Raheja Exotica Siena
By Raheja Universal (Pvt.) Ltd.
RG-MH-71369 · RERA P51800046921 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 425.00 crore secured on the land, in favour of HDFC Bank Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Raheja Exotica Siena is a Residential / Group Housing project by Raheja Universal (Pvt.) Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046921 on 20 Sep 2022. Possession is promised by 31 Dec 2028. 393 of the 394 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameRaheja Exotica Siena
- TypeResidential / Group Housing
- Location
- Madh Marve Road
- Malad
- Borivali
- Mumbai Suburban
- 400061
- Pincode400061
- RERA no.P51800046921
- ReraGenie IDRG-MH-71369
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Raheja Exotica Siena | NA | 30 | 30 | 394 | 0 | 394 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.
Raheja Exotica Siena: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Raheja Exotica Siena | NA | Rs 120.38 cr | Rs 49.54 cr |
| - | NA | Rs 33.17 cr | Rs 24.77 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kamal Khemani |
| Engineer | Mahesh Lalla |
| Chartered Accountant | Dinesh Jain |
| Chartered Accountant | Vinit & Associates |
| Chartered Accountant | K N Gandhi & Co |
| Partner | Role in project |
|---|---|
| Raheja Universal (Pvt.) Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Exotica Siena dt 30 06 2026.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: Siena 30 06 2026.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Siena 30 06 2026.pdf | 14 Jul 2026 |
| Commencement certificateFile: Full CC Bldg no 9B Sieana (100326).pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Siena 300625.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Siena 300925.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Siena 300925.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Siena 300925.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Exotica Siena.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Siena Form 2 300625.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Siena Form 2 300625.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Raheja Exotica Siena Form2 31 12 2025.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Raheja Exotica Siena Form2 31 12 2025.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Siena_31032026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_ Siena_ 30062025.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_ Siena_ 30092025.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_ Siena_ 30092025.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Form3 Exot Siena 31122025 12012026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Form3 Exot Siena 31122025 12012026.pdf | 19 Jun 2026 |
| Form 2A (FY 2025-2026)File: Siena.pdf | 11 Jun 2026 |
| Other - FinanceFile: Declaration stating reason for transfer of bank account .pdf | 17 Jun 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 10 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Siena Sold unsold inventory details 311224.pdf | 18 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Siena (23-24).pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena 311224.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Siena (23-24).pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 311224.pdf | 6 Feb 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Siena Declaration about all RERA Designated Bank Accounts (Format A) .pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 311224.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena 300924.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Siena Sold unsold inventory details 300624.pdf | 2 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena 30062024.pdf | 1 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 30062024.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena 31032024.pdf | 17 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Siena sold unsold inventory 31032024.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 30032024.pdf | 29 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Siena (22-23).pdf | 9 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Siena Sold unsold inventory details 311223.pdf | 2 Feb 2024 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 23 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Cerificate.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 301223.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 311223.PDF | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siena Form 1 300923.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Siena Form 2 300923.pdf | 12 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Siena Sold unsold inventory details 300923.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena 300923.pdf | 12 Oct 2023 |
| Building plan approvalFile: IOD Plan 9B.pdf | 21 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Plan 9B.pdf | 21 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 040723.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Siena Sold unsold inventory details 300623.pdf | 13 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 300623.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 300623.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 310323.pdf | 25 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 310323.pdf | 25 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siena 311222.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siena 311222.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siena Dec 2022.pdf | 14 Feb 2023 |
| Other - TechnicalFile: Proposed Plan.pdf | 21 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: financial encumbrances.pdf | 19 Sep 2022 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 19 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siena form 3.pdf | 19 Sep 2022 |
| Proforma of Allotment letterFile: Letter of Allotment.PDF | 15 Sep 2022 |
| Proforma of Allotment letterFile: Siena AFS.pdf | 15 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: AFS deviation report.pdf | 15 Sep 2022 |
| Building plan approvalFile: Building Approval.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Approval.pdf | 14 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 14 Sep 2022 |
| Declaration about Commencement CertificateFile: CC declaration.PDF | 14 Sep 2022 |
| Layout approvalFile: Siena Dual Layout.pdf | 13 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: Siena Dual Layout.pdf | 13 Sep 2022 |
| Copy of the legal title reportFile: Siena Title Certificate.pdf | 9 Sep 2022 |
| Building plan approvalFile: IOD.pdf | 1 Sep 2022 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Letter.pdf | 1 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 1 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siena Form 1.pdf | 1 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Siena LOA deviation report.pdf | 1 Sep 2022 |
| PAN CardFile: PAN card.PDF | 25 Aug 2022 |
| Declaration in FORM BFile: Siena Form B.PDF | 25 Aug 2022 |
| CERSAI detailsFile: Siena CERSAI Report.pdf | 25 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank Account Declaration.pdf | 25 Aug 2022 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Raheja Lunaris-2PR1331012501769 | MIDC Industrial Area, Thane | 760 | Dec 2025 | Ongoing | Dec 2031 | Not due yet |
| Tesla Building No 1 - Formerly known as EDISON | Juinagar - Navi Mumbai | 259 | - | Completed | Apr 2018 | Apr 2018 |
| Raheja Exotica - Sorento 5B | Madh Island - Malad West | 165 | - | Completed | Oct 2017 | Apr 2017 |
| Raheja Exotica - Sorento 5A | Madh Island - Malad West | 211 | - | Completed | Oct 2017 | Apr 2017 |
| Raheja Ridgewood | Goregaon East - Mumbai | 278 | - | Completed | Mar 2017 | Late, Apr 2017 |
| Raheja Reflections - Odyssey | Kandivali East Mumbai | 62 | - | Completed | Jan 2017 | Late, Apr 2017 |
| Raheja Reflections - Eternity | Kandivali East Mumbai | 229 | - | Completed | Mar 2016 | Mar 2016 |
| Raheja Waterfront - Pacific | Kulai - Mangalore | 292 | - | Completed | Dec 2014 | Late, Apr 2017 |
| Raheja Waterfront - Atlantic | Kulai Manglore | 228 | - | Completed | Dec 2014 | Late, Mar 2016 |
| Raheja Reflections - Serenity | Kandivali East | 256 | - | Completed | May 2014 | Late, Oct 2014 |
| Raheja Xion | Byculla - Mumbai | 12 | - | Completed | Apr 2013 | Apr 2013 |
| Raheja Exotica - Amalfi Sicily and Capri - Phase - III | Madh Island - Malad West | 311 | - | Completed | Apr 2013 | Late, Jun 2014 |
| Raheja Reflection Plaza | Kandivali East | 1 | - | Completed | Feb 2012 | Feb 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 16 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Raheja Exotica Siena on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Malad6,700+ in Mumbai Suburban
Raheja Exotica Cyprus
Raheja Universal (Pvt.) Ltd.
AMRUT TARA
Meghvarnam Realty Private Limited
ocean view
STAR CONSTRUCTION
Lotus Celestia
VALUEMART REAL ESTATE PRIVATE LIMITED
Godrej Skyshore
Godrej Properties Limited
Raheja Exotica Verona
Raheja Universal (Pvt.) Ltd.
See every Mumbai Suburban project, with the district possession charts
Builder: Raheja Universal (Pvt.) Ltd.
Raheja Universal (Pvt.) Ltd. has 17 registrations on MahaRERA, including Raheja Imperia - I and Raheja Exotica Verona. Its filings disclose 13 earlier MahaRERA projects: declares 6 of 12 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Raheja Exotica Siena is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Raheja Exotica Siena?
The registered promoter entity is Raheja Universal (Pvt.) Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Raheja Exotica Siena?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Raheja Exotica Siena?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Raheja Exotica Siena?
The professionals named in the filing: Architect: Kamal Khemani; Engineer: Mahesh Lalla; Chartered Accountant: Dinesh Jain; Chartered Accountant: Vinit & Associates; Chartered Accountant: K N Gandhi & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Raheja Exotica Siena?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback