Red flags

  • Litigation declared, 2 cases
  • Encumbrance declared on the project land

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 85%
2 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 216 documents Report an error

Portia Grande is a Residential / Group Housing project by Vilas Javdekar Eco Homes in Pune, Maharashtra, registered with MahaRERA as P52100050636 on 21 Apr 2023. Possession is promised by 31 Dec 2027. 130 of the 132 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NamePortia Grande
  • TypeResidential / Group Housing
  • Location
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050636
  • ReraGenie IDRG-MH-76580

Builder

  • NameVilas Javdekar Eco Homes
  • Entity typePartnership
  • GSTIN27AAEFV4570G1Z0
  • PartnerAditya Vilas Javdekar
  • Other registrations10 more →
  • Completed5 of 11
  • Declared earlier projects8 →

Key dates

this monthRegisteredApr 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed216 files

Current status

98%130 of 132 units booked
78.2%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA363366066
Tower 2NA363366066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.

Tower 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Tower 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed472

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots472
Closed/Covered452
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
Tower 122610236
Tower 222610236

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
CERSAI search filedYes
Declared on6 May 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI38000.0
Proposed, not sanctioned34,589 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMayur Colony, Kothrud, Pune 411038
Estimated costRs 198.97 cr
Cost incurredRs 155.68 cr
Work done78.24%
BuildingWingEstimatedIncurred
Tower 1NARs 82.48 crRs 68.52 cr
Tower 2NARs 82.48 crRs 68.66 cr
-NARs 34.01 crRs 18.50 cr

Certifying professionals and partners13

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepali Patidar
ArchitectPriya Honmute
ArchitectVoussoirs
ArchitectAr. Surendra Gade
ArchitectKetakee Devdhar
ArchitectAnuja Joshi
ArchitectSandeep Hardikar & Associates
EngineerRanjeet Gaikwad
EngineerSagar Kale
EngineerNitin Tarange
Chartered AccountantAbhijit Mundada
Chartered AccountantPatki & Soman
PartnerRole in project
Vilas Javdekar Eco Homes-

Litigation declared2

CaseCourtStatus
RCS 2228 /2023Civil CourtOngoing
2193/2022Civil Court, PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed216

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 216 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Portia Grande 30-06-26.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Portia Grande 30-06-26.pdf11 Jul 2026
Withdrawal Update Form 3File: CA certificate Portia Grande_30-06-2026.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Portia Grande 30-06-26.pdf8 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Portia Grande 30-06-26.pdf8 Jul 2026
Withdrawal Update Form 3File: CA certificate Portia Grande_30-06-2026.pdf8 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Portia Grande 31-03-26 .pdf12 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate PG 24-04-26.pdf12 Jun 2026
Withdrawal Update Form 3File: CA Certiifcate Portia Grande 23-04-26.pdf12 Jun 2026
Form 2A (FY 2025-2026)File: Form 2 A Portia Grande Signed.pdf30 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Portia Grande 31-03-26 .pdf20 Apr 2026
Withdrawal Update Form 2File: Engg certi_Portia Grande_30032026 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Scanned Copy of PG.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect certificate Portia Grande 10-02-2026.pdf7 Mar 2026
Withdrawal Update Form 2File: Enginner certificate Portia grande 10-02-26 .pdf7 Mar 2026
Withdrawal Update Form 3File: CA Certificate Portia Grande 11-02-26.pdf7 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Portia grande 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Portia Grande 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA Certificate Portia Grande 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Portia Grande 08-12-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 08-12-25.pdf17 Dec 2025
Withdrawal Update Form 3File: CA Certificate PORTIA GRANTE 09-12-25.pdf17 Dec 2025
Withdrawal Update Form 1File: Ar certificate Portia Grande 18-11-25.pdf11 Dec 2025
Withdrawal Update Form 2File: Engineer Certifiacte Portia Grande 18-11-25.pdf11 Dec 2025
Withdrawal Update Form 3File: CA Certificate Portia Grande 19-11-25.pdf11 Dec 2025
Withdrawal Update Form 1File: Architect certificate Portia grande 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 3File: CA Certificate Portia grande 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 1File: Architect certificate Portia Grande 28-09-25.pdf30 Sep 2025
Withdrawal Update Form 2File: Engineer certificate PG 28-09-25.pdf30 Sep 2025
Withdrawal Update Form 3File: CA Certificate PG Signed 29-09-25.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: VJEH_PG_SIGN.pdf30 Sep 2025
Withdrawal Update Form 1File: Architect certificate Portia Grande 21-09-25.pdf29 Sep 2025
Withdrawal Update Form 2File: Engineer certificate Portia grande 21-09-25.pdf29 Sep 2025
Withdrawal Update Form 3File: CA Certificate Portia grande 22-09-25.pdf29 Sep 2025
Withdrawal Update Form 1File: Architect certificate Portia Grande 07-09-25.pdf18 Sep 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 15-09-25.pdf18 Sep 2025
Withdrawal Update Form 3File: CA Certificate Portia Grande 16-09-25.pdf18 Sep 2025
Withdrawal Update Form 1File: Architect certificate Portia Grande 07-09-25.pdf13 Sep 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 09-09-25.pdf13 Sep 2025
Withdrawal Update Form 3File: CA Certificate Portia Grande 10-09-25.pdf13 Sep 2025
Withdrawal Update Form 1File: Architect certificate Portia Grande 07-09-25.pdf12 Sep 2025
Withdrawal Update Form 2File: Engineer certificate PG 07-09-25.pdf12 Sep 2025
Withdrawal Update Form 3File: CA certificate Portia Grande 08-09-25.pdf12 Sep 2025
Withdrawal Update Form 1File: Architech certificate Portia Grande 18-08-25.pdf21 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Portia Grande 18-08-25.pdf21 Aug 2025
Withdrawal Update Form 3File: CA certificate (Form 3) Portia Grande_stamp and signed.pdf21 Aug 2025
Withdrawal Update Form 1File: Architech certificate Portia grande 11-08-25.pdf20 Aug 2025
Withdrawal Update Form 2File: Engineer certificate Portia grande 11-08-25.pdf20 Aug 2025
Withdrawal Update Form 3File: CA certificate (Form 3) Portia Grande_Stamp u0026 Signed.pdf20 Aug 2025
Withdrawal Update Form 1File: Architech certificate Portia grande 04-08-25.pdf13 Aug 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 04-08-25.pdf13 Aug 2025
Withdrawal Update Form 3File: CA Certificate Portia Grande 05-08-25.pdf13 Aug 2025
Withdrawal Update Form 1File: Architech certificate Portia Grande 16-07-25.pdf5 Aug 2025
Withdrawal Update Form 2File: Engineer certificate Portia Grande 27-07-25.pdf5 Aug 2025
Withdrawal Update Form 3File: CA Certificate PG 28-07-25.pdf5 Aug 2025
Withdrawal Update Form 1File: Architech certificate Portia Grande 30-06-25.pdf11 Jul 2025
Withdrawal Update Form 1File: Architech certificate Portia Grande 30-06-25.pdf11 Jul 2025
Withdrawal Update Form 2File: Engineer certiifcate Porita grande 30-06-25.pdf11 Jul 2025
Withdrawal Update Form 2File: Engineer certiifcate Porita grande 30-06-25.pdf11 Jul 2025
Withdrawal Update Form 3File: VJEH-PG.pdf11 Jul 2025
Withdrawal Update Form 3File: VJEH-PG.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: PG_Form2A_31032025_Signed.pdf25 Jun 2025
Form 1File: PG_Architect_31032025_Signed.pdf6 May 2025
Form 2File: PG_Engineer_31032025_Signed.pdf6 May 2025
Form 3File: PG_CA_ 31032025_Signed.pdf6 May 2025
OthersFile: PG_Form2A_31032025_Signed.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: PG_Sold Inventory_31032025_Signed.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PG_Form2A_31032025_Signed.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PG_Architect_31032025_Signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PG_Engineer_31032025_Signed.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: PG_Sold Inventory_31032025_Signed.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3) Portia Grande_ Signed_.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_PG_Anuja -signed.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3) Portia Grande_signed.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Portia Grande 19-03-25_signed.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Portia grande 17-02-25_signed.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Portia Grande.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Portia Grande 30-01-25_signed.pdf11 Feb 2025

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
YASH101P52100016807Sus, Pune101Jun 2018CompletedMar 2021Jan 1970
YashONE Phase - IP52100014585Pirangut Valley, Pune275Dec 2017CompletedDec 2020Jan 1970
Yashwin AP52100013149Sus, Pune100Sep 2017CompletedSep 2020Jan 1970
Yashwin E,F,GP52100000775Sus, Pune168Jul 2017CompletedDec 2018Jan 1970
Yashwin B, C, DVillage Sus Taluka Mulshi District Pune 411021256-CompletedDec 2016Sep 2016
ShivalayaS no 22 1A City Survey no 664 Kothrud Pune8-CompletedJan 2015Jan 2015
PalashWakad Taluka Mulshi District - Pune319-CompletedJun 2013Jun 2013
Palash Plus200 2 200 2 1 Wakad Taluka - Mulshi District - Pune155-CompletedJan 2013Dec 2012

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Portia Grande on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balewadi13,700+ in Pune

2 kmPortia GrandeCompleted 115Lapsed / revoked 44Other 119Dot size: filed unitsN

Filed coordinates, straight-line distance. 278 registered projects within 2 km.

Builder: Vilas Javdekar Eco Homes

Vilas Javdekar Eco Homes has 11 registrations on MahaRERA, including Yashwin E,F,G and Yashwin A. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Portia Grande is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Portia Grande?

The registered promoter entity is Vilas Javdekar Eco Homes, a partnership as per the filing. Its GSTIN 27AAEFV4570G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Portia Grande?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Portia Grande?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Portia Grande?

The professionals named in the filing: Architect: Deepali Patidar; Architect: Priya Honmute; Architect: Voussoirs; Architect: Ar. Surendra Gade; Architect: Ketakee Devdhar; Architect: Anuja Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Portia Grande?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Portia Grande. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Portia Grande to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.