Raj Vega

By Rajesh Arvind Surti

RG-MH-19300 · RERA P51800078392 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 50%
1Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Raj Vega is a Residential / Group Housing project by Rajesh Arvind Surti in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078392 on 11 Dec 2024. Possession is promised by 31 Dec 2029. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRaj Vega
  • TypeResidential / Group Housing
  • Location
    • Shri Nageshwar Parshwanath Derasar Road
    • Railwaymens Apnaghar CHSL
    • Mogra
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078392
  • ReraGenie IDRG-MH-19300

Builder

  • NameRajesh Arvind Surti
  • Entity typeIndividual
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

4.8%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

A WING: 5% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,100 sq m
Land owned byThe promoter
Named landownersNone
Declared on16 May 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI5494.78
Proposed, not sanctioned5,495 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBLDG'M',PALM COURT COMPLEX,NEW LINK RD (GOREGAON-MALAD LINK ROAD),MALAD(WEST)
Estimated costRs 33.32 cr
Cost incurredRs 1.59 cr
Work done4.78%
BuildingWingEstimatedIncurred
A WINGNARs 30.85 crRs 1.59 cr
-NARs 2.47 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH ARUN ZIRMUTE Arun Zirmute
EngineerMAHESH TANAJI GODAMBE Tanaji Godambe
Chartered AccountantAJAY SHOBHA & CO ajay gupta
PartnerRole in project
Raj builders & Developers-

Litigation declared3

CaseCourtStatus
12137 OF 2023 /2023BOMBAY HIGH COURTOngoing
213 OF 2024/2024HIGH COURT OF BOMBAYOngoing
105148/2007CITY CIVIL COURT AT MUMBAIOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501315Nandkishore PophaleRajesh Arvind Surti21/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Raj Vega (Architect certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: Form-1 Raj Vega (Architect certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: Form-1 Raj Vega (Architect certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Form-2 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Form-2 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Form-2 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: Form-3 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: Form-3 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: Form-3 Raj Vega (Engineer certificate)Jan To March 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: Form-1 Raj Vega (Architect certificate) Oct to Dec 2025.pdf25 May 2026
Withdrawal Update Form 2File: Form-2 Raj Vega (engineer certificate) Oct to Dec 2025.pdf25 May 2026
Withdrawal Update Form 3File: Form-3 Raj Vega (CA certificate) Oct to Dec 2025.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate..pdf11 Sep 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate..pdf11 Sep 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate..pdf11 Sep 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate..pdf11 Sep 2025
Withdrawal Update Form 3File: Form - 3.pdf11 Sep 2025
Withdrawal Update Form 3File: Form - 3.pdf11 Sep 2025
Form 1File: Form 1 Architect certificate.pdf27 May 2025
Form 2File: Form 2 Engineers Certificate.pdf27 May 2025
Form 3File: Form 3 CA Certificate.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf27 May 2025
Self-declaration of Quarterly ProgressFile: Form - B.pdf27 May 2025
Form 1File: Form 1 Architect Certificate.pdf27 May 2025
Form 2File: Form 2 Engineer Certificate.pdf27 May 2025
Form 3File: Form 3 CA Certificate.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Dislosure of Sold & booked Inventory.pdf27 May 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf27 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf26 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf26 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: rera mail.pdf22 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B rera (1) (1).pdf15 Nov 2024
Other - LegalFile: Conveyance Deed Pramod Rai (3).pdf9 Nov 2024
Other - LegalFile: Conveyance Deed Shamrathi Rai (1).pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (6).pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (2).pdf21 Oct 2024
Other - TechnicalFile: Annexure-A Declaration-Cum-Undertaking.pdf17 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured.pdf17 Oct 2024
Details of encumbrances concerned to FinanceFile: Declaration Towards Encumbrances.pdf17 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A(1) (2).pdf17 May 2024
Details of encumbrances concerned to LegalFile: Declaration Towards Encumbrances.pdf17 May 2024
Building plan approvalFile: IOD Letter.pdf16 May 2024
Layout approvalFile: 12.pdf16 May 2024
Layout approvalFile: 10.pdf16 May 2024
Layout approvalFile: 9.pdf16 May 2024
Layout approvalFile: 8.pdf16 May 2024
Layout approvalFile: 7.pdf16 May 2024
Layout approvalFile: 4.pdf16 May 2024
Layout approvalFile: 3.pdf16 May 2024
Layout approvalFile: 2.pdf16 May 2024
Layout approvalFile: scan0532 (1) (1).pdf16 May 2024
Layout approvalFile: IOD Letter.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 3.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 12.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 10.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 9.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 8.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 7.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 4.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 2.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: scan0532 (1) (1).pdf16 May 2024
Copy of Layout Approval (in case of layout)File: IOD Letter.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Letter.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf10 May 2024
Proforma of Allotment letterFile: Allotment Letter.pdf10 May 2024
Declaration in FORM BFile: Form B - Affidavit Cum Declaration.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate for RERA.pdf10 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf10 May 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate (1).pdf10 May 2024
CERSAI detailsFile: Cersai Declaration.pdf10 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Declaration.pdf10 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrance.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Declaration.pdf10 May 2024
Proforma of Agreement for saleFile: Agreement format.pdf10 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organizations (1).pdf10 May 2024
PAN CardFile: Pan card.pdf23 Apr 2024
Copy of the legal title reportFile: 33.pdf23 Apr 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late3 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RAJ PANTHEONP51800003673New Subhash Nagar, Mumbai Suburban180Aug 2017OngoingJun 2024Registered original: Dec 2022Not delivered
Raj ResidencyP51800002739New Subhash Nagar Goregaon West, Mumbai Suburban-Aug 2017OngoingDec 2022Registered original: Dec 2021Not delivered
Raj SpacesP51800008872Borivali, Mumbai Suburban-Aug 2017OngoingDec 2019Registered original: Dec 2018Not delivered
Sai PrasadSubash Nagar NO 3 Motilal Nagar Nagar Goregaon West Mumbai 40010420-CompletedSep 2006Late, Apr 2009

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raj Vega on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Railwaymens Apnaghar CHSL6,700+ in Mumbai Suburban

2 kmRaj VegaCompleted 96Lapsed / revoked 53Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: Rajesh Arvind Surti

Rajesh Arvind Surti has 4 registrations on MahaRERA, including Raj Residency and RAJ PANTHEON. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Raj Vega is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raj Vega?

The registered promoter entity is Rajesh Arvind Surti, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raj Vega?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Raj Vega?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Raj Vega?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raj Vega?

The professionals named in the filing: Architect: SANTOSH ARUN ZIRMUTE Arun Zirmute; Engineer: MAHESH TANAJI GODAMBE Tanaji Godambe; Chartered Accountant: AJAY SHOBHA & CO ajay gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raj Vega?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raj Vega. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raj Vega to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.