Home / Browse projects / Mumbai Suburban, Maharashtra / PREM BUILDERS

Registered Litigation declared Commercial project

PREM BUILDERS

By PREM BUILDERS

RG-MH-73103 · RERA P51800013919 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 24 months from the original
1 of 11Construction stages donefurthest along: Internal walls, 95%
135 of 321Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

PREM BUILDERS is a Commercial project by PREM BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013919 on 2 Nov 2017. Possession is promised by 25 Oct 2026. The completion date has moved by 24 months from the original filing. 186 of the 321 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NamePREM BUILDERS
  • TypeCommercial
  • Location
    • GUFA ROAD
    • JOGESHWARI EAST
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013919
  • ReraGenie IDRG-MH-73103

Builder

  • NamePREM BUILDERS
  • Entity typePartnership
  • PartnersALPA CHANDRAKANT SHAH, BHARTI CHANDRAKANT SHAH, RASHMI BIJAL MALDE, DINESH JADAVJI VORA

Key dates

this monthRegisteredNov 2017First promiseOct 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Nov 2017
  • Promised completion25 Oct 2026
  • Revised completionRevised to 25 Oct 2026 (originally 25 Oct 2024)
  • Buildings1 building record
  • Documents filed92 files

Current status

58%186 of 321 units booked
74.3%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALE BUILDINGNA14130321321

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SALE BUILDING: 72% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed315

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots315
Closed/Covered315

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,016 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Apr 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI24540.89
Proposed, not sanctioned24,541 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCADELL ROAD JUNCTION DADAR WEST MUMBAI 400028
Estimated costRs 252.86 cr
Cost incurredRs 187.86 cr
Work done74.3%
BuildingWingEstimatedIncurred
SALE BUILDINGNARs 252.86 crRs 187.86 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONSULTANT COBINED
EngineerJW CONSULTANTS LLP
EngineerTEJAM CONSULTANTS
Chartered AccountantJAYSHREE NITIN BHANUSHALI
Chartered AccountantSURAJ SHETTY
PartnerRole in project
PREM BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011428Oct 2024 → Oct 2026

Reason as filed by the promoterPREVIOUSLY PROJECT WAS UNDER DCR 1991 AND NOW IT IS UNDER DCR 2034 SO INCREASE IN THE NUMBER OF FLOORS AND BUILTUP AREA

Litigation declared9

CaseCourtStatus
4/2017SLUM TRIBUNALClosed
27/2014SLUM TRIBUNALClosed
3007/2014CITY CIVIL DINDOSHIOngoing
476/2015SMALL CAUSES COURT BANDRAOngoing
599/2015SMALL CAUSES COURT BANDRAOngoing
600/2015SMALL CAUSES COURT BANDRAOngoing
544/2015SMALL CAUSES COURT BANDRAOngoing
270/2015SMALL CAUSES COURT BANDRAOngoing
3007/2014CITY CIVIL DINDOSHIOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Oct 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1- ARCHITECT CERTIFICATE 2026-2027-QPR1 03-07-2026.pdf6 Jul 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERTIFICATE 2026-2027-QPR1 03-07-2026.pdf6 Jul 2026
Withdrawal Update Form 3File: FORM 3-CA CERTIFICATE 2026-2027-Q1 04-07-2026.pdf6 Jul 2026
Withdrawal Update Form 1File: FORM 1- ARCHITECT CERTIFICATE 2025-2026 Q4.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERTIFICATE 2025-2026-QPR4 24-04-2026.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3-CA CERTIFICATE 2025-2026 Q4.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECTS CERTIFICATE 2025-2026 QPR2 signed.pdf10 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECTS CERTIFICATE 2025-2026 QPR2 signed.pdf10 Apr 2026
Withdrawal Update Form 2File: FORM-2 ENGINEERS CERTIFICATE 2025-2026 QPR2 signed.pdf10 Apr 2026
Withdrawal Update Form 2File: FORM-2 ENGINEERS CERTIFICATE 2025-2026 QPR2 signed.pdf10 Apr 2026
Withdrawal Update Form 3File: FORM-3 FY 2022-2023.pdf10 Apr 2026
Withdrawal Update Form 3File: FORM-3 PREM BUILDERS 2025-2026 QPR2 signed.pdf10 Apr 2026
Form 1File: FORM-1 ARCHITECTS CERTIFICATE 14-07-2025.pdf5 Feb 2026
Form 2File: FORM-2 ENGINEERS CERTIFICATE 14-07-2025.pdf5 Feb 2026
Form 3File: FORM-3 SELF DECLARATION.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLUSER OF SOLD INVENTRY 17-07-2025.pdf5 Feb 2026
OthersFile: FORM-2A CERIFICATE FOR QUALITY ASSURANCE 14-07-2025.pdf5 Feb 2026
Form 1File: FORM-1 ARCHITECTS CERTIFICATE 03-02-2026.pdf4 Feb 2026
Form 2File: FORM-2 ENGINEERS CERTIFICATE 03-02-2026.pdf4 Feb 2026
Form 3File: FORM-3 SELF DECLARATION.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLUSER OF SOLD INVENTRY 31-12-2025.pdf4 Feb 2026
OthersFile: FORM-2A CERIFICATE FOR QUALITY ASSURANCE 03-02-2026.pdf4 Feb 2026
Form 1File: FORM 1-ARCHITECT'S CERTIFICATE.pdf18 Jul 2025
Form 2File: FORM 2-ENGINEER CERTIFICATE.pdf18 Jul 2025
Form 3File: FORM 3-2023-2024.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCOLUSER OF SOLD INVENTRY 31-03-2024.pdf18 Jul 2025
OthersFile: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE 2024.pdf18 Jul 2025
Form 1File: FORM 1-ARCHITECT'S CERTIFICATE.pdf18 Jul 2025
Form 2File: FORM 2-ENGINEER’S CERTIFICATE.pdf18 Jul 2025
Form 3File: FORM 3 PREM BUILDERS.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCOLUSER OF SOLD INVENTRY 31-03-2025.pdf18 Jul 2025
OthersFile: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE FY 2024-25.pdf18 Jul 2025
Certificates of CA (Form 3)File: FORM 3 PREM BUILDERS.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 PREM BUILDERS FY 2024-245.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER’S CERTIFICATE.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER’S CERTIFICATE.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE FY 2024-25.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE FY 2024-25.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT'S CERTIFICATE.pdf2 Apr 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT'S CERTIFICATE.pdf14 Feb 2025
Certificates of CA (Form 3)File: FORM 3-2023-2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER CERTIFICATE.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: SALE BUILDING FULL CC 31-12-24.pdf14 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about all RERA Designated Bank Accounts.pdf14 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf14 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf14 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE 2022.pdf14 Feb 2025
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE PREM BUILDER.pdf14 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organisations.pdf14 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE 2023.pdf14 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-CERIFICATE FOR QUALITY ASSURANCE 2024.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-2023-2024.pdf14 Feb 2025
Certificates of CA (Form 3)File: FORM-3 FY 2022-2023.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 FY 2022-2023.pdf29 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: PREM BUILDERS SALE CC TILL 6TH FLOOR 09-03-2023.pdf28 Apr 2023
Certificates of CA (Form 3)File: FORM 3.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf28 Apr 2023
Certificates of CA (Form 3)File: FORM 3 CHARTED ACCOUNTANT CERTIFICATE.pdf2 Mar 2022
CERSAI detailsFile: 4-CERSAI DETAILS CERTIFICATE ASSET BASED PREM BUILDERS.pdf8 Feb 2022
CERSAI detailsFile: 4-CERSAI DETAILS CERTIFICATE ASSET BASED PREM BUILDERS.pdf8 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 5-CHARTED ACCONTANT ANNUAL REPORT FORM 5(UT) 2017-2018.pdf8 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 6-CHARTED ACCONTANT ANNUAL REPORT FORM 5(UT) 2018-2019.pdf8 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 7-CHARTED ACCONTANT ANNUAL REPORT FORM 5(UT) 2019-2020.pdf8 Feb 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE .pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SITE SUPERVISOR CERIFICATE FOR QUALITY ASSURANCE FORM 2A MARCH 2020.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SITE SUPERVISOR CERIFICATE FOR QUALITY ASSURANCE FORM 2A MARCH 2021.pdf17 Jan 2022
CERSAI detailsFile: CERSAI UNDERTAKING.pdf17 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD-BOOKED INVENTRY.pdf17 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CHARTED ACCONTANT ANNUAL REPORT FORM 5(UT) 2020-2021.pdf17 Jan 2022
OtherFile: PREM BUILDERS SALE BUILDING AMENDED PLAN 30-09-2021 PART-2.pdf17 Jan 2022
OtherFile: PREM BUILDERS SALE BUILDING AMENDED PLAN 30-09-2021 PART-1.pdf17 Jan 2022
OtherFile: PREM BUILDERS SALE BUILDING AMENDED PLAN 30-09-2021 PART-2.pdf17 Jan 2022
OtherFile: SALE BUILDING REVALIDATED CC 11-10-2021.pdf17 Jan 2022
Proforma of Allotment letterFile: PROFORMA OF AGREEMENT OF SALE OF PREM BUILDERS 03-04-2018.pdf3 Apr 2018
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER OF PREM BUILDERS 03-04-2018.pdf3 Apr 2018
PAN CardFile: PREM BUILDERS PAN CARD.pdf10 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: PREM BUILDERS SALE CC.pdf10 Nov 2017
Building plan approvalFile: SAL IOA PLAN .pdf17 Oct 2017

How this compares with Mumbai Suburban

58%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PREM BUILDERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI EAST6,700+ in Mumbai Suburban

2 kmPREM BUILDERSCompleted 103Lapsed / revoked 65Abeyance 1Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 296 registered projects within 2 km.

Builder: PREM BUILDERS

PREM BUILDERS has 1 registration on MahaRERA, including PREM BUILDERS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PREM BUILDERS is delayed beyond 25 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PREM BUILDERS?

The registered promoter entity is PREM BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PREM BUILDERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PREM BUILDERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PREM BUILDERS?

The professionals named in the filing: Architect: CONSULTANT COBINED; Engineer: JW CONSULTANTS LLP; Engineer: TEJAM CONSULTANTS; Chartered Accountant: JAYSHREE NITIN BHANUSHALI; Chartered Accountant: SURAJ SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PREM BUILDERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PREM BUILDERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PREM BUILDERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.