Registered No litigation declared Residential / Group Housing project

Ruparel Optima Ph I

By Ruparel Infra & Realty Pvt Ltd

RG-MH-24862 · RERA P51800013701 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • 258 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken
  • Rs 395.00 crore secured on the land, in favour of Apolloasia

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
9 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 95%
71 of 1,535Units unsoldnot recorded sold or booked
258Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Ruparel Optima Ph I is a Residential / Group Housing project by Ruparel Infra & Realty Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013701 on 23 Oct 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 1,464 of the 1,535 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete. 258 complaints are on record with the regulator.

At a glance

Project

  • NameRuparel Optima Ph I
  • TypeResidential / Group Housing
  • Location
    • Link Road
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013701
  • ReraGenie IDRG-MH-24862

Builder

  • NameRuparel Infra & Realty Pvt Ltd
  • Entity typeCompany
  • Managing DirectorAmit Ruparel
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2017First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed95 files

Current status

95%1464 of 1,535 units booked
89.6%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Optima Ph I Bldg 1NA434354818566
Optima Ph I Bldg 2NA43434830483
Optima Ph I Bldg 3NA454347214486

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 95%.

Optima Ph I Bldg 157%
ActivityProgress
Excavation92%
Basement (if any)95%
Podiums (if any)0%
Plinth92%
Stilt Floor92%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Optima Ph I Bldg 253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Optima Ph I Bldg 356%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed351

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots351
Closed/Covered351
BuildingClosed/CoveredTotal
Optima Ph I Bldg 1153153
Optima Ph I Bldg 29696
Optima Ph I Bldg 3102102

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area25,297 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofApolloasia
Secured amountRs 395.00 crore
CERSAI search filedYes
Declared on10 Dec 2025
LandownerVillageDistrict
Skoda Construction Ganesh NagarMumbai CityMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI81963.05
Proposed, not sanctioned37,341 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThane
Estimated costRs 779.00 cr
Cost incurredRs 698.12 cr
Work done89.62%
BuildingWingEstimatedIncurred
Optima Ph I Bldg 1NARs 288.21 crRs 258.21 cr
Optima Ph I Bldg 3NARs 245.49 crRs 205.65 cr
Optima Ph I Bldg 2NARs 245.30 crRs 234.26 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Rahul Kamathi
ArchitectMr. Rahul KAmathi
EngineerAjay Pandurang Gade
EngineerSantosh Shukla
Chartered AccountantShereena Jacob
Chartered AccountantSarveshwar Sharma
PartnerRole in project
Ruparel Infra & Realty Pvt Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013797Dec 2022 → Dec 2025

Reason as filed by the promoterThe project consists of three sale Buildings of a larger SRA scheme. The project commenced in the year 2017 and was registered with MahaRERA on October 23, 2017 after we received the necessary approvals from the concerned authorities. The projected date of completion was December 31, 2021 which was further extended by one year due to covid-19 pandemic. With regards to the progress and execution of the said project we would like to bring to your kind notice certain facts. Like any other SRA project, this project too commenced with consent of slum dwellers as is mandatory for the statutory appro

EA10122518588Dec 2022 → Dec 2026

Reason as filed by the promoterThe delay in completion of the redevelopment project “Ruparel Optima” has arisen due to multiple unforeseen and uncontrollable circumstances beyond the control of the promoter. The project is being developed under the Slum Rehabilitation Authority (SRA) scheme and involves redevelopment of land occupied by five SRA societies, namely Ganesh Nagar SRA CHS, Shivsagar SRA CHS, Janapriya SRA CHS, Bahar SRA CHS and Adarsh SRA CHS, comprising an aggregate of 872 slum dwellers. Development rights were obtained earlier by M/s. Skoda Construction, which entered into a Joint Venture Agreement with the pr

Complaints filed with MahaRERA258

Case no.ComplainantRespondentFiled
CC006000000282180Rupesh Jaikaran DeshbhratarRuparel Infra & Reality Pvt Ltd.28/03/2023
CC006000000023928Chirag DesaiRuparel Infra & Realty Pvt ltd21/03/2019
CC006000000057357Ashish KejdiwalRuparel Realty18/12/2018
CC006000000141054RAJENDER P CHANDIRAMANIRUPAREL INFRA AND REALTY PRIVATE LIMITED27/09/2019
CC006000000171907Agnelo D'MelloRuparel Infra & Realty Pvt. Ltd.04/01/2020
CC006000000196232Niraj LathRuparel Infra& Realty Private Limited03/03/2021
CC006000000194383PUNIT PATELRUPAREL OPTIMA13/10/2020
CC006000000194687Raviraj Suresh WadeRuparel Infra & Realty Pvt Ltd03/11/2020
CC006000000196859Krupali Navin SavlaRuparel Infra & Realty Pvt. Ltd.07/05/2021
CC006000000396000pinesh pratap mashrooRUPAREL REALTY27/07/2023
CC006000000209793Shri. Siddesh Chandrakant Surve and Smt. Shrutika Siddesh SurveRuparel Infra & Realty Pvt.Ltd., and M/s. Skoda Construction25/01/2022
CC006000000344172MEERA DIVYESH DESAIRUPAREL INFRA & REALTY PVT LTD10/02/2023
CC006000000397937Anjali Sameer KulkarniRuparel infra and realty pvt ltd29/10/2023
CC006000000303610Dipankar MitraRuparel Infra and Realty Private Limited08/12/2022
CC006000000334126Mrs Sushmita De and Mr Biswanath DeM/s Ruparel Infra & Realty Pvt Ltd27/01/2023
CC006000000354427Abid Ali Hamid ChoudharyRuparel Optima Building20/02/2023
CC006000000374902Kartik Jayraj NadarRuparel Infra & Realty Pvt ltd23/03/2023
CC006000000364631Dhaval Hemant ParekhRuparel Infra & Realty Pvt Ltd.,08/03/2023
CC006000000374950Mr Afridul Haque and Mrs Heenakausar Afridul HaqueM/s. Windows Co-Operative Housing Society Limited25/03/2023
CC006000000374973Rakesh MenonRuparel Realty27/03/2023
CC006000000396115SHOBHANA BANSRAJ SINGHRUPAREL INFRA AND REALTY PVT LTD15/06/2023
CC006000000396874Sohanlal P. KumavatRuparel Infra & Realty Private Limited29/07/2023
CC006000000396900Nawaz Sam MehtaRuparel Infra and Realty Pvt Ltd01/08/2023
CC006000000396910Jaclyn DeSouzaRuparel Infra and Realty Pvt Ltd01/08/2023
CC006000000396992DEEPA NILESH GHUTKARUPAREL INFRA & REALTY PVT. LTD.14/08/2023
CC006000000397145Prakash Ramchandra Hadkarparikshit Ruparel18/08/2023
CC006000000397973Neelkanth SardesaiRuparel Infra & Realty Pvt. Ltd.08/03/2024
CC006000000408647Jetal Girdhardas DasaniRuparel Reality07/01/2024
CC006000000428972Seema Ravindra Baliga Chinmay Ravindra Baliga Abhijeet BaligaRuparel Infra and Realty Pvt Ltd25/01/2024
CC006000000429383Soumya Mayee PatelRuparel Infra and Realty Pvt Ltd22/02/2024
CC006000000429524purnima Reshant ShahRuparel Infra & Realty Pvt Ltd19/03/2024
CC006000000480000Bhavesh Ashok KhomneRuparel Infra & Realty Private Limited10/04/2024
CC006000000439669Nimesh Bhanjibhai VajaRuparel Infra & Realty Pvt Ltd19/03/2024
CC006000000439713Sagar Dasharath ShindeRuparel Infra & Realty Private Limited19/03/2024
CC006000000439718Dipak Devu NinaveRuparel Infra & Realty Private Limited19/03/2024
CC006000000439635Punit PurohitRuparel Infra & Realty Private Limited19/03/2024
CC006000000439711Sneha Praveen TanneerRuparel Infra & Realty Private Limited19/03/2024
CC006000000439716Shalinl Sainath KasukelaRuparel Infra & Realty Private Limited19/03/2024
CC006000000439721Parmeshwaran Ramachandran ChambravattamRuparel Infra & Realty Pvt Ltd19/03/2024
CC006000000439650Anand Kantilal DaveRuparel Infra & Realty Pvt Ltd19/03/2024
CC006000000439665Anand Kantilal DaveRuparel Infra & Realty Pvt Ltd19/03/2024
CC006000000479995Raviprakash Vijay PrajapatiRuparel Infra Realty Private Limited10/04/2024
CC006000000439722Rahul KesharwaniRuparel Infra & Realty Private Limited19/03/2024
CC006000000479965Lata Sanjeeva SalianRuparel Infra and Realty Pvt Ltd06/04/2024
CC006000000500603Bhavna ManiarM/S. Ruparel Infra and Realty Pvt. Ltd.28/05/2024
CC006000000540725Ashwin Ramnath KarandeRuparel Infra & Realty Pvt Ltd19/06/2024
CC006000000570809Mamta Dhirajlal PanchalRuparel Infra & Realty Pvt Ltd19/06/2024
CC006000000540740Prachi Prakash NamdeoRuparel Infra & Realty Pvt Ltd19/06/2024
CC006000000540729Deepak V GaikwadRuparel Infra & Realty Pvt Ltd19/06/2024
CC006000000540759Prasad Ramchandra BhideRuparel Infra & Realty Pvt Ltd19/06/2024
CC12400050Nitesh Ramchandra ShindeRuparel Infra & Realty Pvt Ltd06/09/2024
CC12400052Shilpin Ratilal DungriwalaRuparel Infra & Realty Pvt Ltd06/09/2024
CC12400163ANGAD PANKAJ PATHAKJIRuparel Infra & Realty Pvt Ltd20/09/2024
CC12400480Jayshree Amit VichareRuparel Infra & Realty Pvt Ltd20/10/2024
CC12400581Gaurav Milind Kadu-25/10/2024
CC12400821DHAVAL DINESH PRABHURuparel Infra & Realty Pvt Ltd19/11/2024
CC12400701sahil Deepak KarekarRuparel Infra & Realty Pvt Ltd07/11/2024
CC12500055DEEPA NILESH GHUTKARuparel Infra & Realty Pvt Ltd06/01/2025
CC12401036Naina SalianRuparel Infra & Realty Pvt Ltd05/12/2024
CC12401298Alok Indrabahadur YadavRuparel Infra & Realty Pvt Ltd31/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 Ruparel Optima.pdf21 Aug 2026
Withdrawal Update Form 1File: Optima.pdf16 Apr 2026
Withdrawal Update Form 216 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Optima 30092025.pdf16 Apr 2026
Form 1File: Form 1 Ruparel Optima 30062025.pdf10 Dec 2025
Form 2File: Form 2 Ruparel Optima 30062025.pdf10 Dec 2025
Form 3File: Form 3 Ruparel Optima 30062025.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Optima Sold Unsold Inventory 30062025.pdf10 Dec 2025
Form 1File: Form 1 Ruparel Optima 30092025.pdf10 Dec 2025
Form 2File: Form 2 Ruparel Optima 30092025.pdf10 Dec 2025
Form 3File: Form 3 Ruparel Optima 30092025.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Optima Sold Unsold Inventory 30092025.pdf10 Dec 2025
Form 1File: Form 1 Ruparel Optima 31032025.pdf10 Dec 2025
Form 2File: Form 2 Ruparel Optima 31032025.pdf10 Dec 2025
Form 3File: Form 3 - Ruparel Optima 31032025.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Optima Sold Unsold Inventory 31032025.pdf10 Dec 2025
Form 2A (FY 2019-2020)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf8 Dec 2025
Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf8 Dec 2025
Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf8 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A_Optima_FY 22-23 Signed.pdf8 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A_Optima_FY 23-24 Signed.pdf8 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A_Optima_FY 23-24 Signed.pdf8 Dec 2025
Form 2A (FY 2017-2018)File: Form 2A 2017-18 Signed.pdf8 Dec 2025
Form 2A (FY 2018-2019)File: Form 2A 2018-19 Signed.pdf8 Dec 2025
Form 2A (FY 2025-2026)File: Form 2A_Optima_FY 25-26.pdf8 Dec 2025
Form 5 (FY 2022-2023)File: Form 3-Optima-FY22-23.pdf6 Dec 2025
Form 5 (FY 2023-2024)File: Form 3-Optima-FY23-24.pdf6 Dec 2025
Form 5 (FY 2024-2025)File: Form 3-Optima-FY24-25.pdf6 Dec 2025
Form 5 (FY 2018-2019)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf4 Dec 2025
Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf4 Dec 2025
Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf4 Dec 2025
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf4 Dec 2025
Form 5 (FY 2017-2018)File: 1 Certificates of CA (Form 5).pdf4 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ruparel Optima.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Ruparel Optima Form 2A Final.pdf15 Feb 2025
Proforma of Agreement for saleFile: Optima Blank Draft - 23nd slab.pdf22 Sep 2023
Proforma of Agreement for saleFile: RERA Agreement Above Floor - OPTIMA Tower 2-B - 10-9-2019 - REVISED MGC -.pdf22 Sep 2023
Other - TechnicalFile: Optima PERT.pdf30 May 2023
Declaration about Commencement CertificateFile: Form D.pdf15 Feb 2023
Disclosure of sold/ booked inventoryFile: Inventory Final.pdf15 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RIRPL disc.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Optima 2019-20.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Optima 2020-21.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Optima 2021-22.pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ruparel Optima March- 2020.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ruparel Optima March- 2021.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ruparel Optima March- 2022.pdf20 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Optima-CC Sale -1.pdf29 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Optima-CC Sale -1.pdf29 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Optima CC sale -2.pdf29 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Optima CC Sale 3.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Optima.pdf2 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Optima sale 1.pdf5 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Rehab 2.pdf5 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Rehab 3.pdf5 Dec 2019
Layout approvalFile: Optima - IOA - Layout_new.pdf31 Aug 2019
Building plan approvalFile: Optima - IOA Sale Bldg 1 Covering Letter.pdf31 Aug 2019
Building plan approvalFile: Optima - IOA Sale Bldg 2 Covering Letter.pdf31 Aug 2019
Building plan approvalFile: Optima - IOA Sale Bldg 3 Covering Letter.pdf31 Aug 2019
Copy of Layout Approval (in case of layout)File: Optima - IOA - Layout_new.pdf31 Aug 2019
Building Plan Approval (IOD)File: Optima - IOA Sale Bldg 1 Covering Letter.pdf31 Aug 2019
Building Plan Approval (IOD)File: Optima - IOA Sale Bldg 2 Covering Letter.pdf31 Aug 2019
Building Plan Approval (IOD)File: Optima - IOA Sale Bldg 3 Covering Letter.pdf31 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 1.pdf31 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 2.pdf31 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 3.pdf31 Aug 2019
Certificates of CA (Form 5)File: Optima.pdf3 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 1 CC.pdf7 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 2 CC.pdf7 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Optima Sale Bldg 3 CC.pdf7 Apr 2018
Building plan approvalFile: Optima IOA Sale Bldg 1.pdf7 Oct 2017
Building plan approvalFile: Optima IOA Sale Bldg 2.pdf7 Oct 2017
Building plan approvalFile: Optima IOA Sale Bldg 3.pdf7 Oct 2017
Layout approvalFile: Sale Bld 1 - Layout.pdf7 Oct 2017
Layout approvalFile: Sale Bldg 2 - Layout.pdf7 Oct 2017

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ruparel Optima Ph I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmRuparel Optima Ph ICompleted 142Lapsed / revoked 86Other 182Dot size: filed unitsN

Filed coordinates, straight-line distance. 410 registered projects within 2 km.

Builder: Ruparel Infra & Realty Pvt Ltd

Ruparel Infra & Realty Pvt Ltd has 2 registrations on MahaRERA, including Ruparel Optima Ph I and Ruparel Panache. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ruparel Optima Ph I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ruparel Optima Ph I?

The registered promoter entity is Ruparel Infra & Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ruparel Optima Ph I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ruparel Optima Ph I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ruparel Optima Ph I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ruparel Optima Ph I?

The professionals named in the filing: Architect: Mr Rahul Kamathi; Architect: Mr. Rahul KAmathi; Engineer: Ajay Pandurang Gade; Engineer: Santosh Shukla; Chartered Accountant: Shereena Jacob; Chartered Accountant: Sarveshwar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ruparel Optima Ph I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ruparel Optima Ph I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ruparel Optima Ph I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.