Home / Browse projects / Mumbai Suburban, Maharashtra / JP Parkway
JP Parkway
RG-MH-36828 · RERA P51800046839 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Rs 115.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JP Parkway is a Others project by Srushti Raj Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046839 on 14 Sep 2022. Possession is promised by 31 Dec 2028. 287 of the 499 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameJP Parkway
- TypeOthers
- Location
- Village Majas
- Jogeshwari East
- Andheri
- Mumbai Suburban
- 400060
- Pincode400060
- RERA no.P51800046839
- ReraGenie IDRG-MH-36828
Builder
- NameSrushti Raj Developers LLP
- Entity typePartnership
- PartnerVijay Jain
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Sep 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed148 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 2 Sale Wing A | NA | 23 | 21 | 187 | 0 | 187 |
| Building No 2 Sale Wing B | NA | 23 | 21 | 187 | 0 | 187 |
| Building No 2 Sale Wing C | NA | 23 | 22 | 106 | 19 | 125 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
Building No 2 Sale Wing A27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 2 Sale Wing B27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 2 Sale Wing C27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed310
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building No 2 Sale Wing A | 117 | 117 |
| Building No 2 Sale Wing B | 114 | 114 |
| Building No 2 Sale Wing C | 79 | 79 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 2 Sale Wing A | NA | Rs 95.53 cr | Rs 23.20 cr |
| Building No 2 Sale Wing B | NA | Rs 95.53 cr | Rs 23.20 cr |
| Building No 2 Sale Wing C | NA | Rs 95.53 cr | Rs 23.20 cr |
| - | NA | Rs 32.87 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V S VAIDYA AND ASSOCIATES |
| Engineer | AVP STRUCTURAL CONSULTANTS |
| Engineer | VIJAY JOSHI |
| Chartered Accountant | CAS & CO |
| Chartered Accountant | SGCO & CO LLP |
| Chartered Accountant | SGCO & Co. LLP |
| Partner | Role in project |
|---|---|
| Srushti Raj Developers LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503649 | Vikas Vinod Singh | Gagan Vishwakarma(Channel Partner) | 14/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed148
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 148 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A JP Parkway.pdf | 15 May 2026 |
| Building plan approvalFile: 1.pdf | 6 May 2026 |
| Building plan approvalFile: 2.pdf | 6 May 2026 |
| Building plan approvalFile: 3.pdf | 6 May 2026 |
| Building plan approvalFile: 4.pdf | 6 May 2026 |
| Building plan approvalFile: 5.pdf | 6 May 2026 |
| Building plan approvalFile: 6.pdf | 6 May 2026 |
| Building plan approvalFile: 7.pdf | 6 May 2026 |
| Building plan approvalFile: 8.pdf | 6 May 2026 |
| Building plan approvalFile: 9.pdf | 6 May 2026 |
| Building plan approvalFile: 10.pdf | 6 May 2026 |
| Building plan approvalFile: 11.pdf | 6 May 2026 |
| Building plan approvalFile: 12.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 JP Parkway 31032026.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 JP Parkway 31032026.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form 3 JP Parkway 31032026.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 JP Parkway.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 JP Parkway 31122025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 JP Parkway 31122025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form 1- JP Parkway 30092025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form 2_Signed Copy_ Jp Parkway Sale Bldg_ As on 30-09-25.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - JP Parkway 30092025.pdf | 14 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A_Signed Copy_Highway Touch Sale_FY24-25.pdf | 9 Oct 2025 |
| Form 5 (FY 2024-2025)File: RERA Form 5 - JP Parkway March 25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 4 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 SALE.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 SALE.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 4 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Aug 2025 |
| Form 1File: Form 1.pdf | 17 Jul 2025 |
| Form 2File: Form 2.pdf | 17 Jul 2025 |
| Form 3File: Form 3.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold- Jp Parkway.pdf | 17 Jul 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - Highway Touch - March 2024.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - Highway Touch - March 2024.pdf | 15 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold- JP Parkway.pdf | 1 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - JP Parkway - Dec 2024.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-JP Parkway - Dec 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - Dec 2024.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- highwaytouch sep 24.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-unsold inventory details-Highway Touch-Sep 2024.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Codename Highway Touch As on 30-09-24.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Highway Touch March 24.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Highway Touch - June 2024.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - June 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - June 2024.pdf | 16 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Codename Highway Touch - Encumberance.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Codename Highway Touch - Sept 24.pdf | 29 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Codename Highway Touch - Encumberance.pdf | 29 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Codename Highway Touch_Sale Bldg.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked June 24 Highway Touch.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Codename Highway Touch-June 2024.pdf | 13 Aug 2024 |
| Proforma of Agreement for saleFile: Agreement - July 2024.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-unsold inventory details-Codename Highway Touch-March 2024.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - March 2024.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Highway Touch - March 2024.pdf | 29 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory-Codename Highway Touch-Dec 2023.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Highway Touch Bldg 2-Dec 2023.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Codename Highway Touch - Dec 2023.pdf | 18 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Codename Highway Touch - March 2024.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Highway Touch Bldg 2-Sep 2023.pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory - Sep 2023- Highway touch.pdf | 18 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration of CC-Feb 2024.pdf | 4 Mar 2024 |
| Layout approvalFile: Layout Plan.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-1.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-2.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-3.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-4.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-5.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-6.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-7.pdf | 26 Feb 2024 |
| Building plan approvalFile: Building Plan-8.pdf | 26 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 148 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep JP Parkway on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jogeshwari East6,700+ in Mumbai Suburban
RATAN HERITAGE
NEXUS BUILDERS & DEVELOPERS
Gyan Gold Crest
Gyan S. P. Developers LLP
PREM BUILDERS
PREM BUILDERS
Edenrose
Hillview Venture
AIM Garden
AIM Developers
STANS ARIZE
STANS BUILDTECH HOUSING
See every Mumbai Suburban project, with the district possession charts
Builder: Srushti Raj Developers LLP
Srushti Raj Developers LLP has 1 registration on MahaRERA, including JP Parkway. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if JP Parkway is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JP Parkway?
The registered promoter entity is Srushti Raj Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JP Parkway?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against JP Parkway?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for JP Parkway?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JP Parkway?
The professionals named in the filing: Architect: V S VAIDYA AND ASSOCIATES; Engineer: AVP STRUCTURAL CONSULTANTS; Engineer: VIJAY JOSHI; Chartered Accountant: CAS & CO; Chartered Accountant: SGCO & CO LLP; Chartered Accountant: SGCO & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JP Parkway?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback