Home / Browse projects / RAHEJA MODERN VIVAREA SOUTH TOWER
RAHEJA MODERN VIVAREA SOUTH TOWER
By K RAHEJA CORP REAL ESTATE PRIVATE LIMITED
RG-MH-92062 · RERA P51900034288 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
- Rs 700.00 crore secured on the land, in favour of HDFC Limited
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAHEJA MODERN VIVAREA SOUTH TOWER is a Residential / Group Housing project by K RAHEJA CORP REAL ESTATE PRIVATE LIMITED in MAHALAXMI, 400011, registered with MahaRERA as P51900034288 on 30 Mar 2022. Possession is promised by 30 Sep 2028. 138 of the 152 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameRAHEJA MODERN VIVAREA SOUTH TOWER
- TypeResidential / Group Housing
- Location
- KESHAVRAO KHADYE MART
- MAHALAXMI
- 400011
- Pincode400011
- RERA no.P51900034288
- ReraGenie IDRG-MH-92062
Builder
- NameK RAHEJA CORP REAL ESTATE PRIVATE LIMITED
- Entity typeCompany
- CINU40300MH2007PTC287012
- GSTIN27AABCF1838M1ZF
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsSUNIL MADHAV HINGORANI, RAMESH RANGANATHAN, RAVI CHANDRU RAHEJA, NEEL CHANDRU RAHEJA
- Company SecretoryJIGNASHA CHETAN THAKKAR
- Other registrations20 more →
- Completed1 of 21
- No longer live8 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Mar 2022
- Promised completion30 Sep 2028
- Revised completionNone
- Buildings1 building record
- Documents filed137 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Raheja Modern Vivarea South Tower | NA | 53 | 41 | 152 | 0 | 152 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 79%.
Raheja Modern Vivarea South Tower: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 79% |
| Sanitary Fittings within the flats / premises | 7% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 79% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 69% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 69% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 76% |
| Water Supply | Yes | 83% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 83% |
| Storm Water Drains | Yes | 89% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 1% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 83% |
| Solid Waste Management And Disposal | Yes | 5% |
| Water conservation /Rain water harvesting | Yes | 69% |
| Energy managemcnt | Yes | 65% |
| Fire protection and fire safety requirements | Yes | 79% |
| Electrical meter room, sub-station, receiving station | Yes | 71% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | No | Not applicable |
Parking filed435
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Modern India Limited - Landowner | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Raheja Modern Vivarea South Tower | NA | Rs 441.53 cr | Rs 259.48 cr |
| - | NA | Rs 7.98 cr | Rs 99.28 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Barai Architects |
| Engineer | Mohan Jakati |
| Chartered Accountant | S N Doshi & Associates |
| Chartered Accountant | Kapadia Associates |
| Chartered Accountant | G.M. Kapadia & Co. |
| Chartered Accountant | G M Kapadia & Co |
| Partner | Role in project |
|---|---|
| K RAHEJA CORP REAL ESTATE PRIVATE LIMITED | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 104240/2010 | City Civil Court Mumbai | Pending |
| 104754/2011 | City Civil Court Mumbai | Ongoing |
| 104240/2010 | City Civil Court, Mumbai | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504354 | Ramisa Soorya | K RAHEJA CORP REAL ESTATE PRIVATE LIMITED | 08/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2028
Documents filed137
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-12-26 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-12-19 RMV-ST (Nov2025) UPLOAD.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-12-24 RMV-ST (Nov2025) krcrepl UPLOAD1.pdf | 14 Jul 2026 |
| Form 2A (FY 2025-2026)File: 2A Engineers Certificate 2026-05-29 RMV-ST FY 2025-26 UPLOAD.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-12-26 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-12-19 RMV-ST (Nov2025) UPLOAD.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-12-24 RMV-ST (Nov2025) krcrepl UPLOAD1.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-12-26 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 9 Jan 2026 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-12-19 RMV-ST (Nov2025) UPLOAD.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-12-24 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-12-26 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-12-19 RMV-ST (Nov2025) UPLOAD.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-12-24 RMV-ST (Nov2025) krcrepl UPLOAD.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-10-10 RMV-ST (Sept 2025) krcrepl UPLOAD.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-10-15 RMV-ST (Sept2025) revised UPLOAD.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-11-06 RMV-ST (Sept2025) krcrepl UPLOAD.pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-04-15 RMV-ST (Mar 2025) krcrepl UPLOAD.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-04-28 RMV-ST (Mar2025) UPLOAD.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-06-27 RMV-ST (Mar 2025) krcrepl UPLOAD.pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: 5 RMV-ST FY 2024-25 KRCREPL Report-Ann1-Ann2 UPLOAD.pdf | 26 Sep 2025 |
| Withdrawal Update Form 1File: 1 Architects Certificate 2025-04-15 RMV-ST (Mar 2025) krcrepl UPLOAD.pdf | 30 Jun 2025 |
| Withdrawal Update Form 2File: 2 Engineers Certificate 2025-04-28 RMV-ST (Mar2025) UPLOAD.pdf | 30 Jun 2025 |
| Withdrawal Update Form 3File: 3 CA Certificate 2025-06-27 RMV-ST (Mar 2025) krcrepl UPLOAD.pdf | 30 Jun 2025 |
| Form 2A (FY 2024-2025)File: 2A Engineers Certificate 2025-05-02 RMV-ST FY 2024-25 UPLOAD.pdf | 19 May 2025 |
| Details of encumbrancesFile: Encumbrances Encumbrance Litigation KRCREPL RMV 2025-04-14 UPLOAD.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RMV-ST Q4 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RMV-ST Q4 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RMV-ST Q4 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: RMV-ST Inventory 2025-03-31 UPLOAD.pdf | 16 Apr 2025 |
| Other - TechnicalFile: RMV-NT OC (Part 1) 2025-03-27 UPLOAD.pdf | 16 Apr 2025 |
| Proforma of Agreement for saleFile: AFS - RMV ST 2025-04-10 UPLOAD.pdf | 16 Apr 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: RMV-ST Grievance Cell and Complaints Status Q4FY25 UPLOAD.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RMV-ST Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RMV-ST Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RMV-ST Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RMV-ST Inventory 2024-12-31 UPLOAD.pdf | 17 Jan 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: RMV-ST - Status of Complaints Q3FY25 UPLOAD.pdf | 17 Jan 2025 |
| Proforma of Agreement for saleFile: AFS - RMV ST 2024-11-20 UPLOAD.pdf | 25 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architects Certificate 2024-10-23 RMV-ST (Sept 2024) krcrepl UPLOAD.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate 2024-11-04 RMV-ST (Sept 2024) krcrepl UPLOAD.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate 2024-10-28 RMV-ST (Sept 2024) UPLOAD.pdf | 6 Nov 2024 |
| Building plan approvalFile: RMV Amended Approval 2024-08-28 Letter and Proforma A Plans UPLOAD.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RMV-ST Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RMV-ST Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RMV-ST Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RMV CC Full 2024-10-11 UPLOAD.pdf | 18 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: RMV Amended Approval 2024-08-28 Letter and Proforma A Plans UPLOAD.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: RMV-ST Inventory 2024-09-30 UPLOAD.pdf | 18 Oct 2024 |
| Declaration about Commencement CertificateFile: RMV ST Declaration of CC 2024-10-18 UPLOAD.pdf | 18 Oct 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: RMV-ST - Status of Complaints Q2FY25 UPLOAD.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 RMV-ST FY 2023-24 KRCREPL Report-Annexure1-Annexure2 UPLOAD 2.pdf | 18 Oct 2024 |
| Form 5 (FY 2023-2024)File: 5 RMV-ST FY 2023-24 KRCREPL Report-Annexure1-Annexure2 UPLOAD.pdf | 29 Sep 2024 |
| Form 5 (FY 2021-2022)File: 5 RMV SOUTH Tower KRCPL FY 2021-22 Certificate UPLOAD.pdf | 25 Sep 2024 |
| Form 5 (FY 2022-2023)File: 5 RMV SOUTH Tower KRCPL FY 2022-23 Certificate-Report-Annexure UPLOAD.pdf | 25 Sep 2024 |
| Declaration about Commencement CertificateFile: RMV SOUTH Tower Declaration of CC 2024-07-19 UPLOAD.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RMV-ST Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RMV-ST Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: RMV-ST Inventory 2024-06-30 UPLOAD.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RMV-ST Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: RMV-ST - Status of Complaints Q1FY25 UPLOAD.pdf | 17 Jul 2024 |
| Copy of the legal title reportFile: RMV Supplmental Title Report 2024-02-28 UPLOAD.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Engineers Certificate 2024-04-16 RMV SOUTH Tower FY 2023-24 UPLOAD.pdf | 29 May 2024 |
| Details of encumbrancesFile: Encumbrances Encumbrance Litigation KRCREPL RMV 2024-04-18 UPLOAD.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: RMV-ST Inventory 2024-03-31 Revised UPLOAD.pdf | 18 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RMV-ST Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RMV-ST Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RMV-ST Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: RMV-ST Greivance Redressal Cell with Complaints Status Q4 FY24 UPLOAD.pdf | 17 Apr 2024 |
| Declaration in FORM BFile: Form B - KRCREPL (New Intending Promoter) for RMV SOUTH TOWER compressed UPLOAD.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architects Certificate 2024-03-14 RMV SOUTH Tower (Jan 2024) krcrepl1 UPLOAD.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate 2024-03-13 RMV SOUTH Tower (Jan 2024) UPLOAD.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate 2024-03-27 RMV SOUTH Tower (Jan 2024) krcrepl UPLOAD.pdf | 28 Mar 2024 |
| Other - LegalFile: NCLT Order dated 20Dec2023 Certified Copy on 04Jan2024 compressed UPLOAD.pdf | 28 Mar 2024 |
| Building plan approvalFile: RMV Amendment Letter and Plans Proforma A UPLOAD.pdf | 8 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: RMV Amendment Letter and Plans Proforma A UPLOAD.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architects Certificate 2024-01-19 RMV SOUTH Tower (Dec 2023) UPLOAD.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate 2024-01-17 RMV SOUTH Tower (Dec 2023) UPLOAD.pdf | 1 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate 2024-01-25 RMV SOUTH Tower (Dec 2023) UPLOAD.pdf | 1 Feb 2024 |
| Details of encumbrancesFile: Encumbrances Encumbrance Litigation KRCPL RMV 2024-01-17 UPLOAD.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: RMV South Inventory 2023-12-31 UPLOAD.pdf | 18 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations, which the RERA portal never shows together
- All 137 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAHEJA MODERN VIVAREA SOUTH TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHALAXMI
NATHANI HEIGHTS SALE
Nathani Parekh Constructions Private Limit
North Tower - Tower 3
Glider Buildcon Realtors
MONTESOUTH ZERMATT-1
SWAYAM REALTORS & TRADERS LLP
South Tower
Glider Buildcon Realtors
MINERVA
Lokhandwala Kataria Construction Private L
Lodha Bellevue
Lodha Developers Limited
Builder: K RAHEJA CORP REAL ESTATE PRIVATE LIMITED
K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if RAHEJA MODERN VIVAREA SOUTH TOWER is delayed beyond 30 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAHEJA MODERN VIVAREA SOUTH TOWER?
The registered promoter entity is K RAHEJA CORP REAL ESTATE PRIVATE LIMITED, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAHEJA MODERN VIVAREA SOUTH TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against RAHEJA MODERN VIVAREA SOUTH TOWER?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for RAHEJA MODERN VIVAREA SOUTH TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAHEJA MODERN VIVAREA SOUTH TOWER?
The professionals named in the filing: Architect: Barai Architects; Engineer: Mohan Jakati; Chartered Accountant: S N Doshi & Associates; Chartered Accountant: Kapadia Associates; Chartered Accountant: G.M. Kapadia & Co.; Chartered Accountant: G M Kapadia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAHEJA MODERN VIVAREA SOUTH TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback