Home / Browse projects / Mumbai Suburban, Maharashtra / Atmosphere O2

Registered Litigation declared Residential / Group Housing project

Atmosphere O2

By Atmosphere Realty Pvt Ltd

RG-MH-02826 · RERA P51800019950 · Last updated on MahaRERA portal: 16 Jul 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 13 complaints at MahaRERA
  • Rs 80.00 crore secured on the land, in favour of Aditya Birla Finance Ltd.

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
26 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 82%
42 of 830Units unsoldnot recorded sold or booked
13Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Atmosphere O2 is a Residential / Group Housing project by Atmosphere Realty Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800019950 on 15 Mar 2019. Possession is promised by 30 Dec 2026. 788 of the 830 units on this registration are recorded sold or booked, and 26 of 33 construction stages are filed complete. 13 complaints are on record with the regulator.

At a glance

Project

  • NameAtmosphere O2
  • TypeResidential / Group Housing
  • Location
    • G M Road
    • Chembur (West)
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800019950
  • ReraGenie IDRG-MH-02826

Builder

  • NameAtmosphere Realty Pvt Ltd
  • Entity typeCompany
  • DirectorNavin Amarlal Makhija
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Mar 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed82 files

Current status

95%788 of 830 units booked
77.8%Work done, per cost certificate

Figures as on 16 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER DNA53472200220
TOWER ENA53472610261
TOWER FNA53473490349

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 82%.

TOWER D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER F65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 16 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Fitness centerYes50%
Society OfficeYes70%
Swimming PoolYes30%

Parking filed889

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots889
Closed/Covered889
BuildingClosed/CoveredTotal
TOWER D227227
TOWER E316316
TOWER F346346

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,990 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd.
Secured amountRs 80.00 crore
Declared on3 Oct 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI107583.49
Proposed, not sanctioned106,164 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBandra West Mumbai
Estimated costRs 539.24 cr
Cost incurredRs 419.44 cr
Work done77.78%
BuildingWingEstimatedIncurred
TOWER FNARs 184.68 crRs 138.78 cr
TOWER ENARs 165.34 crRs 152.12 cr
TOWER DNARs 135.29 crRs 128.54 cr
-NARs 53.92 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associate Pvt, Ltd.
ArchitectSandeep Shikre & Associates
EngineerMillion Jobs Private limited
Chartered AccountantTaishete Mehta Associates
Chartered AccountantMA Parikh Shah & Associates LLP
PartnerRole in project
Atmosphere Realty Pvt Ltd-

Litigation declared5

CaseCourtStatus
629/2013HIGH COURTDisposed off
35/2015HIGH COURTDISPOSED OFF
599/2015HIGH COURTPENDING
609/2014Bombay High CourtPending
CC006000000500641/2024RERAOngoing

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC006000000196482Darryl Savio BarrettoAtmosphere Realty Pvt. Ltd.25/03/2021
CC006000000210519MS. Meghana Sharad PawarM/S Atmosphere Realty Private Ltd25/03/2022
CC006000000251590Savita Sharad PawarM/S Atmosphere Realty Private Ltd29/06/2022
CC006000000333992DHARMENDRA BHIVA DHURIAtmosphere Realty Pvt. Ltd.19/01/2023
CC006000000344256Atmosphere Realty Private LimitedDarryl Paul Barretto07/02/2023
CC006000000395871Manish Uddhav KulkarniAtmosphere Realty Pvt Ltd19/05/2023
CC006000000397520Atmosphere Realty Private Linited Through Director Manohar ChhabriaMrs. Rashmi Rajan Sarang21/09/2023
CC006000000408491Giselle DixonLohith15/12/2023
CC006000000500641AtmosphereRealty Private LimitedYogita Yadav08/06/2024
CC006000000480254Anurag GolipkarAtmosphere Realty Pvt Ltd26/04/2024
CC12501032Atmosphere Realty Pvt LtdMr Nihar Ranjan Panda27/03/2025
CC12501621Abhay SalotAtmosphere Realty Pvt Ltd18/05/2025
CC12504117Atmosphere Realty Pvt LtdPriya Prashant Dhuri22/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: SIGNED FORM5 FY 24-25 ATMOSHPHEREO2 .pdf16 Jul 2025
Architect’s Certificate on Completion of Project (Form 4)File: Signed Form 4 DEF.pdf18 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Signed Form 4 DEF.pdf13 Nov 2024
Details of encumbrancesFile: Mortgage undertaking.pdf17 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Signed Form 4 DEF.pdf17 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC F Wing 24 sept 2024.pdf17 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_200057580550- Tower DEF.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ATMOSPHERE-O2-FORM 5.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form1 D E and F Tower.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Atmosphere O2 D, E and F_March 24.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Atmosphere O2 Tower D, E and F.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Atmosphere Dec-22 Upload.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate AtmosphereO2 mar-23.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Atmosphere O2 Jun-23.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate AtmosphereO2 sep-23.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer-Atmosphere 02-Sep 22-220223.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Atmosphere Dec-22 BW.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate AtmosphereO2_Sep-23.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form-3 Atmosphere O2 Dec-22 Signed-compressed_compressed.pdf2 Jan 2024
Certificates of CA (Form 3)File: C A Certificate AtmosphereO2_Sep-23-compressed-compressed-compressed.pdf2 Jan 2024
Certificates of CA (Form 3)File: C A Certificate AtmosphereO2_Sep-23-compressed-compressed-compressed.pdf2 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Tower-D-E.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ATMOSPHERE-FORM-5-O2 FY-22-23.pdf18 Jul 2023
Details of encumbrancesFile: Ltr-Encumbrances-TopUpLoad-AdityaBirla-8June2023_Uploaded.pdf8 Jun 2023
Certificates of CA (Form 3)File: Form-3 Atmosphere Signed BW_compressed.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Atmosphere- O2.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jun-22 Signed BW.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_Atmosphere O2_Sep-22.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Atmosphere O2_Jun-22.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Signed Architect Atmosphere O2 Mar22.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Signed Atmosphere O2 Mar-22.pdf8 Jul 2022
Copy of the legal title reportFile: Supplemental Title Report 10 03 2022.PDF21 Jun 2022
Certificates of CA (Form 3)File: ATMOSPHERE O2_merged_compressed-compressed.pdf19 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Atmosphere O2 form 5 MAR20.pdf19 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_AtmosphereO2_Dec21_comp.pdf9 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Atmosphere O2_Dec-21.pdf9 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Atmosphere O2.pdf9 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 TW Gardens FY 20-21-compressed.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate AtmosphereO2 Sep-21.pdf23 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer's Certificate_Atmosphere O2-Sep-21.pdf23 Dec 2021
Details of encumbrancesFile: RERA Letter -Encumbrance on Project.pdf20 Nov 2021
Certificates of CA (Form 3)File: Form 3 Atmosphere Phase II O2_30_sep_21.pdf11 Nov 2021
Details of encumbrancesFile: 20211004.pdf4 Oct 2021
Details of encumbrancesFile: EncumbrancesSep21.pdf28 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate June2021.pdf3 Sep 2021
Certificates of CA (Form 3)File: ATMOSPHERE FORM 3 June2021.pdf3 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect CertificateAtmosphereO2Jun21-compressed.pdf27 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect AtmosphereO2_31122020.pdf3 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_AtmosphereO2_31032021.pdf3 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Atmosphere O2-December2020.pdf12 Apr 2021
Certificates of CA (Form 3)File: atmosphere_form_3_as_on_31_dec_20 Signed.pdf9 Apr 2021
Declaration in FORM BFile: Form B.pdf17 Dec 2020
Layout approvalFile: 20200924 Atmosphere O2_WING-F_Typical_floor_plan.pdf30 Sep 2020
Copy of Layout Approval (in case of layout)File: 20200924 Atmosphere O2_WING-F_Typical_floor_plan.pdf30 Sep 2020
Proforma of Allotment letterFile: AgreementForSale-Phase-II-8Sept2020_compressed.pdf8 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Atmosphere O2 form 5 MAR20.pdf18 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Atmosphere O2 form 5 MAR20.pdf31 Jul 2020
Details of Restarting of Construction work post lockdownFile: Post Covid - Phase 2.pdf16 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: 2246079_FurtherCC_signed.pdf20 Mar 2020
Declaration in FORM BFile: 2246079_FurtherCC_signed.pdf18 Mar 2020
Proforma of Allotment letterFile: AgreementForSale-Phase-II - Final_compressed.pdf11 Mar 2020
OtherFile: Ltr-AdditionalInformation-Nahur-20Jan2020.pdf21 Jan 2020
Layout approvalFile: compressed block plan for rera.pdf12 Mar 2019
Layout approvalFile: compressed_D.pdf12 Mar 2019
Layout approvalFile: compressed_E.pdf12 Mar 2019
Layout approvalFile: compressed_F.pdf12 Mar 2019
Layout approvalFile: Compressed_Current approved plan.pdf12 Mar 2019
Copy of Layout Approval (in case of layout)File: compressed block plan for rera.pdf12 Mar 2019
Copy of Layout Approval (in case of layout)File: compressed_D.pdf12 Mar 2019
Copy of Layout Approval (in case of layout)File: compressed_E.pdf12 Mar 2019
Copy of Layout Approval (in case of layout)File: compressed_F.pdf12 Mar 2019
Copy of Layout Approval (in case of layout)File: Compressed_Current approved plan.pdf12 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: A Combine CC Atmosphere II Compressed.pdf12 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: B Combine CC Atmosphere II Compressed.pdf12 Mar 2019
Declaration in FORM BFile: Mcompressed_formB-min.pdf12 Mar 2019
Building plan approvalFile: IOD Bldg 2 Amended approval Letter.pdf4 Mar 2019
PAN CardFile: Atmosphere Realty Pan Card.pdf4 Mar 2019
Copy of the legal title reportFile: Legal Title Report.pdf4 Mar 2019
Details of encumbrancesFile: Encumbrances.pdf4 Mar 2019
Building Plan Approval (IOD)File: IOD Bldg 2 Amended approval Letter.pdf4 Mar 2019

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Atmosphere O2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur (West)6,700+ in Mumbai Suburban

Builder: Atmosphere Realty Pvt Ltd

Atmosphere Realty Pvt Ltd has 4 registrations on MahaRERA, including Atmosphere Phase 1 and Atmosphere O2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Atmosphere O2 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Atmosphere O2?

The registered promoter entity is Atmosphere Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Atmosphere O2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Atmosphere O2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Atmosphere O2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Atmosphere O2?

The professionals named in the filing: Architect: Sandeep Shikre & Associate Pvt, Ltd.; Architect: Sandeep Shikre & Associates; Engineer: Million Jobs Private limited; Chartered Accountant: Taishete Mehta Associates; Chartered Accountant: MA Parikh Shah & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Atmosphere O2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Atmosphere O2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Atmosphere O2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.