Riverdale Residences-I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if RIVERDALE AVENUE is delayed beyond 15 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIVERDALE AVENUE?

The registered promoter entity is DUVILLE ESTATES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIVERDALE AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RIVERDALE AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIVERDALE AVENUE?

The professionals named in the filing: Architect: Pinnac AECL Consultancy Pvt Ltd; Engineer: Jones Lang LaSalle; Chartered Accountant: Dhirubhai Shah & Co LLP; Chartered Accountant: Kalyaniwalla & Mistry LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVERDALE AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVERDALE AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVERDALE AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.