ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Puraniks Capitol

Registered No litigation declared Others project

Puraniks Capitol

By Puranik Builders Limited

RG-MH-51598 · RERA P51700009498 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2036Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Puraniks Capitol is a Others project by Puranik Builders Limited in Thane, Maharashtra, registered with MahaRERA as P51700009498 on 22 Aug 2017. Possession is promised by 30 Dec 2036.

At a glance

Project

  • NamePuraniks Capitol
  • TypeOthers
  • Location
    • GHODBUNDER ROAD
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009498
  • ReraGenie IDRG-MH-51598

Builder

  • NamePuranik Builders Limited
  • Entity typeCompany
  • CINU99999MH1990PLC056451
  • GSTIN27AABCP0109R1Z9
  • Managing DirectorShailesh Gopal Puranik
  • DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
  • Other registrations19 more →
  • Completed5 of 20
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017PromisedDec 2036

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2036
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Puraniks CapitolNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Puraniks Capitol: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered7

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,760 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shah Dedhia EnterprisesThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI1020.96
Proposed, not sanctioned221 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVedant Commercial Complex, Vartak Nagar, Thane

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectScapes
ArchitectVastushilpa Associates
EngineerSagar Abnave
EngineerKedar Yernalkar
Chartered AccountantVMD and Company
Chartered AccountantHDO & Associates
Chartered AccountantVMD & Co
PartnerRole in project
Puranik Builders Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2036

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Fomr 1.pdf24 Apr 2026
Form 2File: Form 2.pdf24 Apr 2026
Form 3File: Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sales data.pdf24 Apr 2026
Form 1File: Form 1.pdf24 Apr 2026
Form 2File: Fprm 2.pdf24 Apr 2026
Form 3File: Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Puranik Capitol July-Sep 2025.pdf24 Apr 2026
Form 1File: 2025-12-31 Architects Certificate FORM-1.pdf24 Apr 2026
Form 2File: Form 2.pdf24 Apr 2026
Form 3File: Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Puranik Capitol Oct-Dec 2025.pdf24 Apr 2026
Form 1File: 2026-03-31 Architects Certificate FORM-1.pdf24 Apr 2026
Form 2File: Form 2 - 31032026.pdf24 Apr 2026
Form 3File: Form 3- 31032026.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Puranik Capitol A2.pdf24 Apr 2026
Form 5 (FY 2024-2025)File: Rera Form 5 - Capitol - sign.pdf17 Sep 2025
Certificates of CA (Form 3)File: CA_Cerf Capitol.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 Engineers Certificate Capitol 31122022.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Form 2 Engineers Certificate Capitol 31122024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Form 2 Engineers Certificate Capitol 30092024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineers Certificate Capitol 30062024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 Engineers Certificate Capitol 31032024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 Engineers Certificate Capitol 31122023.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 Engineers Certificate Capitol 30092023.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 Engineers Certificate Capitol 30062023.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 Engineers Certificate Capitol 31032023.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Engineers Certificate Capitol 30092022.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Engineers Certificate Capitol 30062022.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engineers Certificate Capitol 31032022.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 Engineers Certificate Capitol 31122021.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024 Architects Certificate FORM-1 Capitol.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Capitol.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PBL CAPITOL - 31122024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PBL - Capitol, 31-03-24.pdf23 Jan 2025
Certificates of CA (Form 3)File: CA_Cerf Capitol Till_30092024.pdf23 Jan 2025
Certificates of CA (Form 3)File: CA_Cerf Capitol Till_31122024_compressed.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PURANIKS CAPITOL_Singed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PURANIKS CAPITOL_Singed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Capitol.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Capitol Year 23-24.pdf10 Jul 2024
Certificates of CA (Form 3)File: Puranik Capitol.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-03-31 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-06-30 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-09-30 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-12-31 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-01-02 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-03-31 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-06-30 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-09-30 Architects Certificate FORM-1.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-12-31 Architects Certificate FORM-1.pdf6 Feb 2024
Certificates of CA (Form 3)File: Puranik Capitol.pdf6 Feb 2024
Certificates of CA (Form 3)File: Puranik capitol 99.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Puranik Capitol - signed final.pdf30 Sep 2023
Certificates of CA (Form 3)File: Capitol March 23.pdf11 Sep 2023
Certificates of CA (Form 3)File: Capitol June 23.pdf11 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Capitol.pdf8 Aug 2023
Certificates of CA (Form 3)File: Capitol Dec 2021.pdf25 Mar 2023
Certificates of CA (Form 3)File: Capitol March 2022.pdf25 Mar 2023
Certificates of CA (Form 3)File: Capitol June 2022.pdf25 Mar 2023
Certificates of CA (Form 3)File: Capitol Sept 2022.pdf25 Mar 2023
Certificates of CA (Form 3)File: Capitol Dec 2022.pdf25 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY2017-18.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY2018-19.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY2019-20.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Capitol.pdf26 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Capitol.pdf1 Oct 2021
Layout approvalFile: 30-low-40-50-50-CAPITOL MUNICIPALE LAYOUT PLAN1.pdf31 Jul 2017
Building plan approvalFile: SANCTION.pdf31 Jul 2017
Copy of the legal title reportFile: Title Report Capitol.PDF31 Jul 2017
Copy of the legal title reportFile: Addendum Title Report.PDF31 Jul 2017
Details of encumbrancesFile: Details of Encumbrance capitol.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 30-low-40-50-50-CAPITOL MUNICIPALE LAYOUT PLAN1.pdf31 Jul 2017
Building Plan Approval (IOD)File: SANCTION.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: SANCTION.pdf31 Jul 2017
Declaration in FORM BFile: Declaration - Promoter.PDF31 Jul 2017
Certificates of CA (Form 3)File: CA capitol.PDF31 Jul 2017
Proforma of Allotment letterFile: Allotment letter -Sd.pdf31 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hometown Part CKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2016Late, Apr 2017
Aldea AnnexoAldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045129CompletedDec 2016Late, Apr 2017
Hometown Part BKasarvadavali Ghodbunder Road Thane west 400615159CompletedAug 2014Late, Jan 2015
Hometown Part AKasarvadavali Ghodbunder Road Thane west 400615176CompletedJun 2013Late, Nov 2013
Puranik City Part AKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2012Late, Feb 2013
Puranik City Part BKasarvadavali Ghodbunder Road Thane west 40061580CompletedDec 2011Late, Apr 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Puraniks Capitol on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane (M Corp.)7,600+ in Thane

2 kmPuraniks CapitolCompleted 76Lapsed / revoked 26Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 152 registered projects within 2 km.

Builder: Puranik Builders Limited

Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Puraniks Capitol is delayed beyond 30 Dec 2036?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Puraniks Capitol?

The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Puraniks Capitol?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Puraniks Capitol?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Puraniks Capitol?

The professionals named in the filing: Architect: Scapes; Architect: Vastushilpa Associates; Engineer: Sagar Abnave; Engineer: Kedar Yernalkar; Chartered Accountant: VMD and Company; Chartered Accountant: HDO & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Puraniks Capitol?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Puraniks Capitol. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Puraniks Capitol to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.