Home / Browse projects / Mumbai Suburban, Maharashtra / JP Parkway

Registered No litigation declared Others project

JP Parkway

By Srushti Raj Developers LLP

RG-MH-36828 · RERA P51800046839 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 115.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
212 of 499Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 148 documents Report an error

JP Parkway is a Others project by Srushti Raj Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046839 on 14 Sep 2022. Possession is promised by 31 Dec 2028. 287 of the 499 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJP Parkway
  • TypeOthers
  • Location
    • Village Majas
    • Jogeshwari East
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • RERA no.P51800046839
  • ReraGenie IDRG-MH-36828

Builder

  • NameSrushti Raj Developers LLP
  • Entity typePartnership
  • PartnerVijay Jain

Key dates

this monthRegisteredSep 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Sep 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed148 files

Current status

58%287 of 499 units booked
21.8%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2 Sale Wing ANA23211870187
Building No 2 Sale Wing BNA23211870187
Building No 2 Sale Wing CNA232210619125

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 2 Sale Wing A27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 2 Sale Wing B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 2 Sale Wing C27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed310

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots310
Closed/Covered310
BuildingClosed/CoveredTotal
Building No 2 Sale Wing A117117
Building No 2 Sale Wing B114114
Building No 2 Sale Wing C7979

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,884 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 115.00 crore
CERSAI search filedYes
Declared on22 Dec 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI23771.44
Proposed, not sanctioned23,771 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJuhu, JVPD Scheme, Vile Parle West
Estimated costRs 319.45 cr
Cost incurredRs 69.60 cr
Work done21.79%
BuildingWingEstimatedIncurred
Building No 2 Sale Wing ANARs 95.53 crRs 23.20 cr
Building No 2 Sale Wing BNARs 95.53 crRs 23.20 cr
Building No 2 Sale Wing CNARs 95.53 crRs 23.20 cr
-NARs 32.87 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV S VAIDYA AND ASSOCIATES
EngineerAVP STRUCTURAL CONSULTANTS
EngineerVIJAY JOSHI
Chartered AccountantCAS & CO
Chartered AccountantSGCO & CO LLP
Chartered AccountantSGCO & Co. LLP
PartnerRole in project
Srushti Raj Developers LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503649Vikas Vinod SinghGagan Vishwakarma(Channel Partner)14/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed148

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 148 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A JP Parkway.pdf15 May 2026
Building plan approvalFile: 1.pdf6 May 2026
Building plan approvalFile: 2.pdf6 May 2026
Building plan approvalFile: 3.pdf6 May 2026
Building plan approvalFile: 4.pdf6 May 2026
Building plan approvalFile: 5.pdf6 May 2026
Building plan approvalFile: 6.pdf6 May 2026
Building plan approvalFile: 7.pdf6 May 2026
Building plan approvalFile: 8.pdf6 May 2026
Building plan approvalFile: 9.pdf6 May 2026
Building plan approvalFile: 10.pdf6 May 2026
Building plan approvalFile: 11.pdf6 May 2026
Building plan approvalFile: 12.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 JP Parkway 31032026.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 JP Parkway 31032026.pdf6 May 2026
Withdrawal Update Form 3File: Form 3 JP Parkway 31032026.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 JP Parkway.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 JP Parkway 31122025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 JP Parkway 31122025.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1- JP Parkway 30092025.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2_Signed Copy_ Jp Parkway Sale Bldg_ As on 30-09-25.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 - JP Parkway 30092025.pdf14 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A_Signed Copy_Highway Touch Sale_FY24-25.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: RERA Form 5 - JP Parkway March 25.pdf29 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf4 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf4 Aug 2025
Withdrawal Update Form 2File: FORM 2 SALE.pdf4 Aug 2025
Withdrawal Update Form 2File: FORM 2 SALE.pdf4 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf4 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf4 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf1 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf1 Aug 2025
Form 1File: Form 1.pdf17 Jul 2025
Form 2File: Form 2.pdf17 Jul 2025
Form 3File: Form 3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold- Jp Parkway.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 - Highway Touch - March 2024.pdf16 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf15 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf15 Jul 2025
Withdrawal Update Form 3File: Form 3 - Highway Touch - March 2024.pdf15 Jul 2025
Disclosure of sold/ booked inventoryFile: sold unsold- JP Parkway.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - JP Parkway - Dec 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-JP Parkway - Dec 2024.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - Dec 2024.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- highwaytouch sep 24.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-unsold inventory details-Highway Touch-Sep 2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Codename Highway Touch As on 30-09-24.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Highway Touch March 24.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Highway Touch - June 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - June 2024.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - June 2024.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: Codename Highway Touch - Encumberance.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Codename Highway Touch - Sept 24.pdf29 Oct 2024
Details of encumbrances concerned to LegalFile: Codename Highway Touch - Encumberance.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Codename Highway Touch_Sale Bldg.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Booked June 24 Highway Touch.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Codename Highway Touch-June 2024.pdf13 Aug 2024
Proforma of Agreement for saleFile: Agreement - July 2024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold-unsold inventory details-Codename Highway Touch-March 2024.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Codename Highway Touch - March 2024.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Highway Touch - March 2024.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory-Codename Highway Touch-Dec 2023.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Highway Touch Bldg 2-Dec 2023.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Codename Highway Touch - Dec 2023.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Codename Highway Touch - March 2024.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Highway Touch Bldg 2-Sep 2023.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory - Sep 2023- Highway touch.pdf18 Mar 2024
Declaration about Commencement CertificateFile: Declaration of CC-Feb 2024.pdf4 Mar 2024
Layout approvalFile: Layout Plan.pdf26 Feb 2024
Building plan approvalFile: Building Plan-1.pdf26 Feb 2024
Building plan approvalFile: Building Plan-2.pdf26 Feb 2024
Building plan approvalFile: Building Plan-3.pdf26 Feb 2024
Building plan approvalFile: Building Plan-4.pdf26 Feb 2024
Building plan approvalFile: Building Plan-5.pdf26 Feb 2024
Building plan approvalFile: Building Plan-6.pdf26 Feb 2024
Building plan approvalFile: Building Plan-7.pdf26 Feb 2024
Building plan approvalFile: Building Plan-8.pdf26 Feb 2024

How this compares with Mumbai Suburban

58%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP Parkway on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari East6,700+ in Mumbai Suburban

Builder: Srushti Raj Developers LLP

Srushti Raj Developers LLP has 1 registration on MahaRERA, including JP Parkway. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JP Parkway is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP Parkway?

The registered promoter entity is Srushti Raj Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP Parkway?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JP Parkway?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JP Parkway?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JP Parkway?

The professionals named in the filing: Architect: V S VAIDYA AND ASSOCIATES; Engineer: AVP STRUCTURAL CONSULTANTS; Engineer: VIJAY JOSHI; Chartered Accountant: CAS & CO; Chartered Accountant: SGCO & CO LLP; Chartered Accountant: SGCO & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JP Parkway?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP Parkway. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP Parkway to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.