Home / Browse projects / Pune, Maharashtra / Peninsula Plaza

Registered No litigation declared Commercial project

Peninsula Plaza

By Peninsula Land Limited

RG-MH-32212 · RERA PC1260002500274 · Last updated on MahaRERA portal: 13 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
2 of 8Construction stages donefurthest along: Slabs of Super Structure, 20%
17 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

Peninsula Plaza is a Commercial project by Peninsula Land Limited in Pune, Maharashtra, registered with MahaRERA as PC1260002500274 on 16 Jul 2025. Possession is promised by 31 Mar 2028. 31 of the 48 units on this registration are recorded sold or booked, and 2 of 8 construction stages are filed complete.

At a glance

Project

  • NamePeninsula Plaza
  • TypeCommercial
  • Location
    • Off Mamurdi Gahunje Road
    • Plot No 323 near AshokVaan
    • Gahunje
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PC1260002500274
  • ReraGenie IDRG-MH-32212

Builder

  • NamePeninsula Land Limited
  • Entity typeCompany
  • CINL17120MH1871PLC000005
  • DiretorNandan Ashok Piramal
  • DirectorsUrvi Ashok Piramal, Rajeev Ashok Piramal, Pawan Ashok Swamy, Pankaj Ashok Kanodia, Hrishikesh Ashok Parandekar, Mitu Ashok Jha, Mahesh Ashok Gupta, Krupal Ashok Kanakia, Ashwin Ashok Ramanatham
  • Other registrations16 more →
  • Completed8 of 17
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects12 →

Key dates

this monthRegisteredJul 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed19 files

Current status

65%31 of 48 units booked
11.7%Work done, per cost certificate

Figures as on 13 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing AWing A4404848

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 8 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 20%.

Wing A · wing Wing A: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Stilt / Ground97

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,492 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI4016.43
Proposed, not sanctioned1,621 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Bombay Hub, Z Wing, Kamla Mill Compound, Senapati Bapat Marg, Lower Parel, Mumbai.400013, Maharashtra
Estimated costRs 11.28 cr
Cost incurredRs 1.32 cr
Work done11.71%
BuildingWingEstimatedIncurred
Wing AWing ARs 9.30 crRs 1.32 cr
-NARs 1.98 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal Jagdish Deshpande
ArchitectMahesh D Vanja
EngineerPankaj Prabhkar Lingot
Chartered AccountantD Dadheech & Co
Chartered AccountantOmprakash Kedia & Co.
PartnerRole in project
Peninsula Land Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Peninsula Plaza Quliaty Assurance Certificate march 2026.pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Peninsula Plaza March2026.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Peninsula Plaza March2026.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineering Certificate Peninsula Plaza March2026.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineering Certificate Peninsula Plaza March2026.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Peninsula Palza March 2026.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Peninsula Palza March 2026.pdf8 Apr 2026
Withdrawal Update Form 1File: Fomr 1 Architects Certificate Peninsula Plaza Pune December 2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineering Certificate 31 Dec 2025.pdf12 Jan 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate Peninsula Plaza 31 Dec 25.pdf12 Jan 2026
Withdrawal Update Form 1File: Architects Certificate Peninsula Plaza 3092025.pdf21 Oct 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate Peninsula Plaza 30092025.pdf21 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate P Plaza 30092025.pdf21 Oct 2025
Withdrawal Update Form 1File: Architects Certificate Peninsula Plaza 3092025.pdf8 Oct 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate Peninsula Plaza 30092025.pdf8 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate P Plaza 30092025.pdf8 Oct 2025
Layout approvalFile: Markings of Parking & Building line.pdf4 Jul 2025
Building plan approvalFile: Approved Plans (1 to 5 sheets).pdf4 Jul 2025
Declaration and undertaking (Annexure A)File: Annexure A Declaration cum undertaking.pdf16 May 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
addressOne - Phase 1P52100015756Nr Maharashtra Cricket Association Stadium, Gahunje Pune, Pune254Mar 2018CompletedDec 2022Dec 2022

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Peninsula Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot No 323 near AshokVaan13,700+ in Pune

2 kmPeninsula PlazaCompleted 43Lapsed / revoked 20Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: Peninsula Land Limited

Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Peninsula Plaza is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Peninsula Plaza?

The registered promoter entity is Peninsula Land Limited, a company as per the filing. Its CIN L17120MH1871PLC000005 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Peninsula Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Peninsula Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Peninsula Plaza?

The professionals named in the filing: Architect: Vishal Jagdish Deshpande; Architect: Mahesh D Vanja; Engineer: Pankaj Prabhkar Lingot; Chartered Accountant: D Dadheech & Co; Chartered Accountant: Omprakash Kedia & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Peninsula Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Peninsula Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Peninsula Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.