Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF RAJESH MANDIR CHSL

Registered No litigation declared Residential / Group Housing project

REDEVELOPMENT OF RAJESH MANDIR CHSL

By PRANAV CONSTRUCTIONS LIMITED

RG-MH-31530 · RERA P51800079865 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 46 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
45 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

REDEVELOPMENT OF RAJESH MANDIR CHSL is a Residential / Group Housing project by PRANAV CONSTRUCTIONS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079865 on 28 Mar 2025. Possession is promised by 28 Jul 2028. 17 of the 62 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameREDEVELOPMENT OF RAJESH MANDIR CHSL
  • TypeResidential / Group Housing
  • Location
    • SHANKAR LANE
    • KANDIVALI WEST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079865
  • ReraGenie IDRG-MH-31530

Builder

  • NamePRANAV CONSTRUCTIONS LIMITED
  • Entity typeCompany
  • GSTIN27AAECP0580F1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorPRANAV KIRAN ASHAR
  • Other registrations46 more →
  • Completed24 of 47
  • Declared earlier projects29 →

Key dates

this monthRegisteredMar 2025PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Mar 2025
  • Promised completion28 Jul 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

27%17 of 62 units booked
14.0%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJESH MANDIR WING BNA9832032
RAJESH MANDIR WING ANA9830030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

RAJESH MANDIR WING B35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAJESH MANDIR WING A35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56
BuildingClosed/CoveredTotal
RAJESH MANDIR WING B2828
RAJESH MANDIR WING A2828

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,505 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
RAJESH MANDIR CHSLMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4004.89
Proposed, not sanctioned3,506 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD UNIT C AND D GROUND FLOOR S V ROAD GOREGAON WEST MUMBAI MAHARASHTRA 400104
Estimated costRs 19.84 cr
Cost incurredRs 2.78 cr
Work done14.02%
BuildingWingEstimatedIncurred
RAJESH MANDIR WING BNARs 9.07 crRs 1.41 cr
RAJESH MANDIR WING ANARs 8.88 crRs 1.38 cr
-NARs 1.90 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK P HINGOO AND ASSOCIATES
EngineerSACPL
EngineerADITYA DINESH MEHTA
Chartered AccountantNITIN VARE
Chartered AccountantMSKA & Associates
PartnerRole in project
PRANAV CONSTRUCTIONS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Jul 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Aditya Mehta - Rajesh Mandir001.pdf31 Jul 2026
Withdrawal Update Form 1File: Form 1 - Rajesh Mandir CHSL001.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 _ Rajesh Mandir CHSL001.pdf23 Jul 2026
Withdrawal Update Form 3File: From - 3-Rajesh Mandir CHSL.pdf23 Jul 2026
Form 2A (FY 2024-2025)File: Quality Assurance Certificate - Rajesh Mandir CHSL001.pdf20 May 2026
Withdrawal Update Form 1File: Rajesh Mandir001.pdf5 May 2026
Withdrawal Update Form 2File: Rajesh Mandir CHSL001.pdf5 May 2026
Withdrawal Update Form 3File: Form-3 (Rajesh Mandir)001.pdf5 May 2026
Withdrawal Update Form 1File: Form 1 Rajesh Mandir001.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 _ Rajesh Mandir CHSL.pdf24 Jan 2026
Withdrawal Update Form 3File: FORM 3_Rajesh Mandir CHSL001.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1- Rajesh Mandir.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2- Rajesh Mandir.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 - Rajesh Mandir001.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 -Rajesh Mandir.pdf27 Sep 2025
Withdrawal Update Form 1File: Fresh Form 1 - Rajesh Mandir.pdf4 Sep 2025
Withdrawal Update Form 2File: Form 2- Rajesh Mandir CHSL.pdf4 Sep 2025
Withdrawal Update Form 3File: Rajesh Mandir CHSL.pdf4 Sep 2025
Form 1File: FORM 1.pdf23 Jun 2025
Form 2File: FORM 2.pdf23 Jun 2025
Form 3File: FORM 3.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Part IOD Form 3 CA Certificate_Rajesh Mandir CHSL_31032025_compressed.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rajesh Mandir 31032025.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I_Rajesh Mandir CHSL.pdf8 Apr 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance- Rajesh Mandir CHSL.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance- Rajesh Mandir CHSL.pdf7 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and unsecured finance- New Final.pdf7 Apr 2025
Other - FinanceFile: Format A Rajesh Mandir.pdf27 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_Rajesh Mandir.pdf27 Mar 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance (Rajesh Mandir CHSL)001.pdf7 Feb 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance (Rajesh Mandir CHSL)001.pdf7 Feb 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance (Rajesh Mandir CHSL)001.pdf7 Feb 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrance (Rajesh Mandir CHSL)001.pdf7 Feb 2025
Other - TechnicalFile: Declaration Cum Undertaking (Rajesh Mandir CHSL)001.pdf7 Feb 2025
Layout approvalFile: encumbrance 01.pdf30 Jan 2025
Building plan approvalFile: Drawing_1_.pdf30 Jan 2025
Building plan approvalFile: Drawing_2.pdf30 Jan 2025
Copy of the legal title reportFile: Rajesh Mandir Title Certificate001-1-70.pdf30 Jan 2025
Copy of the legal title reportFile: Rajesh Mandir Title Certificate001-71-137_compressed.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance (Rajesh Mandir CHSL)001.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: encumbrance L.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: encumbrance 01.pdf30 Jan 2025
Proforma of Allotment letterFile: Draft Allotment Letter.pdf30 Jan 2025
Declaration in FORM BFile: ilovepdf_merged (11)_compressed.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1001.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged final (1).pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rajesh Mandir.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2458307_FirstCC_signed.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing_2.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing_1_.pdf30 Jan 2025
Declaration about Commencement CertificateFile: Derclaration about CC.pdf30 Jan 2025
CERSAI detailsFile: CERSAI WITH CLARIFICATION.pdf30 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (Rajesh Mandir CHSL)001.pdf30 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation001.pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance (Rajesh Mandir CHSL)001.pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: encumbrance L.pdf30 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Declaration AFS.pdf30 Jan 2025
Proforma of Agreement for saleFile: Agreement for Sale Rajesh Mandir.pdf30 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations.pdf30 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: ilovepdf_merged.pdf30 Jan 2025
PAN CardFile: PCL PAN Card Scan Copy.pdf29 Jan 2025
PAN CardFile: Society Pan Card_Rajesh Mandir.pdf29 Jan 2025

Promoter's earlier projects29

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

26 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
REDEVELOPMENT OF METTIVILLA CHSLP51800004896Goregaon west, Mumbai Suburban-Aug 2017CompletedDec 2028Sep 2022
REDEVELOPMENT OF LAKSHMAN TOWER CHSLP51800053601SHIMPOLI, Mumbai Suburban50Nov 2023CompletedMar 2027Apr 2026
REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSLP51800054093MALAD, Mumbai Suburban70Dec 2023CompletedFeb 2027Mar 2026
REDEVELOPMENT OF KESAR NIKETAN CHSLP51800046669BORIVALI EAST, Mumbai Suburban81Aug 2022CompletedJan 2026May 2025
REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSLP51800034915MUMBAI, Mumbai Suburban-Apr 2022CompletedSep 2025Mar 2024
REDEVELOPMENT OF GOLD COIN CHSLP51800034931MUMBAI, Mumbai Suburban-Apr 2022CompletedSep 2025Mar 2024
REDEVELOPMENT OF RUSHABH MAHAL CHSLP51800034099MALAD EAST, Mumbai Suburban43Mar 2022CompletedJun 2025May 2025
REDEVELOPMENT OF RAMESH MANDIR CHSLP51800032468MUMBAI, Mumbai Suburban-Jan 2022CompletedApr 2025Mar 2024
REDEVELOPMENT OF SPARSH CHSLP51800031623MUMBAI, Mumbai Suburban-Nov 2021CompletedMar 2025Jan 2024
REDEVELOPMENT OF PLOT NO. 212P51800034087MUMBAI, Mumbai Suburban-Mar 2022CompletedFeb 2025Nov 2023
REDEVELOPMENT OF MALAD MARUDHAR CHSLP51800032320MUMBAI, Mumbai Suburban-Dec 2021CompletedJan 2025Jul 2024
REDEVELOPMENT OF TIARA CHSLP51800034818MALAD WEST, Mumbai Suburban-Apr 2022CompletedOct 2024Oct 2024
REDEVELOPMENT OF POPULAR TERRACE CHSLP51800029351BORIVALI WEST MUMBAI, Mumbai Suburban-May 2021CompletedSep 2024Apr 2024
REDEVELOPMENT OF GALA APARTMENTS CHSLP51800029415MALAD EAST, Mumbai Suburban-May 2021CompletedSep 2024Mar 2024
REDEVELOPMENT OF SILVERENE CHSLP51800031840MUMBAI, Mumbai Suburban-Nov 2021CompletedMar 2024Sep 2023
REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSLP51800026908BORIVALI WEST MUMBAI, Mumbai Suburban-Nov 2020CompletedMar 2024Apr 2023
REDEVELOPMENT OF PUSHPAWADI CHSLP51800028108BORIWALI WEST, Mumbai Suburban-Jan 2021CompletedDec 2023Sep 2022
REDEVELOPMENT OF PRAVESH CHSLP51800020989BORIVALI EAST, Mumbai Suburban-May 2019CompletedNov 2023Aug 2022
REDEVELOPMENT OF MALAD AMBER CHSLP51800025354MUMBAI, Mumbai Suburban-Apr 2020CompletedOct 2023Oct 2023
REDEVELOPMENT OF ABHIRAM CHSLP51800018680KANDIVALI WEST, Mumbai Suburban-Nov 2018CompletedJun 2023Oct 2021
REDEVELOPMENT OF NAVCHANDRAKUNJ CHSLPlot No 42 Jawahar Nagar Road No 4 Goregaon West Mumbai23-CompletedMar 2021Mar 2020
REDEVELOPMENT OF ULKA CHSLVillage Eksar TPS Borivali No III Borivali West Mumbai29-CompletedDec 2019May 2019
REDEVELOPMENT OF MALAD RAJHANS CHSLPlot No 19 Jitendra Road Malad East Mumbai55-CompletedMar 2019Late, Apr 2019
REDEVELOPMENT OF DEEP CHSLMarve Road Village Valnai Malad West Mumbai31-CompletedDec 2018Late, Feb 2019
REDEVELOPMENT OF RAJENDRA APARTMENTS CHSLCTS No 289 289 1 to 6 Plot No 10 Village Valnai Taluka Borivali Malad West Mumbai 40006426-CompletedJul 2018Feb 2018
NEW LATA APARTMENT CHSLGAJANAN COLONY ROAD GOREGAON WEST MUMBAI 40010433-CompletedDec 2017Jun 2017
ASHUTOSH CHSLRAM MANDIR ROAD VAZIRA NAKA BORIVALI WEST MUMBAI 40009120-CompletedSep 2017Oct 2016
PRACHITI CHSLPLOT 146 ROAD NO 9 JAWAHAR NAGAR GOREGAON WEST MUMBAI 40010428-CompletedDec 2015Sep 2015
KIRAN APARTMENTSPLOT 229 ROAD NO 14 JAWAHAR NAGAR GOREGAON WEST MUMBAI 40010430-CompletedDec 2013Late, Jan 2014

How this compares with Mumbai Suburban

27%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REDEVELOPMENT OF RAJESH MANDIR CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

2 kmREDEVELOPMENT OF RAJESH Completed 154Lapsed / revoked 99Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 408 registered projects within 2 km.

Builder: PRANAV CONSTRUCTIONS LIMITED

PRANAV CONSTRUCTIONS LIMITED has 47 registrations on MahaRERA, including REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL and REDEVELOPMENT OF MALAD RAJHANS CHSL. Its filings disclose 29 earlier MahaRERA projects: declares 26 of 29 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if REDEVELOPMENT OF RAJESH MANDIR CHSL is delayed beyond 28 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REDEVELOPMENT OF RAJESH MANDIR CHSL?

The registered promoter entity is PRANAV CONSTRUCTIONS LIMITED, a company as per the filing. Its GSTIN 27AAECP0580F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REDEVELOPMENT OF RAJESH MANDIR CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REDEVELOPMENT OF RAJESH MANDIR CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REDEVELOPMENT OF RAJESH MANDIR CHSL?

The professionals named in the filing: Architect: RASIK P HINGOO AND ASSOCIATES; Engineer: SACPL; Engineer: ADITYA DINESH MEHTA; Chartered Accountant: NITIN VARE; Chartered Accountant: MSKA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REDEVELOPMENT OF RAJESH MANDIR CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REDEVELOPMENT OF RAJESH MANDIR CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REDEVELOPMENT OF RAJESH MANDIR CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.