Rajveer Creation
RG-MH-38433 · RERA P52100018448 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 39 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rajveer Creation is a Others project by Waghere Promoters in Pune, Maharashtra, registered with MahaRERA as P52100018448 on 1 Nov 2018. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 39 months from the original filing. 2 of the 40 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameRajveer Creation
- TypeOthers
- Location
- Old Telco Road
- NehruNagar
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411018
- Pincode411018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018448
- ReraGenie IDRG-MH-38433
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Nov 2018
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 25 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Bldg | NA | 8 | 8 | 30 | 10 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
A Bldg: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prakash Bajrang Nikam | Sinhgad Road | Pune |
| Vikas Bajrang Nikam | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Bldg | NA | Rs 3.91 cr | Rs 3.91 cr |
| - | NA | Rs 33.33 lakh | Rs 33.33 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahendra Thakur |
| Engineer | Ram Randhave |
| Engineer | Sana Construction |
| Engineer | Vikas Chavan |
| Chartered Accountant | A N J K & CO LLP |
| Chartered Accountant | G N MANTRI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Waghere Promoters | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apply for extension of the following project Rajveer Creationregistered with the regulatory authority vide project registration certificate bearing no. P52100018448which expires on 30/12/2022.We request you to grant extension of RERA Registration for a furtherperiod of 12 months i.e.upto29/12/2023. The above change proposed is due to change in Layout Approval and Building Plan Approval and commencement certificate obtained dated 31.01.2022. The project is sanctioned now at full capacity due to which it will consume extra time to complete the project. Hence we propose to apply for change in
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100018448 up to 31/07/2024. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100018448 up to 31/03/2025. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100018448 up to 31/03/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 March 26 Rajveer Creation.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: Form 2 March 26 Rajveer Creation.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: form 3 March 26 Rajveer Creation.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: Form 1 Rajveer Creation dec 25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Rajveer Creation dec 25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Rajveer Creation Dec 25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Rajveer Creation sept 25.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer Creation sept 25.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Rajveer Creation sept 25.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Rajveer creation 30 06 2025 ....pdf | 14 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer creation 30 june 2025.pdf | 14 Jul 2025 |
| Withdrawal Update Form 3File: form 3 Rajveer creation 30 june 2025.pdf | 14 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: form 3 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: form 3 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: form 3 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: form 3 Rajveer creation 30 june 2025.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 25 Rajveer creation.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: CA Certificate - March 2025 - Signed.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 25 Rajveer creation.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf | 23 Apr 2025 |
| Other - TechnicalFile: PERT Chart.pdf | 20 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Rajveer Creation 2025_Signed.pdf | 20 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 18 Mar 2025 |
| Declaration in FORM BFile: Form B -Declaration by promoter.pdf | 18 Mar 2025 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 18 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 18 Mar 2025 |
| Other - TechnicalFile: Plinth Certificate.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificate September 2024 - Sign.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificate - Dec 2024 - Sign.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Sept 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Dec 2024.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory September 2024.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2024.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 March 24 .pdf | 19 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 June 24.pdf | 19 Aug 2024 |
| Declaration in FORM BFile: Form B extension Rajveer Creation 24.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engineer Certificate 31 March 2024.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30 June 2024.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Quality Assurance 23-24.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 31 March 24.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 30 June 24.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 rajveer creation till 31 March 2024.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 rajveer creation till 30 June 2024.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: CA Certificate December 2023 Signed_11zon.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: CA Certificate December 2023 Signed_11zon.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed 22-23.pdf | 28 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate form2 Rajveer creation .pdf | 21 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200252762789_For_Asset_Based_Search_21_11_2022_15_48_34_518.pdf | 21 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Signed 18-19.pdf | 21 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed 19-20.pdf | 21 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed 20-21.pdf | 21 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed 21-22.pdf | 21 Nov 2022 |
| Layout approvalFile: Layout approval.pdf | 17 Nov 2022 |
| Building plan approvalFile: sanction plan 2.pdf | 17 Nov 2022 |
| Building plan approvalFile: sanction plan 3.pdf | 17 Nov 2022 |
| Details of encumbrancesFile: Encrumbances certificate finance .pdf | 17 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Encrumbances certificate legal.pdf | 17 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Encrumbances certificate legal.pdf | 17 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Layout approval.pdf | 17 Nov 2022 |
| Building Plan Approval (IOD)File: sanction plan 2.pdf | 17 Nov 2022 |
| Building Plan Approval (IOD)File: sanction plan 3.pdf | 17 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 17 Nov 2022 |
| Declaration about Commencement CertificateFile: C C Declaration .pdf | 17 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate .pdf | 17 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Quality assurance 19-20.pdf | 17 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality assurance 20-21.pdf | 17 Nov 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ManikBaug Orchid Phase 1 | S.No.109 110 NehruNagar Pimpri | 184 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rajveer Creation on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NehruNagar13,700+ in Pune
Filed coordinates, straight-line distance. 62 registered projects within 2 km.
Godrej Emerald Waters
Godrej Properties Limited
Mahindra Citadel - Phase 5
Mahindra Lifespace Developers limited
Mahindra Citadel Phase 1
Mahindra Lifespace Developers limited
Bramha Sky Uzuri Phase 2
BRAMHA LEISURES PVT LTD
RAJVEER IMPERIA
Waghere Associates
KOHINOOR SHANGRILA PHASE 2
KOHINOOR PROPERTIES
Builder: Waghere Promoters
Waghere Promoters has 3 registrations on MahaRERA, including Manikbaug Orchid and Rajveer Nucleus. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Rajveer Creation shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Rajveer Creation is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rajveer Creation?
The registered promoter entity is Waghere Promoters, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rajveer Creation?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Rajveer Creation?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rajveer Creation?
The professionals named in the filing: Architect: Mahendra Thakur; Engineer: Ram Randhave; Engineer: Sana Construction; Engineer: Vikas Chavan; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: G N MANTRI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rajveer Creation?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback