Provident Palmvista B1
RG-MH-28330 · RERA P51700025841 · Last updated on MahaRERA portal: 5 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 61.67 crore secured on the land, in favour of Indusind Bank Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Provident Palmvista B1 is a Residential / Group Housing project by Provident Housing Limited in Thane, Maharashtra, registered with MahaRERA as P51700025841 on 20 Jul 2020. Possession is promised by 30 Jun 2028. 191 of the 309 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameProvident Palmvista B1
- TypeResidential / Group Housing
- Location
- Kalyan-Shilphata Road
- -
- Thane (M Corp.)
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700025841
- ReraGenie IDRG-MH-28330
Builder
- NameProvident Housing Limited
- Entity typeCompany
- CINU45200KA2008PLC048273
- GSTIN27AAECP8877D1Z0
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsAshish Puravankara, Nani Choksey
- Other registrations14 more →
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jul 2020
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 5 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Palmvista B1 | NA | 32 | 30 | 295 | 14 | 309 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 23%.
Palmvista B1: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 23% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Glory Township LLP | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anil Hassanand Jagwani |
| Engineer | Ten Folds |
| Chartered Accountant | M Padmanabha Bhat |
| Chartered Accountant | V D S R & CO LLP |
| Partner | Role in project |
|---|---|
| Provident Housing Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 B1.pdf | 5 May 2026 |
| Form 2File: Form 2 B1.pdf | 5 May 2026 |
| Form 3File: Form 3 B1_compressed.pdf | 5 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Q4 Sold and Unsold.pdf | 5 May 2026 |
| Form 1File: B1 RERA Form 1 31 12 2026.pdf | 28 Apr 2026 |
| Form 2File: FORM-2 EC PALMVISTA TOWER B1 2025 26 Q3.pdf | 28 Apr 2026 |
| Form 3File: Palmvista RERA Wing B1 -Dec 25.pdf | 28 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: B1 sold and Unsold.pdf | 28 Apr 2026 |
| Form 1File: Architect Palmvista - Wing B1 30 09 2025.pdf | 9 Apr 2026 |
| Form 2File: FORM-2 EC PALMVISTA B1 Q1.pdf | 9 Apr 2026 |
| Form 3File: Palmvista Wing B1 RERA -Sep 25_compressed.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold.pdf | 9 Apr 2026 |
| Form 1File: B1 RERA Form 1 30 06 2025.pdf | 4 Oct 2025 |
| Form 2File: FORM-2, EC_PALMVISTA_TOWER B1_2025-26_Q1.pdf | 4 Oct 2025 |
| Form 3File: Final PALMVISTA RERA FORM 3 B1_compressed.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: B1 sold.pdf | 4 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing B1 31 12 2024.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PALMVISTA Form 3- B1.pdf | 17 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_PALMVISTA_TOWER B1_2024-25_Q3.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 for Palm Vista B1.pdf | 24 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista B1 June 24 sd.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palmvista Architect Certificate_March 2024 Q4_compressed_compressed.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 for Building B1.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 for Palm Vista B1.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista b1sd.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista B1 June 24 sd.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_PALMVISTA_TOWER B1_2023-24_Q4.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_PALMVISTA_TOWER B1_2024-25_Q1.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Provident Palmvista B1 Form 5.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palm Vista B1_compressed.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Progress certificate Palmvista Form 1 for Building B1.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Progress ecrtificate Palmvista B1 Q3 -2022.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista_B1_Form-3_Sep-22_sd.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista_B1_Form-3_Mar-23_sd .pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palmvista B1_Form-3 _jun22_Sd.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: B1_compressed.pdf | 3 Apr 2023 |
| Details of encumbrancesFile: Mortgage palmvista Part 1.pdf | 19 Jan 2023 |
| Details of encumbrancesFile: Mortgage palmvista part 2.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5- Provident Palmvista B1 FY 2020-21.pdf | 16 Dec 2022 |
| Declaration about Commencement CertificateFile: CC Declaration B1.pdf | 7 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 B1.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 B1.pdf | 7 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- Provident Palmvista B1 FY 2021-22.pdf | 7 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: B1 Form 2A.pdf | 25 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: B1 Form 2A.pdf | 25 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: B1 Form 2A.pdf | 25 Nov 2022 |
| CERSAI detailsFile: B1 Cersai.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q1 2021 B1.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q2 2021 B1.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q3 2021 B1.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q4 2021 B1.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q1 2022 B1.pdf | 25 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Q2 2022 B1.pdf | 25 Nov 2022 |
| Building plan approvalFile: MYSCAN_20220214_0001_compressed.pdf | 30 Aug 2022 |
| Layout approvalFile: MYSCAN_20220214_0001_compressed.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20220214_0001_compressed.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220214_0001_compressed.pdf | 30 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 30 Aug 2022 |
| Other - TechnicalFile: Proposed LAYOUT Plan_compressed.pdf | 30 Aug 2022 |
| Declaration in FORM BFile: Provident Palmvista -Affidavit.pdf | 18 Jul 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Provident Palmvista B1.pdf | 18 Jul 2020 |
| Copy of the legal title reportFile: LSR.pdf | 17 Jul 2020 |
| Details of encumbrancesFile: Nil Encumbrance_0001.pdf | 15 Jul 2020 |
| Proforma of Allotment letterFile: PLMV_Allotment Letter B1.pdf | 15 Jul 2020 |
| Proforma of Allotment letterFile: PPV ATS v0 (Draft).pdf | 15 Jul 2020 |
| Layout approvalFile: Site Plan.pdf | 14 Jul 2020 |
| Building plan approvalFile: Site Plan.pdf | 14 Jul 2020 |
| PAN CardFile: PHL PAN.PDF | 14 Jul 2020 |
| Copy of Layout Approval (in case of layout)File: Site Plan.pdf | 14 Jul 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Site Plan.pdf | 14 Jul 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Certificate.pdf | 14 Jul 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| The Tree by Provident | Ward No 72 2nd Main Road Syndicate Bank Layout Village Herohalli Gollarapalya Hosahalli Bengaluru Karnataka 560091 | 560 | Completed | Jun 2017 | Dec 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Provident Palmvista B1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -7,600+ in Thane
Filed coordinates, straight-line distance. 99 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Provident Housing Limited
Provident Housing Limited has 15 registrations on MahaRERA, including Provident Kenvista T1 and Provident Kenvista T2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Provident Palmvista B1 is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Provident Palmvista B1?
The registered promoter entity is Provident Housing Limited, a company as per the filing. Its CIN U45200KA2008PLC048273 and GSTIN 27AAECP8877D1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Provident Palmvista B1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Provident Palmvista B1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Provident Palmvista B1?
The professionals named in the filing: Architect: Anil Hassanand Jagwani; Engineer: Ten Folds; Chartered Accountant: M Padmanabha Bhat; Chartered Accountant: V D S R & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Provident Palmvista B1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback