Home / Browse projects / Mumbai Suburban, Maharashtra / Ruparel Skygreens I

Registered No litigation declared Residential / Group Housing project

Ruparel Skygreens I

By Shree Siddhivinayak Infrastructure & Realty

RG-MH-37952 · RERA P51800012513 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • 240 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken
  • Rs 395.00 crore secured on the land, in favour of Apollo Asia

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
6 of 11Construction stages donefurthest along: Basement (if any), 95%
76 of 481Units unsoldnot recorded sold or booked
240Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Ruparel Skygreens I is a Residential / Group Housing project by Shree Siddhivinayak Infrastructure & Realty in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012513 on 1 Sep 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 405 of the 481 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 240 complaints are on record with the regulator.

At a glance

Project

  • NameRuparel Skygreens I
  • TypeResidential / Group Housing
  • Location
    • New Link Road
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012513
  • ReraGenie IDRG-MH-37952

Builder

  • NameShree Siddhivinayak Infrastructure & Realty
  • Entity typePartnership
  • GSTIN27ABVFS5422N1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAmit Ruparel, Shree Siddhivinayak Real Homes Pvt Ltd
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2017First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed129 files

Current status

84%405 of 481 units booked

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ruparel Skygreens Ph INA44414801481

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

Ruparel Skygreens Ph I: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed480

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots480
Closed/Covered480

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,793 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofApollo Asia
Secured amountRs 395.00 crore
CERSAI search filedYes
Declared on16 Dec 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority (SRA)
Permissible FSI39637.0
Proposed, not sanctioned25,345 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThane

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Kamathi
Chartered AccountantSarveshwar & Co. LLP
Chartered AccountantShereena Jacob
PartnerRole in project
Shree Siddhivinayak Infrastructure & Realty-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013790Dec 2022 → Dec 2025

Reason as filed by the promoterOn 28/7/2017, 11 slum dwellers out of 419 slum dwellers challenged the LOI dated 18/7/2017 issued by SRA before Apex Grievance Redressal Committee (AGRC). The contention of these slum dwellers was that the Developers did have 70% consent. AGRC did not grant the interim relief so the group filed Writ Petition with Hon’ble High Court of Mumbai. The hon’ble High Court directed the AGRC to act as expeditiously as possible and directed to maintain status quo in accordance with the SR Scheme and no further approvals were issued or work was carried out on the site. Later, AGRC vide order dated 20/02/

EA18122518759Dec 2022 → Dec 2026

Reason as filed by the promoterRuparel Skygreens is a redevelopment project undertaken under the Slum Rehabilitation Authority scheme comprising rehabilitation and sale components. The rehabilitation component consists of two buildings, namely Building No. 1 and Building No. 2B, each comprising ground, stilt, and 23 upper floors. The commencement certificate for both rehabilitation buildings was initially obtained on 29 March 2017 up to plinth level and was subsequently extended up to the 23rd floor on 9th August 2019. Construction of both rehabilitation buildings has been completed. An application for Occupation Certificat

Complaints filed with MahaRERA240

Case no.ComplainantRespondentFiled
CC006000000012015BABURAO ARJUN MORESHREE SIDDHIVINAYAK INFRASTRUCTURE AND REALITY27/11/2017
CC006000000012759Delay in Project, Refund DeinedShree Siddivinayak Infrastructure and Realty06/01/2018
CC006000000054887Nitin TiwariShree Siddhivinayak Infrastructure & Realty12/06/2018
CC006000000078251Kunal Narendra WaghelaShree Siddhivinayak Infrastructure & Realty02/03/2019
CC006000000057840CHETAN MODISHREE SIDDHIVINAYAK INFRASTRUCTURE AND REALITY04/02/2019
CC006000000198959Pranav Pravinchandra Dhrafani & Siddhi P Dhrafani & Bhadra P DhrafaniShree Siddhivinayak Infrastructure & Realty (Ruparel)08/11/2021
CC006000000193695Himanshu BarbhayaRuparel Realty10/08/2020
CC006000000196783RAJKUMAR SINGHSHREE SIDDHIVINAYAK INFRASTRUCTURE & REALTY21/05/2021
CC006000000196784PAVANKUMAR V SINGHSHREE SIDDHIVINAYAK INFRASTRUCTURE & REALTY21/05/2021
CC006000000194885Mr Rajesh Chaturvedi and Mrs Sweta ChaturvediShree Siddhivinayak Infrastructure &Realty11/11/2020
CC006000000196570Jignesh R Khemani and Gulab R KhemaniShree Siddhivinayak Infrastructure & Realty31/03/2021
CC006000000199093Nikita Swapnil ShahM/s. Shree Siddhivinayak Infrastructure & Realty22/11/2021
CC006000000210029Devang M PancholiM/s. Shree Siddhivinayak Infrastructure & Realty17/02/2022
CC006000000251872Shailesh SuvarnaSiddhivinayak Infrastructure and Realty12/07/2022
CC006000000251553Pawankumar AgrawalSiddhivinayak Infrastructure and Realty21/06/2022
CC006000000251720Pawankumar AgrawalSiddhivinayak Infrastructure and Realty04/07/2022
CC006000000251399Nilesh Gopal VyasSiddhivinayak Infrastructure and Realty18/08/2022
CC006000000292601Mohit VelkarSiddhivinayak Infrastructure and Realty07/09/2022
CC006000000292777Paras JoshiM/s Siddhivinayak Infrastructure and Realty24/09/2022
CC006000000251754Mehul RajpopatSiddhivinayak Infrastructure and Realty06/07/2022
CC006000000251876Kaushal ShahSiddhivinayak Infrastructure and Realty12/07/2022
CC006000000251785Shreya ShroffSiddhivinayak Infrastructure and Realty09/07/2022
CC006000000251607Joel BarbozaSiddhivinayak Infrastructure and Realty25/06/2022
CC006000000292312Salil TambatSiddhivinayak Infrastructure and Realty12/08/2022
CC006000000251731Rushikesh BadeSiddhivinayak Infrastructure and Realty06/07/2022
CC006000000262064Saswatkumar SahooSiddhivinayak Infrastructure and Realty25/07/2022
CC006000000251514Rakesh VarmaSiddhivinayak Infrastructure and Realty18/06/2022
CC006000000262028Sagar JivrajaniSiddhivinayak Infrastructure and Realty21/07/2022
CC006000000303460Kiran ThakkarM/s Siddhivinayak Infrastructure and Realty28/11/2022
CC006000000303465Kiran ThakkarM/s Siddhivinayak Infrastructure and Realty28/11/2022
CC006000000251713Sarfarazkhan PathanSiddhivinayak Infrastructure and Realty06/07/2022
CC006000000302985Deepak Vijay AvhadM/s Siddhivinayak Infrastructure and Realty20/10/2022
CC006000000292772Tushar Bhavanishankar PandyaM/s Siddhivinayak Infrastructure and Realty27/09/2022
CC006000000251592Tanupam KarmakarShree Siddhivinayak Infrastructure & Realty23/06/2022
CC006000000251609Roshan KanchanSiddhivinayak Infrastructure and Realty24/06/2022
CC006000000251715Rajesh NichaniSiddhivinayak Infrastructure and Realty04/07/2022
CC006000000282182Soumya HegdeSiddhivinayak Infrastructure and Realty05/08/2022
CC006000000251750Chintan SanghaviSiddhivinayak Infrastructure and Realty06/07/2022
CC006000000251772Utsav RajaShree Siddhivinayak Infrastructure & Realty07/07/2022
CC006000000251877Rajesh DesaiSiddhivinayak Infrastructure and Realty15/07/2022
CC006000000251878Rajesh DesaiSiddhivinayak Infrastructure and Realty15/07/2022
CC006000000261933Sameer ArekarSiddhivinayak Infrastructure and Realty15/07/2022
CC006000000282110Siddhartha GuptaSiddhivinayak Infrastructure and Realty01/08/2022
CC006000000282112Siddhartha GuptaSiddhivinayak Infrastructure and Realty01/08/2022
CC006000000282108KHEMRAJ MOURYASiddhivinayak Infrastructure and Realty27/07/2022
CC006000000282143Naina ShahSiddhivinayak Infrastructure and Realty02/08/2022
CC006000000282145Naina ShahSiddhivinayak Infrastructure and Realty02/08/2022
CC006000000282144MANILAL BHIMSHI SHAHShree Siddhivinayak Infrastucture &Realty01/10/2022
CC006000000282162Hemang Vinodrai ParekhSiddhivinayak Infrastructure and Realty30/07/2022
CC006000000282183Jimit Rashmikant ShahSiddhivinayak Infrastructure and Realty08/08/2022
CC006000000292407Rakesh Tokarshi ShahSiddhivinayak Infrastructure and Realty26/09/2022
CC006000000292577Amrutben Tokarshi ShahM/s Siddhivinayak Infrastructure and Realty26/09/2022
CC006000000292358Amit PaulSiddhivinayak Infrastructure and Realty19/08/2022
CC006000000292367Jayshree Deepak SoniSiddhivinayak Infrastructure and Realty18/08/2022
CC006000000292579Pooja Chirag MehtaSiddhivinayak Infrastructure and Realty06/09/2022
CC006000000292720Malabika MitraSiddhivinayak Infrastructure and Realty17/09/2022
CC006000000292747Bhavisha Pradeep PanchalM/s Siddhivinayak Infrastructure and Realty21/09/2022
CC006000000302945Omkar BakreM/s Siddhivinayak Infrastructure and Realty06/10/2022
CC006000000302946Pranav BakreM/s Siddhivinayak Infrastructure and Realty06/10/2022
CC006000000302951Swetha LullaM/s Siddhivinayak Infrastructure and Realty20/10/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Ruparel Skygreens 30092025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Ruparel Sky Greens.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 Ruparel Skygreens 30092025.pdf17 Dec 2025
Form 1File: Form 1 Ruparel Sky Greens 31032025.pdf9 Jul 2025
Form 2File: Form 2 Ruparel Sky Greens 31032025.pdf9 Jul 2025
Form 3File: Form 3 Ruparel Sky Greens 31032025.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Sky Greens Sold Unsold Inventory 310325.pdf9 Jul 2025
Self-declaration of Quarterly ProgressFile: Ruparel Skygreens Self Declaration Letter 31032025.pdf9 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ruparel Skygreens 31032025.pdf8 May 2025
Certificates of CA (Form 3)File: Ruparel SkyGreens Form 3 31032025_compressed.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Ruparel Skygreens 31032025.pdf8 May 2025
Layout approvalFile: Full Set of Plans-1.pdf30 Apr 2025
Layout approvalFile: Full Set of Plans-2.pdf30 Apr 2025
Layout approvalFile: Full Set of Plans-3.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-1.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-4.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-5.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-4.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-5.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-6.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-7.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-8.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-9.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-10.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-11.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-12.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-13.pdf30 Apr 2025
Building plan approvalFile: Full Set of Plans-14.pdf30 Apr 2025
Copy of Layout Approval (in case of layout)File: Full Set of Plans-2.pdf30 Apr 2025
Copy of Layout Approval (in case of layout)File: Full Set of Plans-3.pdf30 Apr 2025
Copy of Layout Approval (in case of layout)File: Full Set of Plans-1.pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ruparel Sky Greens 31032025.pdf30 Apr 2025
Certificates of CA (Form 3)File: Form 3 Ruparel Skygreens 31032025 Signed.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ruparel Sky Greens Form 2 31032025 Signed.pdf30 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Further Extended upto 19th Flr for Wing C dt 311224.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-5.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-14.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-13.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-12.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-11.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-10.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-9.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-8.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-7.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-6.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-4.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-5.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-4.pdf30 Apr 2025
Building Plan Approval (IOD)File: Full Set of Plans-1.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Ruparel Skygreens Sold Unsold Inventory 31032025.pdf30 Apr 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Ruparel Skygreens.pdf1 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Ruparel Skygreens.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ruparel Skygreens FY 22-23.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Ruparel Skygreens FY23-24.pdf1 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SkyGreens Form5 FY22 23.pdf3 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Ruparel Skygreens.pdf2 Aug 2024

How this compares with Mumbai Suburban

84%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ruparel Skygreens I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmRuparel Skygreens ICompleted 112Lapsed / revoked 70Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: Shree Siddhivinayak Infrastructure & Realty

Shree Siddhivinayak Infrastructure & Realty has 3 registrations on MahaRERA, including Ruparel Elara and Ruparel Skygreens I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ruparel Skygreens I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ruparel Skygreens I?

The registered promoter entity is Shree Siddhivinayak Infrastructure & Realty, a partnership as per the filing. Its GSTIN 27ABVFS5422N1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ruparel Skygreens I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ruparel Skygreens I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ruparel Skygreens I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ruparel Skygreens I?

The professionals named in the filing: Architect: Rahul Kamathi; Chartered Accountant: Sarveshwar & Co. LLP; Chartered Accountant: Shereena Jacob. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ruparel Skygreens I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ruparel Skygreens I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ruparel Skygreens I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.