Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL

Completed No litigation declared Residential / Group Housing project

REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL

By PRANAV CONSTRUCTIONS LIMITED

RG-MH-99341 · RERA P51800034915 · Last updated on MahaRERA portal: 10 Aug 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 46 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL is a Residential / Group Housing project by PRANAV CONSTRUCTIONS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034915 on 28 Apr 2022. The registration is recorded completed; possession was promised by 30 Sep 2025.

At a glance

Project

  • NameREDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL
  • TypeResidential / Group Housing
  • Location
    • BUILDING NO 4 JANKALYAN NAGAR KHARODI MALAD WEST
    • MUMBAI
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034915
  • ReraGenie IDRG-MH-99341

Builder

  • NamePRANAV CONSTRUCTIONS LIMITED
  • Entity typeCompany
  • GSTIN27AAECP0580F1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorPRANAV KIRAN ASHAR
  • Other registrations46 more →
  • Completed24 of 47
  • Declared earlier projects29 →

Key dates

this monthRegisteredApr 2022PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEW SHALIMAR APARTMENTS CHSLNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

NEW SHALIMAR APARTMENTS CHSL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered29
Open Space18

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,301 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSLBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI3456.61
Proposed, not sanctioned3,002 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD WEST MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK P HINGOO AND ASSOCIATES
EngineerSACPL
Chartered AccountantPRASHANT SHAH AND ASSOCIATES
PartnerRole in project
PRANAV CONSTRUCTIONS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2024

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Shalimar.pdf10 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2418137_OC_signed.pdf29 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-New Shalimar-SIGNED.pdf29 Mar 2024
Building plan approvalFile: Amendletter_signed.pdf12 Feb 2024
Building plan approvalFile: Amendletter_signed.pdf12 Feb 2024
Building plan approvalFile: freecompress-compress-1_.pdf12 Feb 2024
Building plan approvalFile: compress-2.pdf12 Feb 2024
Building plan approvalFile: compress-3.pdf12 Feb 2024
Building plan approvalFile: drawing-pages-1 (2) (1).pdf12 Feb 2024
Building plan approvalFile: drawing-pages-2 (6) (1).pdf12 Feb 2024
Building plan approvalFile: drawing-pages-3.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: freecompress-compress-1_.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: compress-2.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: compress-3.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: drawing-pages-1 (2) (1).pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: drawing-pages-2 (6) (1).pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: drawing-pages-3.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Amendletter_signed.pdf12 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A New Shalimar CHSL001.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate_New Shalimar Apartments CHSL 31122023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 New Shalimar CHSL as on 31122023_compressed.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Shalimar Rera 8.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: New Shalimar Apartments CHSL.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate_New Shalimar Apartments CHSL 30092023.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate New Shalimar CHSL till 30092023_compressed.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I- New Shalimar.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I-Architect Certificate - New Shalimar.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate_New Shalimar Apartments CHSL.pdf14 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate New Shalimar CHSLcompressed.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NEW SHALIMAR CHSL.pdf22 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 New Shalimar 31-03-2023_compressed.pdf22 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 New Shalimar 31-03-2023_compressed.pdf22 May 2023
Commencement Certificates / NA Order for plotted developmentFile: 2373315_FurtherCC_signed.pdf25 Apr 2023
Declaration about Commencement CertificateFile: Declaration on CC New Shalimar CHSL.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1 - Rushabh Mahal.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for Rera-New Shalimar chsl.pdf10 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM 2 Engineers Certificate New Shalimar as on 311222.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed FORM 3 RERA New Shalimar as on 31-12-2022 COMPRESSED.pdf1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for Rera Form 1.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM 2 Engineers Certificate Malad Marudhar CHSL 30092022.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM 2 Engineers Certificate New Shalimar as on 30-09-2022.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Malad Marudhar Form - 2A.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: New Shalimar Form - 2A.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certified Form 3 Malad Marudhar CHSL 30092022 compressed.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed FORM 3 RERA New Shalimar as on 30092022 compressed.pdf23 Nov 2022
Building plan approvalFile: Amendletter_signed.pdf7 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed.pdf7 Oct 2022
Details of encumbrances concerned to LegalFile: No legal encumbrance- Legal.pdf19 Sep 2022
Declaration about Commencement CertificateFile: Declaration of further CC- New Shalimar.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: FCC 1782022.pdf16 Sep 2022
Details of encumbrancesFile: Encumbrance Certificate-New Shalimar chsl.pdf12 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised New Form 3 New Shalimar CHSL Signed.pdf19 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect certificate for Rera -New Shalimar 1 MB.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate New shalimar CHSL 1MB.pdf16 Apr 2022
Layout approvalFile: No Layout Certificate.pdf6 Apr 2022
Layout approvalFile: Approved concesion 1.pdf6 Apr 2022
Layout approvalFile: Approved concesion 2.pdf6 Apr 2022
Layout approvalFile: Approved concesion 3.pdf6 Apr 2022
Layout approvalFile: Approved concesion 4.pdf6 Apr 2022
Layout approvalFile: Approved concesion 5.pdf6 Apr 2022
Layout approvalFile: Approved concesion 6.pdf6 Apr 2022
Building plan approvalFile: IOD Letter.pdf6 Apr 2022
Building plan approvalFile: New Shalimar IOD-1.pdf6 Apr 2022
Building plan approvalFile: New Shalimar IOD-2.pdf6 Apr 2022
Building plan approvalFile: New Shalimar IOD-3.pdf6 Apr 2022
Building plan approvalFile: New Shalimar IOD-4.pdf6 Apr 2022
Building plan approvalFile: New Shalimar IOD-5.pdf6 Apr 2022
PAN CardFile: PAN Card Society.pdf6 Apr 2022
PAN CardFile: PAN Card PCPL.pdf6 Apr 2022
Copy of the legal title reportFile: Format A Legal Title Report.pdf6 Apr 2022
Copy of the legal title reportFile: Format A Flow of Title.pdf6 Apr 2022
Details of encumbrancesFile: No Encumbrance Certificate.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: No Layout Certificate.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: Approved concesion 1.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: Approved concesion 2.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: Approved concesion 3.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: Approved concesion 4.pdf6 Apr 2022

Promoter's earlier projects28

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

25 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
REDEVELOPMENT OF METTIVILLA CHSLP51800004896Goregaon west, Mumbai Suburban-Aug 2017CompletedDec 2028Sep 2022
REDEVELOPMENT OF LAKSHMAN TOWER CHSLP51800053601SHIMPOLI, Mumbai Suburban50Nov 2023CompletedMar 2027Apr 2026
REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSLP51800054093MALAD, Mumbai Suburban70Dec 2023CompletedFeb 2027Mar 2026
REDEVELOPMENT OF KESAR NIKETAN CHSLP51800046669BORIVALI EAST, Mumbai Suburban81Aug 2022CompletedJan 2026May 2025
REDEVELOPMENT OF GOLD COIN CHSLP51800034931MUMBAI, Mumbai Suburban-Apr 2022CompletedSep 2025Mar 2024
REDEVELOPMENT OF RUSHABH MAHAL CHSLP51800034099MALAD EAST, Mumbai Suburban43Mar 2022CompletedJun 2025May 2025
REDEVELOPMENT OF RAMESH MANDIR CHSLP51800032468MUMBAI, Mumbai Suburban-Jan 2022CompletedApr 2025Mar 2024
REDEVELOPMENT OF SPARSH CHSLP51800031623MUMBAI, Mumbai Suburban-Nov 2021CompletedMar 2025Jan 2024
REDEVELOPMENT OF PLOT NO. 212P51800034087MUMBAI, Mumbai Suburban-Mar 2022CompletedFeb 2025Nov 2023
REDEVELOPMENT OF MALAD MARUDHAR CHSLP51800032320MUMBAI, Mumbai Suburban-Dec 2021CompletedJan 2025Jul 2024
REDEVELOPMENT OF TIARA CHSLP51800034818MALAD WEST, Mumbai Suburban-Apr 2022CompletedOct 2024Oct 2024
REDEVELOPMENT OF POPULAR TERRACE CHSLP51800029351BORIVALI WEST MUMBAI, Mumbai Suburban-May 2021CompletedSep 2024Apr 2024
REDEVELOPMENT OF GALA APARTMENTS CHSLP51800029415MALAD EAST, Mumbai Suburban-May 2021CompletedSep 2024Mar 2024
REDEVELOPMENT OF SILVERENE CHSLP51800031840MUMBAI, Mumbai Suburban-Nov 2021CompletedMar 2024Sep 2023
REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSLP51800026908BORIVALI WEST MUMBAI, Mumbai Suburban-Nov 2020CompletedMar 2024Apr 2023
REDEVELOPMENT OF PUSHPAWADI CHSLP51800028108BORIWALI WEST, Mumbai Suburban-Jan 2021CompletedDec 2023Sep 2022
REDEVELOPMENT OF PRAVESH CHSLP51800020989BORIVALI EAST, Mumbai Suburban-May 2019CompletedNov 2023Aug 2022
REDEVELOPMENT OF MALAD AMBER CHSLP51800025354MUMBAI, Mumbai Suburban-Apr 2020CompletedOct 2023Oct 2023
REDEVELOPMENT OF ABHIRAM CHSLP51800018680KANDIVALI WEST, Mumbai Suburban-Nov 2018CompletedJun 2023Oct 2021
REDEVELOPMENT OF NAVCHANDRAKUNJ CHSLPlot No 42 Jawahar Nagar Road No 4 Goregaon West Mumbai23-CompletedMar 2021Mar 2020
REDEVELOPMENT OF ULKA CHSLVillage Eksar TPS Borivali No III Borivali West Mumbai29-CompletedDec 2019May 2019
REDEVELOPMENT OF MALAD RAJHANS CHSLPlot No 19 Jitendra Road Malad East Mumbai55-CompletedMar 2019Late, Apr 2019
REDEVELOPMENT OF DEEP CHSLMarve Road Village Valnai Malad West Mumbai31-CompletedDec 2018Late, Feb 2019
REDEVELOPMENT OF RAJENDRA APARTMENTS CHSLCTS No 289 289 1 to 6 Plot No 10 Village Valnai Taluka Borivali Malad West Mumbai 40006426-CompletedJul 2018Feb 2018
NEW LATA APARTMENT CHSLGAJANAN COLONY ROAD GOREGAON WEST MUMBAI 40010433-CompletedDec 2017Jun 2017
ASHUTOSH CHSLRAM MANDIR ROAD VAZIRA NAKA BORIVALI WEST MUMBAI 40009120-CompletedSep 2017Oct 2016
PRACHITI CHSLPLOT 146 ROAD NO 9 JAWAHAR NAGAR GOREGAON WEST MUMBAI 40010428-CompletedDec 2015Sep 2015
KIRAN APARTMENTSPLOT 229 ROAD NO 14 JAWAHAR NAGAR GOREGAON WEST MUMBAI 40010430-CompletedDec 2013Late, Jan 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

2 kmREDEVELOPMENT OF NEW SHACompleted 64Lapsed / revoked 49Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: PRANAV CONSTRUCTIONS LIMITED

PRANAV CONSTRUCTIONS LIMITED has 47 registrations on MahaRERA, including REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL and REDEVELOPMENT OF MALAD RAJHANS CHSL. Its filings disclose 29 earlier MahaRERA projects: declares 26 of 29 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL?

The registered promoter entity is PRANAV CONSTRUCTIONS LIMITED, a company as per the filing. Its GSTIN 27AAECP0580F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL?

The professionals named in the filing: Architect: RASIK P HINGOO AND ASSOCIATES; Engineer: SACPL; Chartered Accountant: PRASHANT SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.