Red flags
- Litigation declared, 2 cases
- 6 complaints at MahaRERA
- Rs 200.00 crore secured on the land, in favour of ICICI BANK LIMITED
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chandak Treesourus is a Others project by CHANDAK REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048658 on 12 Jan 2023. Possession is promised by 31 Dec 2028. 290 of the 630 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameChandak Treesourus
- TypeOthers
- Location
- Chinchavali Bunder
- Chinchavali
- Chinchvali
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800048658
- ReraGenie IDRG-MH-96004
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Jan 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed86 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-1 | NA | 66 | 45 | 315 | 0 | 315 |
| Tower-2 | NA | 66 | 45 | 315 | 0 | 315 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.
Tower-173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 71% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Tower-282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 65% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1400
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower-1 | 700 | 700 |
| Tower-2 | 700 | 700 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Prakash Cotton Mills Private Limited | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower-1 | NA | Rs 221.41 cr | Rs 107.52 cr |
| Tower-2 | NA | Rs 199.10 cr | Rs 96.69 cr |
| - | NA | Rs 74.21 cr | Rs 36.04 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YMS CONSULTANTS LIMITED |
| Engineer | Gopal Madugula |
| Engineer | CHIRAG SHAH |
| Chartered Accountant | Singhvi and Singhvi |
| Chartered Accountant | Kedia Singhania and Co |
| Partner | Role in project |
|---|---|
| CHANDAK REALTORS PRIVATE LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 693/2015 | City Civil Court Dindoshi | Closed |
| 124/2010 | Additional Chief Metropolitan | Closed |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503488 | Chandak Pvt. Ltd. | Ashish B Jagtap | 29/09/2025 |
| CC12503490 | Sunil Dujari | PRABHAVATI B JAGTAP | 30/09/2025 |
| CC12503491 | Sunil Dujari | SAMEER ZAVERI | 30/09/2025 |
| CC12503620 | Sunil Dujari | VIKRAM TIRUWA | 11/10/2025 |
| CC12503879 | Sunil Dujari | SAMPAT SHAMBHU GUPTA | 05/11/2025 |
| CC12602275 | Sunil Dujari | KUNAL VERMA | 17/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Treesourus Form 01.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: Form-2- CRPL-Tressours.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: Form3-March 26 Chandak Treesourus.pdf | 25 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-Chandak Treesorous-2025-26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Malad-Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Malad-Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Treesourus Project-Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Treesourus Project-Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3-March 24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CHANDAK REALTORD PVT LTS ( CHANDAK TREESOURUS ) FORM 3.pdf | 20 Jan 2026 |
| Form 1File: Malad - Form 1-30092025.pdf | 17 Oct 2025 |
| Form 2File: CRPL TRESSOURS FORM 2.pdf | 17 Oct 2025 |
| Form 3File: Malad-Form 3-30092025.pdf | 17 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Malad-sold unsold-30092025.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Chandak Treesourus-September 2025.pdf | 23 Sep 2025 |
| Form 1File: Form 1 - Treesourus June 2025.pdf | 20 Jul 2025 |
| Form 2File: Form 2- Tressourus- June 30 2025 final.pdf | 20 Jul 2025 |
| Form 3File: New Form-3 -MahaRERA PCM Malad JUNE25.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Treesourus-Sold-Unsold.pdf | 20 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect certificate-31032025.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Chandak Malad-Sold unsold-31032025.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (Chandak Realtors Pvt Ltd ) Chandak Treesources.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Tressourus- March 25.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1- Malad-3112024.pdf | 12 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: 20250125135241-merged-merged.pdf | 25 Jan 2025 |
| Details of encumbrances concerned to LegalFile: 20250125135241-merged-merged.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Malad-3112024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Malad-3112024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Malad-Sold and unsold-31122024.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- CRPL-malad-2023-24.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Chandak Treesourus.pdf | 4 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Malad-June 2024.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Malad-September 2024.pdf | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Malad-30062024.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Malad-30092024.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Malad-Form 1-30062024.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Malad-Form 1-30092024.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Chandak Treesources Date-30062024.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Chandak Treesources Date- 30092024.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-March 24.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March 24.pdf | 4 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-March 24.pdf | 4 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Malad 31032024.pdf | 10 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Malad Tower 2 Further CC till 11th floor.pdf | 19 Jan 2024 |
| Declaration about Commencement CertificateFile: Malad-Declaration about CC.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect-Form1.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Treesourus Dec-23.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Treesourus Dec-23.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Malad- quarter update.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Malad Sep-23.pdf | 21 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Malad Sep-23.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Chandak Trrsourous Form 5 2022-23.pdf | 7 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Chandak Trrsourous Form 5 2022-23.pdf | 7 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Malad Sept 23.pdf | 14 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Malad-Sold and Unsold- 30092023-1-19.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Malad Jun-23.pdf | 30 Sep 2023 |
| CERSAI detailsFile: 2- CERSAI_Search_Report_200281737295_For_Asset_Based_Search_27_09_2023_13_42_40_633.pdf | 27 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Decalaration to Legal Encrumbances-RERA (Malad).pdf | 2 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Decalaration to Legal Encrumbances-RERA (Malad).pdf | 2 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Malad- Finance.pdf | 11 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Malad- Finance.pdf | 11 Aug 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 9 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Malad - Architects certificate.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Malad Form 2 March 2023.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Malad Form 3 March 2023.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Malad.pdf | 6 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Self Declaration.pdf | 4 Jan 2023 |
| CERSAI detailsFile: CERSAI-Asset Based Search Report- Malad Project.pdf | 3 Jan 2023 |
| Copy of the legal title reportFile: RERA Legal Title Report -compressed.pdf | 28 Dec 2022 |
| Layout approvalFile: Layout plan.pdf | 26 Dec 2022 |
| Building plan approvalFile: IOD building plan_compressed.pdf | 26 Dec 2022 |
| PAN CardFile: pan card of crpl.pdf | 26 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Declaration merged.pdf | 26 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Declaration merged.pdf | 26 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD building plan_compressed.pdf | 26 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Dec 2022 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 26 Dec 2022 |
| Declaration in FORM BFile: Form B -CRPL.pdf | 26 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects surveyors certificate (Form 1).pdf | 26 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Chandak Treesourus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chinchavali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 456 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
ARKADE ASCEND
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: CHANDAK REALTORS PRIVATE LIMITED
CHANDAK REALTORS PRIVATE LIMITED has 5 registrations on MahaRERA, including Chandak Treesourus and Chandak Highscape City 1A. Its filings disclose 10 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Chandak Treesourus is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chandak Treesourus?
The registered promoter entity is CHANDAK REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chandak Treesourus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Chandak Treesourus?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Chandak Treesourus?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Chandak Treesourus?
The professionals named in the filing: Architect: YMS CONSULTANTS LIMITED; Engineer: Gopal Madugula; Engineer: CHIRAG SHAH; Chartered Accountant: Singhvi and Singhvi; Chartered Accountant: Kedia Singhania and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chandak Treesourus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback