Registered No litigation declared Commercial project

Raheja Exotica Downtown

By Raheja Universal (Pvt.) Ltd.

RG-MH-40782 · RERA P51800019930 · Last updated on MahaRERA portal: 15 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 425.00 crore secured on the land, in favour of HDFC Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 4 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
10 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Raheja Exotica Downtown is a Commercial project by Raheja Universal (Pvt.) Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800019930 on 13 Mar 2019. Possession is promised by 30 Apr 2027. The completion date has moved by 4 months from the original filing. 0 of the 10 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRaheja Exotica Downtown
  • TypeCommercial
  • Location
    • Madh Marve Road
    • Malad West
    • Borivali
    • Mumbai Suburban
    • 400061
  • Pincode400061
  • RERA no.P51800019930
  • ReraGenie IDRG-MH-40782

Builder

  • NameRaheja Universal (Pvt.) Ltd.
  • Entity typeCompany
  • DirectorASHISH SURESH RAHEJA
  • Other registrations16 more →
  • Completed2 of 17
  • Declared earlier projects13 →

Key dates

this monthRegisteredMar 2019First promiseDec 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Mar 2019
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed80 files

Current status

0%0 of 10 units booked
12.4%Work done, per cost certificate

Figures as on 15 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Raheja Exotica DowntownNA3201010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Raheja Exotica Downtown: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area988 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC Bank Limited
Secured amountRs 425.00 crore
CERSAI search filedYes
Declared on25 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1897.65
Proposed, not sanctioned1,898 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Manekji Wadia Building, Nanik Motwani Marg, Fort, Mumbai 400001
Estimated costRs 11.72 cr
Cost incurredRs 1.45 cr
Work done12.37%
BuildingWingEstimatedIncurred
Raheja Exotica DowntownNARs 10.11 crRs 97.00 lakh
-NARs 1.61 crRs 48.00 lakh

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMandviwala Qutub & Associates
ArchitectSunil Ambre & Associates
ArchitectKamal Khemani
EngineerRajkumar Dhar
EngineerMahesh Lalla
Chartered AccountantK N Gandhi and Co
Chartered AccountantBS Verida & Associates
Chartered AccountantSK Masand & Co
Chartered AccountantVishal Dagriya & Associates
Chartered AccountantDinesh Jain
Chartered AccountantVinit and Associates
PartnerRole in project
Raheja Universal (Pvt.) Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800019930/WarDec 2026 → Apr 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Downtown dt 30 06 2026.pdf15 Sep 2026
Withdrawal Update Form 2File: Form 2 Exotica Downtown 30 06 2026.pdf15 Sep 2026
Withdrawal Update Form 3File: Revised Form 3 Downtown 30062026.pdf15 Sep 2026
Layout approvalFile: Page 1 - Layout - 2023.pdf23 Jul 2026
Layout approvalFile: Page 1.pdf23 Jul 2026
Layout approvalFile: Page 2.pdf23 Jul 2026
Layout approvalFile: Page 3.pdf23 Jul 2026
Layout approvalFile: Page 4.pdf23 Jul 2026
Layout approvalFile: Page 5.pdf23 Jul 2026
Layout approvalFile: Page 6.pdf23 Jul 2026
Layout approvalFile: Page 7.pdf23 Jul 2026
Layout approvalFile: Page 8.pdf23 Jul 2026
Layout approvalFile: Page 9 - Highlighted Sanc and Perm BUA.pdf23 Jul 2026
Layout approvalFile: Page 9.pdf23 Jul 2026
Form 1File: Form 1 - June 2025 - Downtown.pdf26 Jun 2026
Form 2File: Form 2 - June 2025 - Downtown.pdf26 Jun 2026
Form 3File: Form 3 - June 2025 - Downtown.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - June 2025.pdf26 Jun 2026
Form 1File: Form 1 Septemeber 2025 - Downtown.pdf26 Jun 2026
Form 2File: Form 2 - Sep 2025 - Downtown.pdf26 Jun 2026
Form 3File: Form 3 - Sep 2025 - Downtown.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Sep 25.pdf26 Jun 2026
Form 1File: Form 1 December 2025 - Downtown.pdf26 Jun 2026
Form 2File: Form 2 - Dec 2025 - Downtown.pdf26 Jun 2026
Form 3File: Form 3 - Dec 2025 - Downtown.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dec 2025.pdf26 Jun 2026
Form 1File: Form 1 - Mar 2026 - Downtown.pdf26 Jun 2026
Form 2File: Form 2 - Mar 2026 - Downtown.pdf26 Jun 2026
Form 3File: Form 3 - Mar 2026 - Downtown.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mar 26.pdf26 Jun 2026
Form 2A (FY 2025-2026)File: Downtown.pdf18 Jun 2026
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Downtown 311224.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Downtown 300924.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Downtown 30032024.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cerificate.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Downtown Form 2 300923.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Downtown 310323.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Downtown 300623.pdf11 Jul 2023
Certificates of CA (Form 3)File: Form 3 Downtown 310323.pdf11 Jul 2023
Form 2AFile: RED_Form2A.pdf26 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RED_Form 5.pdf26 Dec 2022
Declaration about Commencement CertificateFile: RED_CC declaration.pdf22 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RED_ Form 2.pdf22 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RED_Form2A.pdf22 Dec 2022
Disclosure of sold/ booked inventoryFile: RED_ inventory details.pdf22 Dec 2022
Certificates of CA (Form 3)File: RED_Form 3.pdf22 Dec 2022
Building plan approvalFile: IOD.pdf7 Oct 2022
Layout approvalFile: Layout.pdf7 Oct 2022
Building plan approvalFile: Building Plan.pdf7 Oct 2022
Copy of the legal title reportFile: Title Certificate.pdf7 Oct 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf7 Oct 2022
Building Plan Approval (IOD)File: IOD.pdf7 Oct 2022
Building Plan Approval (IOD)File: Building Plan.pdf7 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3.PDF7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verona Form 1.pdf15 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verona Form 2 .pdf15 Aug 2021
Form 2AFile: Verona Form 2A.pdf15 Aug 2021
Certificates of CA (Form 3)File: Verona Form 3.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Vista.PDF6 Jul 2021
Certificates of CA (Form 3)File: vista 30042021-compressed.pdf8 Jun 2021
Form 2AFile: Vista- Form-2A.PDF31 Dec 2019
Form 2AFile: Vista-Form 2A.pdf30 Sep 2019
Annual Audit Report of Statutory CA (Form 5)File: CA Form 5 Vista -SK Masand.pdf28 Sep 2019
Form 2AFile: Form-2A Vista (25-06-2019).pdf1 Jul 2019
Building plan approvalFile: Vista IOD Plan_aa.pdf27 Feb 2019
Copy of the legal title reportFile: Title Certificate.pdf27 Feb 2019
Details of encumbrancesFile: No encumbrance letter.PDF27 Feb 2019
Building Plan Approval (IOD)File: Vista IOD Plan_aa.pdf27 Feb 2019
Declaration in FORM BFile: VISTA form B.PDF27 Feb 2019
Certificates of CA (Form 3)File: Rera CACertificate- Vista.pdf27 Feb 2019
Proforma of Allotment letterFile: AFS letter.PDF27 Feb 2019
Layout approvalFile: Exotica Layout.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Exotica Layout.pdf13 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: Vista Comm Certificate.PDF13 Feb 2019

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise6 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Raheja Lunaris-2PR1331012501769MIDC Industrial Area, Thane760Dec 2025OngoingDec 2031Not due yet
Tesla Building No 1 - Formerly known as EDISONJuinagar - Navi Mumbai259-CompletedApr 2018Apr 2018
Raheja Exotica - Sorento 5BMadh Island - Malad West165-CompletedOct 2017Apr 2017
Raheja Exotica - Sorento 5AMadh Island - Malad West211-CompletedOct 2017Apr 2017
Raheja RidgewoodGoregaon East - Mumbai278-CompletedMar 2017Late, Apr 2017
Raheja Reflections - OdysseyKandivali East Mumbai62-CompletedJan 2017Late, Apr 2017
Raheja Reflections - EternityKandivali East Mumbai229-CompletedMar 2016Mar 2016
Raheja Waterfront - PacificKulai - Mangalore292-CompletedDec 2014Late, Apr 2017
Raheja Waterfront - AtlanticKulai Manglore228-CompletedDec 2014Late, Mar 2016
Raheja Reflections - SerenityKandivali East256-CompletedMay 2014Late, Oct 2014
Raheja XionByculla - Mumbai12-CompletedApr 2013Apr 2013
Raheja Exotica - Amalfi Sicily and Capri - Phase - IIIMadh Island - Malad West311-CompletedApr 2013Late, Jun 2014
Raheja Reflection PlazaKandivali East1-CompletedFeb 2012Feb 2012

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raheja Exotica Downtown on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad West6,700+ in Mumbai Suburban

Builder: Raheja Universal (Pvt.) Ltd.

Raheja Universal (Pvt.) Ltd. has 17 registrations on MahaRERA, including Raheja Imperia - I and Raheja Exotica Verona. Its filings disclose 13 earlier MahaRERA projects: declares 6 of 12 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Raheja Exotica Downtown is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raheja Exotica Downtown?

The registered promoter entity is Raheja Universal (Pvt.) Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raheja Exotica Downtown?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raheja Exotica Downtown?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raheja Exotica Downtown?

The professionals named in the filing: Architect: Mandviwala Qutub & Associates; Architect: Sunil Ambre & Associates; Architect: Kamal Khemani; Engineer: Rajkumar Dhar; Engineer: Mahesh Lalla; Chartered Accountant: K N Gandhi and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raheja Exotica Downtown?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raheja Exotica Downtown. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raheja Exotica Downtown to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.