Godrej Green Vistas
By Mahalunge Township Developers Private Limited
RG-MH-17203 · RERA P52100028117 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 4 cases
- 9 complaints at MahaRERA
- Completion date moved by 11 months
- 2 extensions taken
- Rs 321.00 crore secured on the land, in favour of ICICI Bank Limited
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Green Vistas is a Others project by Mahalunge Township Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100028117 on 4 Feb 2021. The registration is recorded completed; possession was promised by 30 May 2026. The completion date has moved by 11 months from the original filing. 775 of the 784 units on this registration are recorded sold or booked, and 42 of 55 construction stages are filed complete. 9 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Green Vistas
- TypeOthers
- Location
- MDR Road
- Mahalunge
- Mulshi
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100028117
- ReraGenie IDRG-MH-17203
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Feb 2021
- Promised completion30 May 2026
- Revised completionRevised to 30 May 2026 (originally 30 Jun 2025)
- Buildings5 building records
- Documents filed180 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | NA | 24 | 23 | 175 | 10 | 185 |
| Tower 2 | NA | 24 | 23 | 179 | 10 | 189 |
| Tower 3 | NA | 23 | 22 | 171 | 10 | 181 |
| Tower 4 | NA | 28 | 27 | 218 | 10 | 228 |
| Retail Tower | NA | 2 | 2 | 0 | 1 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
42 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.
Tower 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Retail Tower71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 84% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed2262
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 4 | NA | Rs 70.20 cr | Rs 61.91 cr |
| Tower 2 | NA | Rs 53.62 cr | Rs 51.45 cr |
| Tower 1 | NA | Rs 51.87 cr | Rs 50.87 cr |
| Tower 3 | NA | Rs 50.91 cr | Rs 48.65 cr |
| - | NA | Rs 6.96 cr | Rs 6.85 cr |
| Retail Tower | NA | Rs 2.23 cr | Rs 2.21 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vka |
| Architect | ANA Consortium Pvt Ltd |
| Engineer | Bricklane India |
| Engineer | Anil T. Powar |
| Engineer | Deepak Jadhav |
| Chartered Accountant | MD Deshpande & Co |
| Chartered Accountant | M D Deshpande & Co. |
| Chartered Accountant | B S R & Co. LLP |
| Chartered Accountant | BSR & Co. LLP |
| Partner | Role in project |
|---|---|
| Mahalunge Township Developers Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe issuance of the Completion Certificate has been delayed due to technical processing issues at the planning authority. This is expected to be received at the earliest possible. Considering these challenges, we respectfully request an extension of six months, with a revised completion date of 30.12.2025.
Reason as filed by the promoterRespected Sir, We respectfully submit that the Promoter had earlier applied for closure of the MahaRERA registration of the project upon receipt of the Occupancy Certificate (OC), and the said closure application was under scrutiny before the Authority. While the said closure application was pending scrutiny, the project registration stood lapsed. During the course of such scrutiny, the Authority raised a query indicating that certain details/information furnished in the application require correction/modification. In view of the above circumstances, the Promoter has applied for extension of t
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 1233/2014/2014 | Civil Judge Junior DIvision | Ongoing |
| 822/2008/2008 | Civil Judge Junior DIvision | Closed |
| RCS - 170/2021/2021 | Pune District & Sessions Court | Ongoing |
| RCA - 601/2014/2014 | Pune District & Sessions Court | Ongoing |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502761 | Deepak Ashok Pandita | Mahalunge Township Developers LLP | 06/08/2025 |
| CC12503432 | Abhijeet Balasaheb Jadhav | Mahalunge Township Developers LLP | 26/09/2025 |
| CC12504160 | RAHUL DUBEY | Mahalunge Township Developers LLP | 25/11/2025 |
| CC12504089 | Deepali Khatri | Mahalunge Township Developers LLP | 20/11/2025 |
| CC12504100 | Ameya Bhaurao Sawant | Mahalunge Township Developers LLP | 21/11/2025 |
| CC12504703 | Abhishek Gautam | Mahalunge Township Developers LLP | 30/12/2025 |
| CC12600004 | Sandeep Patwa | Mahalunge Township Developers LLP | 01/01/2026 |
| CC12600722 | Rohit Bhat | Mahalunge Township Developers Private Limited | 08/02/2026 |
| CC12604333 | KANJI RAMJIBHAI BERA | Mahalunge Township Developers Private Limited | 11/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed180
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 180 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Part OC 1.pdf | 1 Jun 2026 |
| Occupational CertificateFile: Part OC.pdf | 1 Jun 2026 |
| Occupational CertificateFile: Final OC.pdf | 1 Jun 2026 |
| Occupational CertificateFile: OC verification mail from PMRDA to RERA.pdf | 1 Jun 2026 |
| Layout approvalFile: Retail Tower Godrej Green Vistas_compressed.pdf | 23 May 2026 |
| Building plan approvalFile: Layout R6 Dec 2025.pdf | 20 May 2026 |
| Layout approvalFile: T1 2nd and Typical Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T1 Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T1 Sec and Elev Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T2 sec and Elev Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T2 Typical Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T2 LG Dec 2024.pdf | 20 May 2026 |
| Layout approvalFile: T3 Grnd Floor.pdf | 20 May 2026 |
| Layout approvalFile: T3 Sec and Elev.pdf | 20 May 2026 |
| Layout approvalFile: T3 2nd Floor plan.pdf | 20 May 2026 |
| Layout approvalFile: T4 sec and Elev.pdf | 20 May 2026 |
| Layout approvalFile: T4 terrace.pdf | 20 May 2026 |
| Layout approvalFile: T4 2nd Floor.pdf | 20 May 2026 |
| Layout approvalFile: R6-9.pdf | 20 May 2026 |
| Layout approvalFile: MLCP First Floor.pdf | 20 May 2026 |
| Layout approvalFile: MLCP terrace.pdf | 20 May 2026 |
| Layout approvalFile: MLCP Section and Elevation.pdf | 20 May 2026 |
| Layout approvalFile: MLCP 4th Floor Dec 2025.pdf | 20 May 2026 |
| Layout approvalFile: MLCP 5th Floor Dec 2025.pdf | 20 May 2026 |
| Layout approvalFile: MLCP 3rd Floor Dec 2025.pdf | 20 May 2026 |
| Layout approvalFile: MLCP 2nd Floor DEc 2025.pdf | 20 May 2026 |
| Layout approvalFile: R6-8.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: R-06_RERA FORM-1_20-04-2026.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2 R6.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: R6.pdf | 19 May 2026 |
| Building plan approvalFile: R6-1.pdf | 12 May 2026 |
| Layout approvalFile: R6-2.pdf | 12 May 2026 |
| Layout approvalFile: R6-3.pdf | 12 May 2026 |
| Layout approvalFile: R6-4.pdf | 12 May 2026 |
| Layout approvalFile: R6-5.pdf | 12 May 2026 |
| Layout approvalFile: R6-6.pdf | 12 May 2026 |
| Layout approvalFile: R6-7_compressed.pdf | 12 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 12 May 2026 |
| Form 5 (FY 2025-2026)File: Form 5.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: R-06_RERA FORM-1_20-04-2026.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Form 2 R6.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: R6.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: R-06_Phase 2_RERA FORM-1_16-10-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form -1_R-06_Q3FY26.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Godrej Green Vistas_Q2u002726.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate for Godrej R6 Mahalunge Green Vistas_Dec 25 1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_MDD_Green Vistas_30th September-25_Signed.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Green Vistas - Q3FY26.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: R-06_Rera Form-1_21-07-2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: R-06_Phase 2_RERA FORM-1_16-10-2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Q1_FY 26_Green Vistas.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Godrej Green Vistas_Q2u002726.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_MDD_Green Vistas_30th September-25_Signed.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_MDD_Green Vistas_30th September-25_Signed.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Vistas.pdf | 26 Aug 2025 |
| Withdrawal Update Form 1File: R-06_Rera Form-1_21-07-2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_Q1_FY 26_Green Vistas.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Signed_MDD_Green Vistas_30th June-25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: R-06_Rera Form-1_21-07-2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 1File: R-06_Rera Form-1_21-07-2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 1File: R-06_Rera Form-1_21-07-2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_Q1_FY 26_Green Vistas.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_Q1_FY 26_Green Vistas.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_Q1_FY 26_Green Vistas.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: Signed_MDD_Green Vistas_30th June-25.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: Signed_MDD_Green Vistas_30th June-25.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: Signed_MDD_Green Vistas_30th June-25.pdf | 22 Jul 2025 |
| Form 1File: R-06_Rera Form-1.pdf | 20 Jun 2025 |
| Form 2File: Form 2 - GGV.pdf | 20 Jun 2025 |
| Form 3File: Signed_MDD_Green Vistas_31st Mar-25.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_Godrej Green Vistas.pdf | 20 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R-06_Rera Form-1.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Green Vistas.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_MDD_Green Vistas_31st Mar-25.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - GGV.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure_Godrej Green Vistas.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert _Godrej Green Vistas-1 Apr 2021.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Godrej Green Vistas-1 Apr 2021.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Godrej Green Vistas-1 Apr 2021.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Green Vistas _ Form 1 _ Q3 FY25.pdf | 17 Jan 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Godrej Hillside 1P52100022099 | Mahalunge, Pune | 605 | Aug 2019 | Ongoing | Oct 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 180 filed documents as one ZIP, foldered, with a manifest
Keep Godrej Green Vistas on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mahalunge13,700+ in Pune
Filed coordinates, straight-line distance. 246 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
VTP Aethereus- Phase1
HOME RISING CONSTRUCTION LLP
Builder: Mahalunge Township Developers Private Limited
Mahalunge Township Developers Private Limited has 8 registrations on MahaRERA, including Godrej Green Cove and Godrej Green Vistas. Its filings disclose 8 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Godrej Green Vistas is delayed beyond 30 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Green Vistas?
The registered promoter entity is Mahalunge Township Developers Private Limited, an others as per the filing. Its GSTIN 27AAUCM0614K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Green Vistas?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Green Vistas?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Godrej Green Vistas?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Green Vistas?
The professionals named in the filing: Architect: Vka; Architect: ANA Consortium Pvt Ltd; Engineer: Bricklane India; Engineer: Anil T. Powar; Engineer: Deepak Jadhav; Chartered Accountant: MD Deshpande & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Green Vistas?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback