Home / Browse projects / Mumbai Suburban, Maharashtra / Bellanza Phase 2 - Wing D, E, F at The Prestige City
Bellanza Phase 2 - Wing D, E, F at The Prestige City
By PRESTIGE MULUND REALTY PRIVATE LIMITED
RG-MH-84959 · RERA P51800046488 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 30 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 4 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bellanza Phase 2 - Wing D, E, F at The Prestige City is a Residential / Group Housing project by PRESTIGE MULUND REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046488 on 6 Aug 2022. Possession is promised by 30 Jun 2027. 758 of the 799 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBellanza Phase 2 - Wing D, E, F at The Prestige City
- TypeResidential / Group Housing
- Location
- Adishakti Marg Near Veena Nagar
- Mulund West
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800046488
- ReraGenie IDRG-MH-84959
Builder
- NamePRESTIGE MULUND REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU45309MH2016PTC287566
- GSTIN27AAOCA9048H2Z7
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsZYAD NOAMAN, UZMA IRFAN
- Other registrations5 more →
- Completed1 of 6
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Aug 2022
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bellanza Phase 2 - Wing D, E, F at The Prestige City | NA | 65 | 53 | 799 | 0 | 799 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 60%.
Bellanza Phase 2 - Wing D, E, F at The Prestige City: 5% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 60% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Clubhouse | Yes | 0% |
Parking filed1225
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Legal Entity |
| Engineer | SHREE VENKATADRI ASSOCIATES |
| Chartered Accountant | BHUVANA BHAT & ASSOCIATES |
| Chartered Accountant | MUNIYAL PADMANABHA BHAT |
| Partner | Role in project |
|---|---|
| PRESTIGE MULUND REALTY PRIVATE LIMITED | - |
Litigation declared30
| Case | Court | Status |
|---|---|---|
| 1148/2005 | BOMBAY HIGH COURT | Ongoing |
| 1161/2009 | BOMBAY HIGH COURT | Ongoing |
| 1138/2011 | BOMBAY HIGH COURT | Ongoing |
| APPEAL NUMBER NOT NUMBERED/2014 | HONBLE REVENUE MINISTER | Pending |
| 16078/2014 | BOMBAY HIGH COURT | Ongoing |
| 105/2020 | BOMBAY HIGH COURT | Ongoing |
| 440/2021 | NCLAT | Pending |
| 227/2021 | NCLAT | Pending |
| 1123/2021 | NCLT | Pending |
| 6328/2021 | SUPREME COURT OF INDIA | Pending |
| 1022/2021 | NCLT | Pending |
| 647/2021 | NCLT | Ongoing |
| 355/2021 | NCLAT | Pending |
| 1448/2005 | Bombay High Court | Ongoing |
| 5241/2024 | National Company Law Tribunal | Ongoing |
| 5242/2024 | National Company Law Tribunal | Ongoing |
| 5048/2024 | National Company Law Tribunal | Ongoing |
| 599/2025 | National Company Law Tribunal | Ongoing |
| 5049/2025 | National Company Law Tribunal | Ongoing |
| 408/2025 | National Company Law Tribunal | Ongoing |
| 3947/2023 | National Company Law Tribunal | Ongoing |
| 2194/2018 | National Consumer Disputes Redressal Commission | Ongoing |
| SW/131/2016 | Mulund Metropolitan Magistrate | Ongoing |
| SW/111/2016 | Mulund Metropolitan Magistrate | Ongoing |
| SW/122/2016 | Mulund Metropolitan Magistrate | Ongoing |
| SS/1069/2016 | Metropolitan Magistrate Esplanade 23rd Court | Ongoing |
| SS/1070/2016 | Metropolitan Magistrate Esplanade 23rd Court | Ongoing |
| SS/1071/2016 | Metropolitan Magistrate Esplanade 23rd Court | Ongoing |
| SS/1072/2016 | Metropolitan Magistrate Esplanade 23rd Court | Ongoing |
| 449/2025 | National Company Law Tribunal | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600397 | Bhakti Achrekar | PRESTIGE MULUND REALTY PRIVATE LIMITED | 30/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Aug 2022
Documents filed166
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Qtr 4_Form 1_Bellanza Ph 2 Wing DE F.pdf | 20 Apr 2026 |
| Form 2File: Qtr 4_Form 2_Bellanza Ph 2 Wing D_E_ F.pdf | 20 Apr 2026 |
| Form 3File: Form 3_Bellanza Phase 2.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Q4_Bellanza Phase 2_Sold Unsold.pdf | 20 Apr 2026 |
| Form 1File: Q1 Form 1.pdf | 23 Jan 2026 |
| Form 2File: Q1 Form 2.pdf | 23 Jan 2026 |
| Form 3File: Q1 Form 3.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Q1 Sold Unsold.pdf | 23 Jan 2026 |
| Form 1File: Q3 Form 1.pdf | 23 Jan 2026 |
| Form 2File: Q3 Form 2.pdf | 23 Jan 2026 |
| Form 3File: Q3 Form 3.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Q3 Sold Unsold.pdf | 23 Jan 2026 |
| Form 1File: Q2 Form 1.pdf | 23 Jan 2026 |
| Form 2File: Q2 Form 2.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Q2 _sold unsold.pdf | 23 Jan 2026 |
| Form 3File: Q2 Form 3.pdf | 23 Jan 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Bellenza Ph 2 (Annexure 1).pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bellanza Ph 2 Q4.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bellanza Ph 2 Q4.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bellanza Ph 2 Q4.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Bellanza Ph 2 Q4.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bellanza Ph 1 Form 1 Q3.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bellanza Ph 2 Form 1 Q3.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bellanza Ph 2 Form 3 Q3.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bellanza Ph 1 Form 2 Q3.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bellanza Ph 2 Form 2 Q3.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Bellanza Ph 2 Sold Unsold Q2 (2).pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Bellanza Ph 2 Sold Unsold Q3.pdf | 29 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bellanza 2.pdf | 20 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Bellanza Ph 2.pdf | 20 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Bellanza Ph 2.pdf | 20 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bellanza 2.pdf | 20 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bellanza Ph 2 Form 1 Q2.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bellanza Ph 2 Form 3 Q2.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bellanza Ph 2 Form 2 Q2.pdf | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Bellanza Ph 1 Sold Unsold Q2.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bellanza - Phase II.pdf | 14 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bellanza Phase II - Form 2.pdf | 14 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Bellanza Phase 2 TPCM sold unsold.pdf | 14 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bellanza Phase 2 form 3.pdf | 14 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bellanza Phase -2 - Q4.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bellanza Phase 2 - Q4.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: Q4-Bellanza Phase II - FY23-24.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ballanza Phase 2- Q4.pdf | 2 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A BALLANZA pHASE 2.pdf | 7 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bellanza Phase 2.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Bellanza Ph 2.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Bellanza Phase II RERA Q3 - FY-23-24.pdf | 3 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bellanza Phase 2 - CA Certificate - Form 3.pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 3 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 7 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: List of Sold - Unsold.pdf | 7 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: List of Sold-Unsold.pdf | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: List of Sold-Unsold.pdf | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: List of Sold-Unsold.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 10 Oct 2023 |
| Declaration about Commencement CertificateFile: Form D - Declaration about CC_Bellanza_Phase II_161222.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect_Q2 Bellanza (Phase 2).pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer_Q2 Bellanza (Phase 2).pdf | 21 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold_Unsold_ Q2_Bellanza Phase 2.pdf | 21 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Parking_Garages Q2_Bellanza Phase 2.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA_Q2 Bellanza (Phase 2).pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 2 of 5.pdf | 5 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 3 of 5.pdf | 5 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 4 of 5.pdf | 5 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 5 of 5.pdf | 5 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Allotment Draft PDF.pdf | 5 Aug 2022 |
| Other - TechnicalFile: 0335_220805164353_001.pdf | 5 Aug 2022 |
| Other - TechnicalFile: Block Plan Bellanza 5 Aug 22.pdf | 5 Aug 2022 |
| Proforma of Allotment letterFile: AFS Draft PDF_compressed.pdf | 4 Aug 2022 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Forest Hills Ph 1 at The Prestige CityP51800077457 | Veena Nagar, Mulund (W), Mumbai Suburban | 663 | Aug 2024 | Ongoing | Dec 2030 | Not due yet |
| PRESTIGE JASDAN CLASSICP51900031285 | BYCULLA, Mumbai City | - | Oct 2021 | Completed | Dec 2025 | May 2025 |
| SIESTAP51800005285 | MULUND WEST, Mumbai Suburban | - | Aug 2017 | Completed | Jun 2025Registered original: Dec 2023 | Apr 2025 |
| PRESTIGE BAGMANE TEMPLE BELLS | Sy No 54 55 56-1 56-2 56-3 56-4 57-2 Hosekerahalli Village Uttarahalli Hobli Bangalore South | 968 | - | Completed | Sep 2019 | Jun 2019 |
| PRESTIGE DEJAVU | Khata No 51-1 Promenade Road Coles Road Frazer Town Bangalore | 40 | - | Completed | Aug 2019 | Aug 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 166 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Bellanza Phase 2 - Wing D, E, F at The Prest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 178 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
REJUVE 360 - TOWER A
Elevated Avenue Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: PRESTIGE MULUND REALTY PRIVATE LIMITED
PRESTIGE MULUND REALTY PRIVATE LIMITED has 6 registrations on MahaRERA, including SIESTA and Bellanza Phase 1 - Wing A, B, C at The Prestige City. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Bellanza Phase 2 - Wing D, E, F at The Prestige City is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bellanza Phase 2 - Wing D, E, F at The Prestige City?
The registered promoter entity is PRESTIGE MULUND REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2016PTC287566 and GSTIN 27AAOCA9048H2Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bellanza Phase 2 - Wing D, E, F at The Prestige City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Bellanza Phase 2 - Wing D, E, F at The Prestige City?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Bellanza Phase 2 - Wing D, E, F at The Prestige City?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bellanza Phase 2 - Wing D, E, F at The Prestige City?
The professionals named in the filing: Architect: Legal Entity; Engineer: SHREE VENKATADRI ASSOCIATES; Chartered Accountant: BHUVANA BHAT & ASSOCIATES; Chartered Accountant: MUNIYAL PADMANABHA BHAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bellanza Phase 2 - Wing D, E, F at The Prestige City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback