AIM Garden

By AIM Developers

RG-MH-61476 · RERA P51800047985 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
183 of 291Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

AIM Garden is a Others project by AIM Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047985 on 7 Dec 2022. Possession is promised by 31 Jul 2029. 108 of the 291 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAIM Garden
  • TypeOthers
  • Location
    • Caves Road
    • Jogeshwari East
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047985
  • ReraGenie IDRG-MH-61476

Builder

  • NameAIM Developers
  • Entity typePartnership
  • GSTIN27ABOFA8731H1Z4
  • PartnersIrfan Abdul Sattar Malkani, Aijaz Abdul Sattar Malkani
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2022PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion31 Jul 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

37%108 of 291 units booked
97.5%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AIM GardenNA222223853291

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

AIM Garden: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,490 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
Sai Garden SRA C.H.S (Prop.)AndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI8798.93
Proposed, not sanctioned6,518 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4,5,9,10, Kesar Plaza, Caves Road, Jogeshwari East, 400060
Estimated costRs 48.22 cr
Cost incurredRs 47.04 cr
Work done97.55%
BuildingWingEstimatedIncurred
AIM GardenNARs 48.22 crRs 47.04 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDaddy & Associates
EngineerMohamed Umer Malkani
Chartered AccountantRANK & Associates
Chartered AccountantP. V. Thakkar & Company
PartnerRole in project
AIM Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AIM Garden form 1 Q4 FY 25-26.pdf28 Apr 2026
Withdrawal Update Form 2File: AIM Garden Form 2 Q4 FY 25-26.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26 AIM Garden Final Signed_compressed.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 AIM Garden as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2 AIM Garden as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 3File: AIM Garden Form 3 as on 31122025 Final Signed.pdf7 Mar 2026
Withdrawal Update Form 1File: AIM Garden form 1 Q2 FY 25-26.pdf13 Jan 2026
Withdrawal Update Form 1File: AIM Garden form 1 Q2 FY 25-26.pdf13 Jan 2026
Withdrawal Update Form 2File: AIM Garden form 2.pdf13 Jan 2026
Withdrawal Update Form 2File: AIM Garden form 2 Q2 FY 25-26.pdf13 Jan 2026
Withdrawal Update Form 3File: Signed AIM Garden form 3 Q2.pdf13 Jan 2026
Withdrawal Update Form 3File: Signed AIM Garden form 3 Q2.pdf13 Jan 2026
Form 1File: Form 1 AIM Garden Q1.pdf14 Oct 2025
Form 2File: AIM Garden form 2.pdf14 Oct 2025
Form 3File: Signed AIM Garden form3 Q1 (1).pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: AIM Garden DOS Q1.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Signed AIM Garden form 5.pdf8 Oct 2025
Form 1File: Form 1_Q4 of FY 24-45.pdf2 Jun 2025
Form 2File: Form 2_Q4.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf2 Jun 2025
Form 3File: Form 3_AIM Garden_Q4 of FY 24-25_compressed.pdf2 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AIM Garden_Form 5.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aim Garden_Form 3_Dec 2024_11zon.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: DOS.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: DOS_AIM Garden.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Aim Garden_Q2 of FY 24-25.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_AIM Garden_Q2 of FY 24-25.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Aim Garden Q2 of FY 24-25.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_23-24.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: AIM Garden_Disc of sold unsold as 31032024.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_22-23.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_23-24.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold as on 31012024.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Revised.pdf26 Apr 2024
Declaration about Commencement CertificateFile: Format D_AIM Garden.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM GARDEN - 10-11-2023.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf17 Apr 2024
Layout approvalFile: LAYOUT- 09-10-2023.pdf16 Apr 2024
Building plan approvalFile: IOD COVERING_09-10-2023.pdf16 Apr 2024
Building plan approvalFile: 1, 2_FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building plan approvalFile: 3, REFUGEE FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building plan approvalFile: 4 to 13 FLOOR PLAN_FSI - 09-10-2023.pdf16 Apr 2024
Building plan approvalFile: 15 TO 18 FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building plan approvalFile: FLOOR 16 TO 22 PLAN - 09-10-2023.pdf16 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT- 09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD COVERING_09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1, 2_FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3, REFUGEE FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 to 13 FLOOR PLAN_FSI - 09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 15 TO 18 FLOOR PLAN - 09-10-2023.pdf16 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: FLOOR 16 TO 22 PLAN - 09-10-2023.pdf16 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM GARDEN - 08-08-2023.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: AIM Garden Disc of sold unsold as on 30092023.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - AIM GARDEN_Signed.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold_AIM Garden_compressed.pdf8 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory as 31032023_compressed.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_AIM Garden.pdf22 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale--RERA_Deviation.pdf22 Nov 2022
Details of encumbrances concerned to FinanceFile: Declaration Legal and Finance merged copy.pdf15 Nov 2022
Details of encumbrances concerned to LegalFile: Declaration Legal and Finance merged copy.pdf15 Nov 2022
Building plan approvalFile: IOA 102.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA 102.pdf9 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Final.pdf9 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory.pdf9 Nov 2022
CERSAI detailsFile: CERSAI Search Report.pdf9 Nov 2022
Proforma of Agreement for saleFile: Agreement for Sale--RERA.pdf9 Nov 2022
Layout approvalFile: layout Approval.pdf3 Nov 2022
Building plan approvalFile: layout Approval.pdf3 Nov 2022
Building plan approvalFile: IOA Plan.pdf3 Nov 2022
Building plan approvalFile: IOA Plan 2.pdf3 Nov 2022
Building plan approvalFile: IOA_Plan 3.pdf3 Nov 2022
Building plan approvalFile: IOA_Plan 4.pdf3 Nov 2022
Building plan approvalFile: IOA Plan 5.pdf3 Nov 2022
Copy of Layout Approval (in case of layout)File: layout Approval.pdf3 Nov 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Aim Residency 1Jogeshwari East Mumbai 400060108CompletedJul 2022Jul 2022
Kashmiri HeightsJogeshwari East Mumbai 40006084CompletedApr 2019Apr 2019
Rathod NiwasJogeshwari East Mumbai 40006036CompletedApr 2018Apr 2018

How this compares with Mumbai Suburban

37%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AIM Garden on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari East6,700+ in Mumbai Suburban

2 kmAIM GardenCompleted 83Lapsed / revoked 41Abeyance 1Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: AIM Developers

AIM Developers has 1 registration on MahaRERA, including AIM Garden. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AIM Garden is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AIM Garden?

The registered promoter entity is AIM Developers, a partnership as per the filing. Its GSTIN 27ABOFA8731H1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AIM Garden?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AIM Garden?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AIM Garden?

The professionals named in the filing: Architect: Daddy & Associates; Engineer: Mohamed Umer Malkani; Chartered Accountant: RANK & Associates; Chartered Accountant: P. V. Thakkar & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AIM Garden?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AIM Garden. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AIM Garden to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.