Registered Litigation declared Residential / Group Housing project

ANCHORPOINT AVIARA

By YUKTI INFRAPROJECTS LLP

RG-MH-17699 · RERA P51800055516 · Last updated on MahaRERA portal: 17 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 18%
371 of 571Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

ANCHORPOINT AVIARA is a Residential / Group Housing project by YUKTI INFRAPROJECTS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055516 on 2 Apr 2024. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 200 of the 571 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameANCHORPOINT AVIARA
  • TypeResidential / Group Housing
  • Location
    • VILLAGE VALNAI
    • MALAD (WEST)
    • Valnai
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055516
  • ReraGenie IDRG-MH-17699

Builder

  • NameYUKTI INFRAPROJECTS LLP
  • Entity typePartnership
  • GSTIN27AACFY5130B1ZJ
  • PartnerANISH ANIL GUPTA

Key dates

this monthRegisteredApr 2024First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings2 building records
  • Documents filed112 files

Current status

35%200 of 571 units booked
17.5%Work done, per cost certificate

Figures as on 17 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING -ANA423231311324
WING - BNA42322470247

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 18%.

WING -A38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING - B38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed872

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots872
Closed/Covered872
BuildingClosed/CoveredTotal
WING -A435435
WING - B437437

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,686 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI27610.66
Proposed, not sanctioned10,492 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1, GROUND FLOOR, CENTRE POINT, ANDHERI KURLA ROAD, OPP RPG TOWER, MUMBAI 400059
Estimated costRs 340.00 cr
Cost incurredRs 59.51 cr
Work done17.5%
BuildingWingEstimatedIncurred
WING -ANARs 170.00 crRs 29.75 cr
WING - BNARs 170.00 crRs 29.75 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR
ArchitectAakar Architects & Consultants
EngineerCLINT DOS SANTOS
EngineerJACOB D'SOUZA
Chartered AccountantNEHALI & CO
Chartered AccountantJimit Shah
Chartered AccountantCAS & CO
PartnerRole in project
YUKTI INFRAPROJECTS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800055516/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Litigation declared2

CaseCourtStatus
SHORT CAUSE SUIT NO 932 OF 2023/2023BOMBAY CITY CIVIL COURT AT DINDOSHI BORIVALI DIVISIONClosed
S C UNIT NO 2894 OF 2022/2022Bombay City Civil CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate - 23072026 (1).pdf17 Sep 2026
Withdrawal Update Form 2File: form 2 rera.pdf17 Sep 2026
Withdrawal Update Form 3File: Signed CA Certificate yukti infraprojects -Anchor point june 26 (1).pdf17 Sep 2026
Commencement certificateFile: fcc.pdf18 May 2026
Layout approvalFile: iod plan.pdf18 May 2026
Withdrawal Update Form 1File: form 1.pdf18 May 2026
Withdrawal Update Form 2File: FORM 2.pdf18 May 2026
Withdrawal Update Form 3File: Signed CA Certificate yukti infraprojects -Anchor point Mar 26.pdf18 May 2026
Commencement certificateFile: fcc.pdf31 Mar 2026
Withdrawal Update Form 1File: form 1.pdf31 Mar 2026
Withdrawal Update Form 2File: form 2.pdf31 Mar 2026
Withdrawal Update Form 3File: FORM 3 (2).pdf31 Mar 2026
Withdrawal Update Form 1File: form1.pdf17 Dec 2025
Withdrawal Update Form 2File: form2.pdf17 Dec 2025
Withdrawal Update Form 3File: form 3 anchor point.pdf17 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate (1).pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Crtificate Form-3 (1).pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised_CA Certificate yukti infraprojects -Anchor point Dec24 estimate change (1) (1).pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jan 2025
Proforma of Agreement for saleFile: AFS.pdf27 Dec 2024
Building plan approvalFile: IOA plan.pdf18 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA plan.pdf18 Dec 2024
Proforma of Agreement for saleFile: agreement for sale.pdf11 Oct 2024
Proforma of Agreement for saleFile: agreement for sale.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Inventory 10-10-2024 (1).pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Inventory 10-10-2024 (1).pdf10 Oct 2024
Building plan approvalFile: amended IOA.pdf16 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: amended IOA.pdf16 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: amended IOA.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: NEW CC.pdf1 Aug 2024
Declaration about Commencement CertificateFile: CC declaration-01-08-2024.pdf1 Aug 2024
Declaration about Commencement CertificateFile: CC Declaration-10-7-2024.pdf10 Jul 2024
Declaration about Commencement CertificateFile: CC Declaration-10-7-2024.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 02-07-2024.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf27 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Jun 2024
Layout approvalFile: IOA Plan_1-1.pdf6 Jun 2024
Layout approvalFile: IOA Plan_2-2.pdf6 Jun 2024
Layout approvalFile: IOA Plan_3-4.pdf6 Jun 2024
Layout approvalFile: IOA Plan_5-5.pdf6 Jun 2024
Layout approvalFile: IOA Plan_6-6.pdf6 Jun 2024
Layout approvalFile: IOA Plan_7-8.pdf6 Jun 2024
Layout approvalFile: IOA Plan_9-10.pdf6 Jun 2024
Layout approvalFile: IOA Plan_11-12.pdf6 Jun 2024
Layout approvalFile: IOA Plan_13-14.pdf6 Jun 2024
Layout approvalFile: IOA Plan_15-16.pdf6 Jun 2024
Layout approvalFile: IOA Plan_17-18.pdf6 Jun 2024
Layout approvalFile: IOA Plan_19-end.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_1-1.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_2-2.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_3-4.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_5-5.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_6-6.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_7-8.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_9-10.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_11-12.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_13-14.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_15-16.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_17-18.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA Plan_19-end.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY (1).pdf6 May 2024
Other - LegalFile: Conveyance 25 feb 2020.pdf22 Mar 2024
Other - LegalFile: Convayance Deed Icon to Yukti 1-54.pdf22 Mar 2024
Other - LegalFile: Convayance Deed Icon to Yukti 55-end.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: encumbrance legal.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: encumbrance legal.pdf21 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: doc04898920240307130037.pdf7 Mar 2024
Other - TechnicalFile: annexure A (3).pdf4 Mar 2024
Proforma of Agreement for saleFile: AFS.pdf27 Feb 2024
Deviation Report with respect to Allotment letterFile: doc04785220240227120715 (1).pdf27 Feb 2024

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANCHORPOINT AVIARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD (WEST)6,700+ in Mumbai Suburban

Builder: YUKTI INFRAPROJECTS LLP

YUKTI INFRAPROJECTS LLP has 1 registration on MahaRERA, including ANCHORPOINT AVIARA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ANCHORPOINT AVIARA is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANCHORPOINT AVIARA?

The registered promoter entity is YUKTI INFRAPROJECTS LLP, a partnership as per the filing. Its GSTIN 27AACFY5130B1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANCHORPOINT AVIARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANCHORPOINT AVIARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANCHORPOINT AVIARA?

The professionals named in the filing: Architect: AAKAR; Architect: Aakar Architects & Consultants; Engineer: CLINT DOS SANTOS; Engineer: JACOB D'SOUZA; Chartered Accountant: NEHALI & CO; Chartered Accountant: Jimit Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANCHORPOINT AVIARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANCHORPOINT AVIARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANCHORPOINT AVIARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.