Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF MALAD AMBER CHSL
REDEVELOPMENT OF MALAD AMBER CHSL
By PRANAV CONSTRUCTIONS LIMITED
RG-MH-28145 · RERA P51800025354 · Last updated on MahaRERA portal: 7 Feb 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 46 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
REDEVELOPMENT OF MALAD AMBER CHSL is a Others project by PRANAV CONSTRUCTIONS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800025354 on 30 Apr 2020. The registration is recorded completed; possession was promised by 30 Oct 2023.
At a glance
Project
- NameREDEVELOPMENT OF MALAD AMBER CHSL
- TypeOthers
- Location
- ADARSH COLONY ROAD NEAR SNDT COLLEGE MALAD WEST
- MUMBAI
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800025354
- ReraGenie IDRG-MH-28145
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Apr 2020
- Promised completion30 Oct 2023
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MALAD AMBER CHSL | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MALAD AMBER CHSL: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRANAV CONSTRUCTIONS PRIVATE LIMITED | Borivali | Mumbai Suburban |
| MALAD AMBER CHSL | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| PRANAV CONSTRUCTIONS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Feb 2024
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2395019_OC_signed Malad Amber CHSL.pdf | 7 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Malad Amber CHSL001.pdf | 7 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Malad Amber as on 30092023.pdf | 26 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 MALAD AMBER CHSL 30092023_compressed.pdf | 26 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - I Architect Certificate.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Malad Amber.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MALAD AMBER CHSL compressed.pdf | 14 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MALAD AMBER CHSL.pdf | 19 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Malad Amber Signed FORM 2 31-03-2023.pdf | 18 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malad Amber Signed FORM 3 31-03-2023_compressed.pdf | 18 May 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed Malad Amber dtd 190423.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1- Malad Amber chsl.pdf | 10 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM 2 Engineers Certificate Malad Amber 31122022.pdf | 24 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certified Form 3 Malad Amber CHSL 31122022 compressed.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certified Form 5 Malad Amber 21-22.pdf | 10 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 17102022.pdf | 21 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM 2 Engineers Certificate Malad Amber as on 30092022.pdf | 21 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Malad Amber Form - 2A.pdf | 21 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA Malad Amber 30092022 COMPRESSED.pdf | 21 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certified Form 5 Malad Amber 20-21.pdf | 7 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RERA ARCHITECT'S CERTIFICATE 21072022.pdf | 3 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Malad Amber-300622 COMPRESSED.pdf | 3 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIED FORM 3 MALAD AMBER 30-06-2021.pdf | 3 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIED FORM 3 MALAD AMBER 30-06-2021.pdf | 3 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA Malad Amber 30-06-2022 COMPRESSED.pdf | 3 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2314833_FurtherCC_signed.pdf | 1 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Malad Amber CHSL.pdf | 31 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 25th Sept 2021 Malad Amber.pdf | 27 Sep 2021 |
| Building plan approvalFile: Amendletter_signed.pdf | 25 Sep 2021 |
| Building plan approvalFile: Malad Amber IOD Plan_compressed.pdf | 25 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed.pdf | 25 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Malad Amber IOD Plan_compressed.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2271588_FurtherCC_signed_Malad Amber.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2290177_FurtherCC_signed Malad Amber.pdf | 25 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Malad Amber CHSL.pdf | 25 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A 31st Sept 2020 Malad Amber CHSL.pdf | 25 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A 31st Dec 2020 Malad Amber CHSL.pdf | 25 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A 31st March 2021 Malad Amber CHSL.pdf | 25 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30th June, 2021 Malad Amber.pdf | 25 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIED FORM 3 MALAD AMBER 30-06-2021.pdf | 3 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certified Form 5 (19-20) Malad Amber.pdf | 30 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Malad Amber CHSL.pdf | 16 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2271588_FurtherCC_signed_Malad Amber.pdf | 2 Apr 2021 |
| Building plan approvalFile: IOD 08032021.pdf | 11 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD 08032021.pdf | 11 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC dated 20th Nov 2020 Malad Amber CHSL.pdf | 21 Nov 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A April to June, 2020 Malad Amber CHSL.pdf | 2 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Malad Amber CHSL.pdf | 27 Aug 2020 |
| Declaration in FORM BFile: Form B RERA I 1-39 NEW.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA I 40-72.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA I 73-115.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA I 116-147.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA II 1-38 NEW.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA II 39-72.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA II 73-115.pdf | 24 Apr 2020 |
| Declaration in FORM BFile: Form B RERA II 116-133.pdf | 24 Apr 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC Malad Amber CHSL.pdf | 31 Mar 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 4 Mar 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 4 Mar 2020 |
| Building plan approvalFile: Building Plans.pdf | 3 Mar 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plans.pdf | 3 Mar 2020 |
| Proforma of Allotment letterFile: Draft Allotment Letter.pdf | 3 Mar 2020 |
| Proforma of Allotment letterFile: Draft Sale Agreement.pdf | 3 Mar 2020 |
| Status of ConveyanceFile: Conveyance Deed 1.pdf | 3 Mar 2020 |
| Status of ConveyanceFile: Conveyance Deed 2.pdf | 3 Mar 2020 |
| Status of ConveyanceFile: Conveyance Deed 3.pdf | 3 Mar 2020 |
| Layout approvalFile: Not a Part of Layout Certificate.pdf | 2 Mar 2020 |
| PAN CardFile: PAN Card Malad Amber CHSL.pdf | 2 Mar 2020 |
| PAN CardFile: PAN Card PCPL.pdf | 2 Mar 2020 |
| Copy of the legal title reportFile: Title Certificate Malad Amber CHSL.pdf | 2 Mar 2020 |
| Details of encumbrancesFile: No Encumbrance Certificate.pdf | 2 Mar 2020 |
| Copy of Layout Approval (in case of layout)File: Not a Part of Layout Certificate.pdf | 2 Mar 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 2 Mar 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 2 Mar 2020 |
| OtherFile: Site Supervisor Certificate.pdf | 2 Mar 2020 |
Promoter's earlier projects28
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| REDEVELOPMENT OF METTIVILLA CHSLP51800004896 | Goregaon west, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2028 | Sep 2022 |
| REDEVELOPMENT OF LAKSHMAN TOWER CHSLP51800053601 | SHIMPOLI, Mumbai Suburban | 50 | Nov 2023 | Completed | Mar 2027 | Apr 2026 |
| REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSLP51800054093 | MALAD, Mumbai Suburban | 70 | Dec 2023 | Completed | Feb 2027 | Mar 2026 |
| REDEVELOPMENT OF KESAR NIKETAN CHSLP51800046669 | BORIVALI EAST, Mumbai Suburban | 81 | Aug 2022 | Completed | Jan 2026 | May 2025 |
| REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSLP51800034915 | MUMBAI, Mumbai Suburban | - | Apr 2022 | Completed | Sep 2025 | Mar 2024 |
| REDEVELOPMENT OF GOLD COIN CHSLP51800034931 | MUMBAI, Mumbai Suburban | - | Apr 2022 | Completed | Sep 2025 | Mar 2024 |
| REDEVELOPMENT OF RUSHABH MAHAL CHSLP51800034099 | MALAD EAST, Mumbai Suburban | 43 | Mar 2022 | Completed | Jun 2025 | May 2025 |
| REDEVELOPMENT OF RAMESH MANDIR CHSLP51800032468 | MUMBAI, Mumbai Suburban | - | Jan 2022 | Completed | Apr 2025 | Mar 2024 |
| REDEVELOPMENT OF SPARSH CHSLP51800031623 | MUMBAI, Mumbai Suburban | - | Nov 2021 | Completed | Mar 2025 | Jan 2024 |
| REDEVELOPMENT OF PLOT NO. 212P51800034087 | MUMBAI, Mumbai Suburban | - | Mar 2022 | Completed | Feb 2025 | Nov 2023 |
| REDEVELOPMENT OF MALAD MARUDHAR CHSLP51800032320 | MUMBAI, Mumbai Suburban | - | Dec 2021 | Completed | Jan 2025 | Jul 2024 |
| REDEVELOPMENT OF TIARA CHSLP51800034818 | MALAD WEST, Mumbai Suburban | - | Apr 2022 | Completed | Oct 2024 | Oct 2024 |
| REDEVELOPMENT OF POPULAR TERRACE CHSLP51800029351 | BORIVALI WEST MUMBAI, Mumbai Suburban | - | May 2021 | Completed | Sep 2024 | Apr 2024 |
| REDEVELOPMENT OF GALA APARTMENTS CHSLP51800029415 | MALAD EAST, Mumbai Suburban | - | May 2021 | Completed | Sep 2024 | Mar 2024 |
| REDEVELOPMENT OF SILVERENE CHSLP51800031840 | MUMBAI, Mumbai Suburban | - | Nov 2021 | Completed | Mar 2024 | Sep 2023 |
| REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSLP51800026908 | BORIVALI WEST MUMBAI, Mumbai Suburban | - | Nov 2020 | Completed | Mar 2024 | Apr 2023 |
| REDEVELOPMENT OF PUSHPAWADI CHSLP51800028108 | BORIWALI WEST, Mumbai Suburban | - | Jan 2021 | Completed | Dec 2023 | Sep 2022 |
| REDEVELOPMENT OF PRAVESH CHSLP51800020989 | BORIVALI EAST, Mumbai Suburban | - | May 2019 | Completed | Nov 2023 | Aug 2022 |
| REDEVELOPMENT OF ABHIRAM CHSLP51800018680 | KANDIVALI WEST, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2023 | Oct 2021 |
| REDEVELOPMENT OF NAVCHANDRAKUNJ CHSL | Plot No 42 Jawahar Nagar Road No 4 Goregaon West Mumbai | 23 | - | Completed | Mar 2021 | Mar 2020 |
| REDEVELOPMENT OF ULKA CHSL | Village Eksar TPS Borivali No III Borivali West Mumbai | 29 | - | Completed | Dec 2019 | May 2019 |
| REDEVELOPMENT OF MALAD RAJHANS CHSL | Plot No 19 Jitendra Road Malad East Mumbai | 55 | - | Completed | Mar 2019 | Late, Apr 2019 |
| REDEVELOPMENT OF DEEP CHSL | Marve Road Village Valnai Malad West Mumbai | 31 | - | Completed | Dec 2018 | Late, Feb 2019 |
| REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL | CTS No 289 289 1 to 6 Plot No 10 Village Valnai Taluka Borivali Malad West Mumbai 400064 | 26 | - | Completed | Jul 2018 | Feb 2018 |
| NEW LATA APARTMENT CHSL | GAJANAN COLONY ROAD GOREGAON WEST MUMBAI 400104 | 33 | - | Completed | Dec 2017 | Jun 2017 |
| ASHUTOSH CHSL | RAM MANDIR ROAD VAZIRA NAKA BORIVALI WEST MUMBAI 400091 | 20 | - | Completed | Sep 2017 | Oct 2016 |
| PRACHITI CHSL | PLOT 146 ROAD NO 9 JAWAHAR NAGAR GOREGAON WEST MUMBAI 400104 | 28 | - | Completed | Dec 2015 | Sep 2015 |
| KIRAN APARTMENTS | PLOT 229 ROAD NO 14 JAWAHAR NAGAR GOREGAON WEST MUMBAI 400104 | 30 | - | Completed | Dec 2013 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 46 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep REDEVELOPMENT OF MALAD AMBER CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MUMBAI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 73 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: PRANAV CONSTRUCTIONS LIMITED
PRANAV CONSTRUCTIONS LIMITED has 47 registrations on MahaRERA, including REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL and REDEVELOPMENT OF MALAD RAJHANS CHSL. Its filings disclose 29 earlier MahaRERA projects: declares 26 of 29 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if REDEVELOPMENT OF MALAD AMBER CHSL is delayed beyond 30 Oct 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of REDEVELOPMENT OF MALAD AMBER CHSL?
The registered promoter entity is PRANAV CONSTRUCTIONS LIMITED, a company as per the filing. Its GSTIN 27AAECP0580F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in REDEVELOPMENT OF MALAD AMBER CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for REDEVELOPMENT OF MALAD AMBER CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in REDEVELOPMENT OF MALAD AMBER CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.