Home / Browse projects / Mumbai Suburban, Maharashtra / Eternia Towers A to D
Eternia Towers A to D
By Oberoi Constructions Limited
RG-MH-20364 · RERA P51800006141 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 5 months past the filed date
- Litigation declared, 2 cases
- 11 complaints at MahaRERA
- Completion date moved by 41 months
- 2 extensions taken
- Rs 1,500.00 crore secured on the land, in favour of Multiple
Clear
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Eternia Towers A to D is a Residential / Group Housing project by Oberoi Constructions Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006141 on 14 Aug 2017. Possession was promised by 10 May 2026 and is now 5 months past that date. The completion date has moved by 41 months from the original filing. 910 of the 1,312 units on this registration are recorded sold or booked, and 44 of 44 construction stages are filed complete. 11 complaints are on record with the regulator.
At a glance
Project
- NameEternia Towers A to D
- TypeResidential / Group Housing
- Location
- LBS Marg
- Mulund
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006141
- ReraGenie IDRG-MH-20364
Builder
- NameOberoi Constructions Limited
- Entity typeCompany
- CINU45202MH1993PLC074836
- GSTIN27AAACO1805E1ZX
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsSaumil Daru, Bindu Ranvir Oberoi, Vikas Ranvir Oberoi
- Other registrations3 more →
- Completed3 of 4
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion10 May 2026
- Revised completionRevised to 10 May 2026 (originally 30 Dec 2022)
- Buildings4 building records
- Documents filed184 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 79 | 61 | 332 | 0 | 332 |
| Tower B | NA | 79 | 61 | 332 | 0 | 332 |
| Tower C | NA | 79 | 60 | 320 | 0 | 320 |
| Tower D | NA | 79 | 59 | 328 | 0 | 328 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 44 construction stages are filed complete across 4 buildings.
Tower A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed3335
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower A | 850 | 850 |
| Tower B | 843 | 843 |
| Tower C | 810 | 810 |
| Tower D | 832 | 832 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower A | NA | Rs 228.86 cr | Rs 262.00 cr |
| Tower B | NA | Rs 228.86 cr | Rs 264.68 cr |
| Tower C | NA | Rs 224.20 cr | Rs 259.58 cr |
| Tower D | NA | Rs 224.20 cr | Rs 259.16 cr |
| - | NA | Rs 188.02 cr | Rs 251.57 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Architect Sunil Arora |
| Architect | Siddhesh Samant |
| Engineer | Leslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd |
| Chartered Accountant | TMG & Associates |
| Partner | Role in project |
|---|---|
| Oberoi Realty Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera. On account of the Covid 19 pandemic and the ensuing lockdown, the supply chains and logistics were disrupted, as a consequence whereof, supply of material, equipment and machinery etc. needed for construction was not available and the projected timelines for progress in construction could not be met. b. Despite relaxation of the lockdown on account of the Covid 19 pandemic, and the consequent gradual opening up, there continues to be an acute shortage of labour, especially for large construction projects like the said Project, which not only requires labourers with a certain level of experi
Reason as filed by the promoterAs directed by MahaRERA, a declaration on 500Rs Stamp Paper has been submitted seeking extension for 100 days from the date of Extension Application i.e. till 10th May 2026.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| SW/82/2022/2022 | Metropolitan Magistrate Court, 27th Court at Mulund | Ongoing |
| PS/3/2022/2022 | Metropolitan Magistrate Court, 42nd Court at Shindewadi, Dadar | Ongoing |
Complaints filed with MahaRERA11
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044369 | Guruprasad Purushottam Mandrawadkar | Mr. Vikas Oberoi | 01/05/2018 |
| CC006000000251653 | Tushar Agarwal | Oberoi Constructions Limited | 11/07/2022 |
| CC006000000282121 | Guruprasad Mandrawadkar | Oberoi Constructions Ltd Co | 29/07/2022 |
| CC006000000303054 | Satheesha Shetty | Oberoi Constructions | 17/11/2022 |
| CC006000000375040 | Renu Sainani | Oberoi Constructions Limited | 30/03/2023 |
| CC006000000375179 | Sreejith Rajan | Oberoi Constructions Limited | 10/04/2023 |
| CC006000000375231 | Nirav Dinesh Dedhia | Oberoi Constructions Limited | 12/04/2023 |
| CC006000000396086 | Rohit Aggarwal | Oberoi Construction Limited | 07/06/2023 |
| CC006000000397466 | ASHWIN SOBHRAJ THAKKAR | OBEROI CONSTRUCTIONS LIMITED | 12/09/2023 |
| CC006000000500628 | DARSHAN BHINDE | OBEROI CONSTRUCTIONS LTD | 12/07/2024 |
| CC12602649 | Kapil Bhagat | Oberoi Constructions Limited | 07/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Sep 2023
Documents filed184
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 184 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Eternia A-D_Form 2.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Eternia A-D_Form 3___.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A-D_Form 1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A to D Form 1 June 2025.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Eternia A to D Form 1 Sep 2025.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A-D_Form 2.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A-D_Form 2.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A-D_Form 2.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A-D_Form 2.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A to D Form 2 Sep 2025.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A to D Form 2 June 2025.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Eternia A to D Form 2 Sep 2025.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: ORL_Form_3_Eternia.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: ORL_Form_3_Eternia.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: ORL_Form_3_Eternia.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: Eternia A-D Form 3 202512.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: Eternia A-D Form 3 202509.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: Eternia A-D Form 3 202506Signed.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: Eternia A D Form 3 Sep 2025.pdf | 9 Apr 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ORL_Form-2A-Eternia_Tower_A-D.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCL_Form-1_Eternia_Tower A-D.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Eternia_Tower_A-D_Form 3.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCL_Form-2_Eternia_Tower A-D.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 19 Apr 2025 |
| Declaration in FORM BFile: Eternia Form B.pdf | 10 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ORL_Eternia_Towers A to D_Reduced.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: ORL_Eternia_.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ORL_Eternia_Tower A to D.pdf | 20 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_OCL_Eternia.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Eternia A-D Form 3.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_OCL_Eternia.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: REDUCED_Eternia A-D.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Eternia Tower A to D_ORL.pdf | 20 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QueryForm 2_Eternia Tower A to D_OCL.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: ORL_Form_3_Eternia.pdf | 20 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Eternia_A_D.pdf | 20 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_Eternia_A_D.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_Eternia_A_D.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: Eternia A-D Form 3.pdf | 20 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1EterniaAtoD.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2EterniaTowerAtoD.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Eternia A-D Form 3_Signed.pdf | 20 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Eternia A to D.pdf | 20 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia A to D.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Eternia A-D Form 3.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eternia.pdf | 30 Sep 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2358366_OC_signed_Eternia.pdf | 25 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eternia_A-D_Form 2A.pdf | 21 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_Eternai A_D_OCL.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_Eternia_A_D.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Eternia_Form_3_2023.pdf | 20 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023 04 14 - Eternia_Architect Certificate_Q4FY23 N - 14 Apr 23.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia_A-D_Form 2.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Eternia_A-D_Form 2A.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Eternia Form 3_LOWEST.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eternia Tower A Form 1 2022 12.pdf | 20 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia Tower A Form 2 2022 12.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: Eternia Tower A Form 3 2022 12.pdf | 20 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Eternia_Quality Assurance Certificate_FY22.pdf | 29 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory-Eternia_compressed (1).pdf | 14 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eternia.pdf | 20 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia_Engineer's Certificate.pdf | 20 Oct 2022 |
| Certificates of CA (Form 3)File: EterniaForm3 _R.pdf | 20 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Eternia_low res.pdf | 30 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eternia_Architect Certificate_Q1FY23.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia_Engineers Certificate_Q1FY23.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: Eternia_CA Certificate_Q1FY23.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternia_Engineers Certificate_Q4FY22.pdf | 19 Apr 2022 |
| Certificates of CA (Form 3)File: Eternia_CA Certificate_Q4FY22.pdf | 8 Apr 2022 |
| Building plan approvalFile: Amended plan 14082021 Edited.pdf | 7 Apr 2022 |
| Building plan approvalFile: Amended plan 22032022 Edited.pdf | 7 Apr 2022 |
| Building plan approvalFile: Amended plan 29092020 Edited.pdf | 7 Apr 2022 |
| Building Plan Approval (IOD)File: Amended plan 14082021 Edited.pdf | 7 Apr 2022 |
| Building Plan Approval (IOD)File: Amended plan 22032022 Edited.pdf | 7 Apr 2022 |
| Building Plan Approval (IOD)File: Amended plan 29092020 Edited.pdf | 7 Apr 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| MaximaP51800017154 | JVLR, Mumbai Suburban | 132 | Jul 2018 | Completed | Jun 2023 | Jun 2023 |
| Grande Splendor Complex | Grande Splendor Complex JVLR Jogeshwari East Mumbai 400060 | 157 | - | Completed | Jan 2014 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 184 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Eternia Towers A to D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 278 registered projects within 2 km.
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
REJUVE 360 - TOWER A
Elevated Avenue Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Oberoi Constructions Limited
Oberoi Constructions Limited has 4 registrations on MahaRERA, including Prisma and Enigma Towers A and B. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Eternia Towers A to D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Eternia Towers A to D is delayed beyond 10 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Eternia Towers A to D?
The registered promoter entity is Oberoi Constructions Limited, a company as per the filing. Its CIN U45202MH1993PLC074836 and GSTIN 27AAACO1805E1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Eternia Towers A to D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Eternia Towers A to D?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Eternia Towers A to D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Eternia Towers A to D?
The professionals named in the filing: Architect: Architect Sunil Arora; Architect: Siddhesh Samant; Engineer: Leslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd; Chartered Accountant: TMG & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Eternia Towers A to D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback