Home / Browse projects / Mumbai Suburban, Maharashtra / AMRUT TARA
AMRUT TARA
By Meghvarnam Realty Private Limited
RG-MH-95388 · RERA P51800009896 · Last updated on MahaRERA portal: 11 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Completion date moved by 87 months
- 3 extensions taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMRUT TARA is a Residential / Group Housing project by Meghvarnam Realty Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009896 on 22 Aug 2017. Possession is promised by 30 Mar 2027. The completion date has moved by 87 months from the original filing. 198 of the 202 units on this registration are recorded sold or booked.
At a glance
Project
- NameAMRUT TARA
- TypeResidential / Group Housing
- Location
- Andheri
- Mumbai Suburban
- 400061
- Pincode400061
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009896
- ReraGenie IDRG-MH-95388
Builder
- NameMeghvarnam Realty Private Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- DirectorsHarish Patel, Rajesh Patel
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Mar 2027
- Revised completionRevised to 30 Mar 2027 (originally 31 Dec 2019)
- Buildings3 building records
- Documents filed218 files
Current status
Figures as on 11 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMRUT TARA A | NA | 27 | 21 | 68 | 0 | 68 |
| AMRUT TARA B | NA | 27 | 21 | 66 | 0 | 66 |
| AMRUT TARA C | NA | 27 | 21 | 68 | 0 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 11 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
AMRUT TARA ANot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
AMRUT TARA BNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
AMRUT TARA CNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 11 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed255
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| AMRUT TARA A | 85 | 85 |
| AMRUT TARA B | 85 | 85 |
| AMRUT TARA C | 85 | 85 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 23.38 cr | Rs 23.38 cr |
| AMRUT TARA A | NA | Rs 18.56 cr | Rs 18.56 cr |
| AMRUT TARA B | NA | Rs 18.56 cr | Rs 18.56 cr |
| AMRUT TARA C | NA | Rs 18.56 cr | Rs 18.56 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SP ASSOCIATES |
| Architect | Vilas Desai & Associate |
| Architect | Vini Desai |
| Engineer | K C Shah Consultants |
| Engineer | MEHUL KAIVANT SHAH |
| Chartered Accountant | B B Jain and Associates |
| Chartered Accountant | Chirag Sarvaiya And company |
| Chartered Accountant | Chirag Bharat Sarvaiya |
| Chartered Accountant | Bansilal B Jain |
| Partner | Role in project |
|---|---|
| Meghvarnam Realty Private Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLiquidity Management Issue
Reason as filed by the promoterWe have already uploaded the Full Occupancy Certificate dated 28th April 2025 on the MahaRERA portal for your kind reference. However, the project is currently reflecting under the category of “Lapsed Projects.” In this regard, we request you to kindly grant an extension upto 30th June 2026 for the above-mentioned project. The purpose of seeking this extension is to complete necessary corrections and updates, including alignment of BUA, Units, FSI, and other project details with the approved Full Occupancy Certificate plans
Reason as filed by the promoterNA
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 55 of 2012/2012 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 May 2025
Documents filed218
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 218 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1--June--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Form-1--June--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Form-1--June--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Form-1--June--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 1File: Form-1--June--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 --June-.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 --June-.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 --June-.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 --June-.pdf | 11 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 --June-.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Final--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Final--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Final--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Final--.pdf | 11 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Final--.pdf | 11 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A (5).pdf | 11 Sep 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (5).pdf | 11 Sep 2026 |
| Form 1File: Form-1- Mar-25.pdf | 23 Jul 2025 |
| Form 2File: Form-2- Mar-25.pdf | 23 Jul 2025 |
| Form 3File: Form -3 Mar-25.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 2025-05-06 -Full OC certificate- Amrut Tara.pdf | 23 Jul 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OC of Amrut Tara Rehab - ABC -Dated 06 05 2025.pdf | 9 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 29 Nov 2024 |
| Declaration in FORM BFile: 1277_001.pdf | 11 Oct 2024 |
| Declaration in FORM BFile: 1277_001.pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2019.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2020.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2021.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2022.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2023.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2024.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2019.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2020.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2021.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2022.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2023.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: 31 Mar 2024.pdf | 7 Oct 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 23.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 23.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 23.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 23.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 24.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 24.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 19.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 20.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 21.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 22.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 23.pdf | 1 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 24.pdf | 1 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: March 19.pdf | 1 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 218 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AMRUT TARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 72 registered projects within 2 km.
Raheja Exotica Siena
Raheja Universal (Pvt.) Ltd.
Raheja Exotica Cyprus
Raheja Universal (Pvt.) Ltd.
ocean view
STAR CONSTRUCTION
Lotus Celestia
VALUEMART REAL ESTATE PRIVATE LIMITED
Godrej Skyshore
Godrej Properties Limited
Raheja Exotica Verona
Raheja Universal (Pvt.) Ltd.
See every Mumbai Suburban project, with the district possession charts
Builder: Meghvarnam Realty Private Limited
Meghvarnam Realty Private Limited has 1 registration on MahaRERA, including AMRUT TARA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if AMRUT TARA is delayed beyond 30 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMRUT TARA?
The registered promoter entity is Meghvarnam Realty Private Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMRUT TARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMRUT TARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMRUT TARA?
The professionals named in the filing: Architect: SP ASSOCIATES; Architect: Vilas Desai & Associate; Architect: Vini Desai; Engineer: K C Shah Consultants; Engineer: MEHUL KAIVANT SHAH; Chartered Accountant: B B Jain and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMRUT TARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback