Home / Browse projects / Mumbai Suburban, Maharashtra / Prestige Trade Centre- Offices

Registered Litigation declared Commercial project

Prestige Trade Centre- Offices

By PRESTIGE MULUND REALTY PRIVATE LIMITED

RG-MH-06267 · RERA P51800053360 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 30 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

Prestige Trade Centre- Offices is a Commercial project by PRESTIGE MULUND REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053360 on 27 Oct 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NamePrestige Trade Centre- Offices
  • TypeCommercial
  • Location
    • Adishakti Marg Near Veena Nagar off LBS Marg
    • T Ward
    • Mulund West
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053360
  • ReraGenie IDRG-MH-06267

Builder

  • NamePRESTIGE MULUND REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2016PTC287566
  • GSTIN27AAOCA9048H2Z7
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsZYAD NOAMAN, UZMA IRFAN
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed146 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA540000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

WING B: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
othersYes0%

Parking filed1199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,199
Closed/Covered1,199

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,113 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI88416.49
Proposed, not sanctioned88,416 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor, Krishi Bhavan, Hudson Circle, Bangalore, Karnataka - 560001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLegal Entity
EngineerSHREE VENKATADRI ASSOCIATES
Chartered AccountantBHUVANA BHAT & ASSOCIATES
Chartered AccountantMUNIYAL PADMANABHA BHAT
PartnerRole in project
PRESTIGE MULUND REALTY PRIVATE LIMITED-

Litigation declared30

CaseCourtStatus
1448/2005Bombay High CourtOngoing
1161/2009Bombay High CourtOngoing
1138/2011Bombay High CourtOngoing
16078/2014Bombay High CourtOngoing
6441/2014Revenue MinisterDismissed
1821/2023Supreme Court of IndiaDismissed
6328/2021Supreme Court of IndiaPending
105/2020Bombay High CourtOngoing
647/2021National Company Law TribunalOngoing
440/2021National Company Law TribunalPending
1123/2021National Company Law TribunalPending
227/2021National Company Law Appellate TribunalPending
2922/2023National Company Law TribunalOngoing
3947/2023National Company Law TribunalOngoing
2194/2018National Consumer Redressal CommissionOngoing
1069/2016Metropolitan MagistrateOngoing
1070/2016Metropolitan MagistrateOngoing
1071/2016Metropolitan MagistrateOngoing
1072/2016Metropolitan MagistrateOngoing
459/2017Bombay High CourtPending
675/2019Bombay High CourtPending
CC/1144/2016State Consumer Dispute Redressal CommissionPending
CC/614/2017State Consumer Dispute Redressal CommissionPending
SW/110/2016Metropolitan MagistratePending
SW/121/2016Metropolitan MagistratePending
SW/131/2016Metropolitan MagistrateOngoing
SW/111/2016Metropolitan MagistrateOngoing
SW/122/2016Metropolitan MagistrateOngoing
SW/118/2016Metropolitan MagistratePending
2160/2016Metropolitan MagistrateDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Qtr 4_Form 1_PTC Office.pdf22 Apr 2026
Form 2File: Qtr 4_Form 2_PTC Office.pdf22 Apr 2026
Form 3File: Q4_Form 3_PTC.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Q4_PTC_Sold_Unsold.pdf22 Apr 2026
Form 1File: Q3 Form 1.pdf23 Jan 2026
Form 2File: Q3 Form 2.pdf23 Jan 2026
Form 3File: Q3 Form 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Q3 Sold Unsold.pdf23 Jan 2026
Form 1File: Form 1_PTC Office.pdf23 Jan 2026
Form 2File: Form 2_PTC Office.pdf23 Jan 2026
Form 3File: PTC-JUN-25.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Q1 Sold Unsold.pdf23 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prestige Trade Centre.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PTC Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PTC Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PTC Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold PTC Q4.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PTC Form 1 Q3.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PTC Form 3 Q3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PTC Form 2 Q3.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: PTC Sold Unsold Q3.pdf29 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration PTC- offices.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PTC Offices Form 3 Q2.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: PTC Offices Sold Unsold Q2.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A PTC offices.pdf20 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Prestige Trade Centre Offices.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PTC Form 1 Q2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PTC Form 2 Q2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PTC Form 2 Q2.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PTC- Offices Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PTCoffices - Form 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PTC offices - Form 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: PTC Offices Sold unsold.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - PTC - Q4.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - PTC - Q4.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Q4 - PTC- Offices FY 23-24.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PTC Mar 24.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: PTC Sold Unsold Q3.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Prestige Trade Center Offices.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Prestige Ocean Tower.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Prestige trade center.pdf3 Apr 2024
Proforma of Allotment letterFile: Annexure N PDF.pdf7 Nov 2023
Proforma of Agreement for saleFile: Annexure N PDF.pdf7 Nov 2023
Details of encumbrances concerned to FinanceFile: 231018_NEC_Litigation.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: 231018_NEC_Litigation.pdf9 Oct 2023
Other - FinanceFile: 231006_CERSAI Declaration.pdf9 Oct 2023
Other - LegalFile: LC Suit No.pdf6 Oct 2023
Other - LegalFile: Order dt 23 December 2022 NCLAT COMPANY PETITION NO 355 OF 2021.pdf6 Oct 2023
Other - LegalFile: Partnership Deed- 20-22.pdf6 Oct 2023
Other - LegalFile: Indenture of Conveyance - Avdhut - BDR-7 - 1417 Of 2007 (1)_compressed-1-45.pdf6 Oct 2023
Other - LegalFile: Indenture of Conveyance - Avdhut - BDR-7 - 1417 Of 2007 (1)_compressed-46-90.pdf6 Oct 2023
Other - LegalFile: Indenture of Conveyance - Avdhut - BDR-7 - 1417 Of 2007 (1)_compressed-91-131.pdf6 Oct 2023
Other - TechnicalFile: 3 Other - Legal.pdf30 Sep 2023
Other - TechnicalFile: Disclosure of Interest_AnnexureA.pdf28 Sep 2023
Other - TechnicalFile: ilovepdf_merged (17).pdf27 Sep 2023
Copy of the legal title reportFile: Disclaimer Legal Title Report.pdf6 Sep 2023
Other - TechnicalFile: Form B Disclaimer.pdf6 Sep 2023
Building plan approvalFile: 1_02.pdf28 Aug 2023
Building plan approvalFile: 1_03.pdf28 Aug 2023
Building plan approvalFile: 1_04.pdf28 Aug 2023
Building plan approvalFile: 1_05.pdf28 Aug 2023
Building plan approvalFile: 1_06.pdf28 Aug 2023
Building plan approvalFile: 1_07.pdf28 Aug 2023
Building plan approvalFile: 1_08.pdf28 Aug 2023
Building plan approvalFile: 1_09.pdf28 Aug 2023
Building plan approvalFile: 1_10.pdf28 Aug 2023
Building plan approvalFile: 1_11.pdf28 Aug 2023
Building plan approvalFile: 1_12.pdf28 Aug 2023
Building plan approvalFile: 1_13.pdf28 Aug 2023
Building plan approvalFile: 1_14.pdf28 Aug 2023
Building plan approvalFile: 1_15.pdf28 Aug 2023
Building plan approvalFile: 1_16.pdf28 Aug 2023
Building plan approvalFile: 1_17.pdf28 Aug 2023
Building plan approvalFile: 1_18.pdf28 Aug 2023
Building plan approvalFile: 1_19.pdf28 Aug 2023
Building plan approvalFile: 1_20.pdf28 Aug 2023
Building plan approvalFile: 1_21.pdf28 Aug 2023
Building plan approvalFile: 1_22.pdf28 Aug 2023
Building plan approvalFile: 1_23.pdf28 Aug 2023
Building plan approvalFile: 1_24.pdf28 Aug 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Forest Hills Ph 1 at The Prestige CityP51800077457Veena Nagar, Mulund (W), Mumbai Suburban663Aug 2024OngoingDec 2030Not due yet
PRESTIGE JASDAN CLASSICP51900031285BYCULLA, Mumbai City-Oct 2021CompletedDec 2025May 2025
SIESTAP51800005285MULUND WEST, Mumbai Suburban-Aug 2017CompletedJun 2025Registered original: Dec 2023Apr 2025
PRESTIGE BAGMANE TEMPLE BELLSSy No 54 55 56-1 56-2 56-3 56-4 57-2 Hosekerahalli Village Uttarahalli Hobli Bangalore South968-CompletedSep 2019Jun 2019
PRESTIGE DEJAVUKhata No 51-1 Promenade Road Coles Road Frazer Town Bangalore40-CompletedAug 2019Aug 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prestige Trade Centre- Offices on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmPrestige Trade Centre- OCompleted 69Lapsed / revoked 50Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: PRESTIGE MULUND REALTY PRIVATE LIMITED

PRESTIGE MULUND REALTY PRIVATE LIMITED has 6 registrations on MahaRERA, including SIESTA and Bellanza Phase 1 - Wing A, B, C at The Prestige City. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Prestige Trade Centre- Offices is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prestige Trade Centre- Offices?

The registered promoter entity is PRESTIGE MULUND REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2016PTC287566 and GSTIN 27AAOCA9048H2Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prestige Trade Centre- Offices?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prestige Trade Centre- Offices?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prestige Trade Centre- Offices?

The professionals named in the filing: Architect: Legal Entity; Engineer: SHREE VENKATADRI ASSOCIATES; Chartered Accountant: BHUVANA BHAT & ASSOCIATES; Chartered Accountant: MUNIYAL PADMANABHA BHAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prestige Trade Centre- Offices?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prestige Trade Centre- Offices. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prestige Trade Centre- Offices to a free account