Completed No litigation declared Residential / Group Housing project

RAUNAK BLISS PHASE A

By UNNATHI ASSOCIATES

RG-MH-25062 · RERA P51700005363 · Last updated on MahaRERA portal: 28 Jan 2025

Source: official MahaRERA filing

Red flags

  • 12 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
12Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

RAUNAK BLISS PHASE A is a Residential / Group Housing project by UNNATHI ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700005363 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. 12 complaints are on record with the regulator.

At a glance

Project

  • NameRAUNAK BLISS PHASE A
  • TypeResidential / Group Housing
  • Location
    • owale
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005363
  • ReraGenie IDRG-MH-25062

Builder

  • NameUNNATHI ASSOCIATES
  • Entity typePartnership
  • PartnersSHYAMAL VIJAY MODY, SUMIT VIJAY MODY, SANGEETA KIRTI SHAH, KUSHAL KIRTI SHAH, KALPANA VIJAY MODY
  • Other registrations13 more →
  • Completed4 of 14
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA370000
A2NA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 28 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Swimming PoolYes0%

Parking filed214

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots214
Closed/Covered214
BuildingClosed/CoveredTotal
A1131131
A28383

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI18921.84
Proposed, not sanctioned14,434 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGLEN MARGAN, VEER SAVERKAR MARG, PANCHPAKHADI, THANE W, MAHARASHTRA - 400602

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
UNNATHI ASSOCIATES-

Litigation declared5

CaseCourtStatus
439/06/2006THANE CIVIL COURTPENDING
1351/12/2012THANE CIVIL COURTPENDING
2141/12/2012THANE CIVIL COURTPENDING
323/5/2005THANE CIVIL COURTPENDING
481/2021/2021Thane Civil CourtOngoing

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000396501UNNATHI ASSOCIATESMr. Sachin Kishor Vadnere01/07/2023
CC006000000479827UNNATHI ASSOCIATESArchana Pramod Singh28/03/2024
CC006000000479830UNNATHI ASSOCIATESAjmer Singh Virdi28/03/2024
CC006000000479831UNNATHI ASSOCIATESRaksha Rakesh Vichare28/03/2024
CC006000000479904UNNATHI ASSOCIATESVISHWAS S KAMBLE02/04/2024
CC006000000480258UNNATHI ASSOCIATESMr. Amol Vijay Tambe26/04/2024
CC006000000480261UNNATHI ASSOCIATESNachiket N. Barve26/04/2024
CC006000000480321UNNATHI ASSOCIATESMrs. Indirabai Shivaji Langote01/05/2024
CC006000000480334UNNATHI ASSOCIATESMr. Gajendravardan Athimoolam02/05/2024
CC006000000530687UNNATHI ASSOCIATESRaksha Rakesh Vichare07/06/2024
CC12503961CHETAN JANARDAN PATILUNNATHI ASSOCIATES11/11/2025
CC12603022Deepti Ravindra ManeUNNATHI ASSOCIATES21/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jan 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf28 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 A1 A2.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BlissA1 A2 OC Certificate Dt30122024.pdf16 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 A1 A2.pdf8 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1 A2.pdf13 Dec 2024
Certificates of CA (Form 3)File: CA Certificate Raunak Bliss A 30092024.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase A.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 15_Form-2A-Raunak Bliss A.pdf2 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_Bliss_A1A2.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form 3 RB A1-A2 24-06-2023.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Raunak Bliss Phase A Form 2A 2023.pdf4 Oct 2023
Layout approvalFile: Raunak Bliss Layout 15062022.pdf7 Aug 2023
Building plan approvalFile: Building-Plan-A1.pdf7 Aug 2023
Building plan approvalFile: Building-Plan-A2.pdf7 Aug 2023
Copy of Layout Approval (in case of layout)File: Raunak Bliss Layout 15062022.pdf7 Aug 2023
Building Plan Approval (IOD)File: Building-Plan-A1.pdf7 Aug 2023
Building Plan Approval (IOD)File: Building-Plan-A2.pdf7 Aug 2023
Certificates of CA (Form 3)File: CA_A1_A2_020523.pdf7 Aug 2023
Details of encumbrancesFile: UA-ICICI-Index II.pdf4 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: UA_FORM5_RAUNAK BLISS PHASE A_21-22.pdf22 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_Raunak Bliss.pdf11 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bliss A_Form1_AC.pdf8 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bliss A_Form2_EC.pdf8 Jun 2022
Certificates of CA (Form 3)File: Bliss A_FOrm3_CA.pdf8 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Bliss Phase A_22.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Raunak Bliss phase A.pdf8 Apr 2022
Form 2AFile: Raunak Bliss Phase A.pdf18 Oct 2021
Form 2AFile: Raunak Bliss A.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Raunak Bliss - A.pdf17 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Bliss CC.pdf17 Aug 2020
Details of Restarting of Construction work post lockdownFile: RB - A RERA Updation - Restarting Work.pdf26 Jun 2020
Form 2AFile: Raunak Bliss - A.pdf3 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Raunak Bliss - A.pdf20 Dec 2019
Form 2AFile: Form - 2A Raunak Bliss-A.pdf7 Nov 2019
Form 2AFile: Form 2A- UA- Raunak Bliss-A.pdf1 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: RAUNAK BILLS CC-9-03-2018.pdf21 Feb 2019
Certificates of CA (Form 5)File: Raunak Bliss Phase A.pdf15 Oct 2018
Layout approvalFile: 1.pdf29 Jul 2017
Layout approvalFile: 2.pdf29 Jul 2017
Layout approvalFile: 3.pdf29 Jul 2017
Layout approvalFile: 4.pdf29 Jul 2017
Layout approvalFile: 4a.pdf29 Jul 2017
Layout approvalFile: 6.pdf29 Jul 2017
Layout approvalFile: 7.pdf29 Jul 2017
Layout approvalFile: 8.pdf29 Jul 2017
Building plan approvalFile: 1.pdf29 Jul 2017
Copy of the legal title reportFile: T1.pdf29 Jul 2017
Copy of the legal title reportFile: T2.pdf29 Jul 2017
Copy of the legal title reportFile: T3.pdf29 Jul 2017
Copy of the legal title reportFile: T4.pdf29 Jul 2017
Copy of the legal title reportFile: T5.pdf29 Jul 2017
Copy of the legal title reportFile: T6.pdf29 Jul 2017
Copy of the legal title reportFile: T7.pdf29 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 3.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4a.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 6.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 7.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 8.pdf29 Jul 2017
Building Plan Approval (IOD)File: 1.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC BLISS.pdf29 Jul 2017
Declaration in FORM BFile: Form B Raunak Bliss A1 A2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Raunak Bliss Phase A.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate Annexure.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: FSA n allotment Raunak Bliss A1 A2.pdf29 Jul 2017
PAN CardFile: PAN Unnathi Associates.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Raunak Bliss.pdf28 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAUNAK HEIGHTS BUILDING H1OPP DNYAN SARITA COLLEGE GHODBUNDER ROAD VILLAGE OWALE THANE 40061573CompletedDec 2015Nov 2015
UNNATHI GREENS PHASE VIIOPP DNYAN SARITA COLLEGE GHODBUNDER ROAD VILLAGE VADAVALI THANE 400607333CompletedMar 2012Mar 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAUNAK BLISS PHASE A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near owale7,600+ in Thane

2 kmRAUNAK BLISS PHASE ACompleted 65Lapsed / revoked 24Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: UNNATHI ASSOCIATES

UNNATHI ASSOCIATES has 14 registrations on MahaRERA, including RAUNAK HEIGHTS and RAUNAK DELIGHT. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RAUNAK BLISS PHASE A is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAUNAK BLISS PHASE A?

The registered promoter entity is UNNATHI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAUNAK BLISS PHASE A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAUNAK BLISS PHASE A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAUNAK BLISS PHASE A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in RAUNAK BLISS PHASE A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAUNAK BLISS PHASE A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAUNAK BLISS PHASE A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.