Completed No litigation declared Residential / Group Housing project

Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.

By SMERA HOMES LLP

RG-MH-63721 · RERA P51800045578 · Last updated on MahaRERA portal: 13 Jun 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken
  • Rs 6.50 crore secured on the land, in favour of Capri Global Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd. is a Residential / Group Housing project by SMERA HOMES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045578 on 24 May 2022. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameRedevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.
  • TypeResidential / Group Housing
  • Location
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045578
  • ReraGenie IDRG-MH-63721

Builder

  • NameSMERA HOMES LLP
  • Entity typePartnership
  • PartnersVishal Naresh Gangwani, Girish Partabrai Gangwani, Pradeep Somashekar Shetty, Deepak Somashekar Shetty
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2022First promiseSep 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 May 2022
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Balmukund HeritageNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Balmukund Heritage: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area535 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Capital Limited
Secured amountRs 6.50 crore
Declared on27 Sep 2024
LandownerVillageDistrict
Balmukund HeritageKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI1443.96
Proposed, not sanctioned1,444 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchR C Marg Branch Chembur Mumbai 400 071

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SMERA HOMES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024689Sep 2024 → Jun 2025

Reason as filed by the promoterwe have applied for an occupancy certificate and we are waiting for the same

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Dec 2024

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: ANNEXURE E FORM 4 ARCHITECT CERTIFICATE (2).pdf13 Jun 2025
Other - FinanceFile: ANNEXURE E FORM 4 ARCHITECT CERTIFICATE (2).pdf13 Jun 2025
Other - TechnicalFile: ANNEXURE E FORM 4 ARCHITECT CERTIFICATE (2).pdf13 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Balmukund Heritage FORM 5 (1).PDF13 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: FORM 5.pdf13 Jun 2025
Architect’s Certificate on Completion of Project (Form 4)File: ANNEXURE E FORM 4 ARCHITECT CERTIFICATE (1).pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Balmukund Heritage FORM 5.PDF24 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: ANNEXURE E FORM 4 ARCHITECT CERTIFICATE.pdf16 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2444779_OC_signed.pdf16 Dec 2024
Declaration in FORM BFile: FORM B.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BALMUKUND HERITAGE.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Balmukund.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PDF.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PDF.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: BOOKED AND UNSOLD INVENTORY.pdf16 Oct 2024
Building plan approvalFile: Amendmend dwg BALMUKUND.pdf22 Jul 2024
Building plan approvalFile: Amendmend Letter 11th to 12th.pdf22 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Amendmend dwg BALMUKUND.pdf22 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Amendmend Letter 11th to 12th.pdf22 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 2364966_FurtherCC_signed upto 12th floor.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BALMUKUND HERITAGE.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BALMUKUND HERITAGE ANNEXURE B FORM 2 ENGINEER CERTIFICATE.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant's BALMUKUND.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BALMUKUND HERITAGE ANNEXURE A FORM 1 ARCHITECT CERTIFICATE.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE B FORM 2 ENGINEER CERTIFICATE.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant's Certificate (Form-3).pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BALMUKUND HERITAGE ANNEXURE A FORM 1 ARCHITECT CERTIFICATE.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE BALMUKUND CHS.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate ( Oct- Dec 2023).pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANNEXURE A FORM 1 ARCHITECT CERTIFICATE.pdf14 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE C FORM 2 ENGINEERS CERTIFIACATE BALMUKUND.pdf14 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23 ANNEXURE C FORM 2A QUALITY ASSURANCE CERTIFIACATE BALMUKUND HERITAGE.pdf14 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BALMUKUND HERTAGE CA CERTIFICATE.pdf14 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC balmukund.pdf17 May 2022
Declaration about Commencement CertificateFile: Form D.pdf17 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2- CERTIFICATE OF COST INCURRED.pdf28 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM - 2A- QUALITY ASSURANCE CERTIFICATE.pdf28 Apr 2022
Building plan approvalFile: BALMUKUND IOD approved DWG_Page_3.pdf9 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BALMUKUND IOD approved DWG_Page_3.pdf9 Apr 2022
Proforma of Allotment letterFile: DRAFT - ALLOTEMENT LETTER.pdf9 Apr 2022
Building plan approvalFile: BALMUKUND IOD approved DWG_Page_1.pdf8 Apr 2022
Building plan approvalFile: BALMUKUND IOD approved DWG_Page_2.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BALMUKUND IOD approved DWG_Page_1.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BALMUKUND IOD approved DWG_Page_2.pdf8 Apr 2022
Layout approvalFile: 2304219_IOD_signed.pdf7 Apr 2022
PAN CardFile: Smera Pan.pdf7 Apr 2022
Copy of the legal title reportFile: Title Certificate.pdf7 Apr 2022
Details of encumbrancesFile: Self Declaration.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: 2304219_IOD_signed.pdf7 Apr 2022
Declaration in FORM BFile: FORM -B.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANNEXURE A FORM 1 ARCHITECT CERTIFICATE BALMUKUKD.pdf7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234690336_For_Asset_Based_Search_07_04_2022_16_47_29_791.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BALMUKUND - CA Certificate.pdf7 Apr 2022
Proforma of Allotment letterFile: Draft copy of Agreement for Sale - Balmukund.pdf7 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Heritage ElegancePlot No. 577A CS No 709A 10 Division Dadar matunga Khushaldas Parekh Marg Near Five Garden Matunga Mumbai 400 01917OngoingDec 2024Late, Dec 2025

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 9 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Redevelopment of Sri Guruvayurappan Balmukun on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmRedevelopment of Sri GurCompleted 155Lapsed / revoked 123Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 425 registered projects within 2 km.

Builder: SMERA HOMES LLP

SMERA HOMES LLP has 3 registrations on MahaRERA, including Redevelopment of Govind Kunj and Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd. is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.?

The registered promoter entity is SMERA HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Redevelopment of Sri Guruvayurappan Balmukun to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.