Home / Browse projects / Pune, Maharashtra / Peninsula AshokVann Phase 3

Completed No litigation declared Plotted project

Peninsula AshokVann Phase 3

By PENINSULA LAND LIMITED

RG-MH-46068 · RERA P52100046963 · Last updated on MahaRERA portal: 1 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
16 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Peninsula AshokVann Phase 3 is a Plotted project by PENINSULA LAND LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100046963 on 26 Sep 2022. The registration is recorded completed; possession was promised by 30 Jun 2024. 50 of the 66 units on this registration are recorded sold or booked.

At a glance

Project

  • NamePeninsula AshokVann Phase 3
  • TypePlotted
  • Location
    • Off Mumbai Pune Expressway
    • Near MCA Stadium Gahunje
    • Gahunje
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100046963
  • ReraGenie IDRG-MH-46068

Builder

  • NamePENINSULA LAND LIMITED
  • Entity typeCompany
  • DirectorNANDAN ASHOK PIRAMAL
  • Company SecretorySONAL RATHOD
  • Other registrations16 more →
  • Completed8 of 17
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects12 →

Key dates

this monthRegisteredSep 2022PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Sep 2022
  • Promised completion30 Jun 2024
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed58 files

Current status

76%50 of 66 units booked

Figures as on 1 Jul 2024, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 1 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,018 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14168.61
Proposed, not sanctioned14,169 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJagdish P Deshpande
EngineerPankaj Lingot
Chartered AccountantKIRAN R MATHKAR
PartnerRole in project
PENINSULA LAND LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Jul 2024

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Ashok Vann.pdf1 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mail from PMRDA to Maha Rera.pdf1 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architects Certificate AshokVan Phase 3 01 07 2024.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Invertory - Ashokvann Phase III June,24.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate _ AshokVan Phase 3.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph03 Engineer Certificate March24.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ashokvann Ph03 QA Certificate March24.pdf4 Apr 2024
Layout approvalFile: Sanctioned layout Plan- AshokVann_compressed.pdf3 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned layout Plan- AshokVann_compressed.pdf3 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Final Commencement Certificate - Ashokvann 27-03-2024.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Invertory - Ashokvann Phase III.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -Ashokvann Phase 3 - 12122023.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold unsold plots_Ashokvann_Phase III_Dec 2023.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - Dec 23 - AshokVann - Phase 3.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Ashokvann PHASE 3 Dec 2023_compressed.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ashokvann Ph-03 QA Certificate March '23.pdf31 Oct 2023
CERSAI detailsFile: PLL CERSAI_Search_Report_06-10-2023.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold plots - Phase III.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -Ashokvann - 30 Sep 23 - PHASE 3 _06 10 23_compressed.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ashokvann Phase 3 for RERA.PDF7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Phase 3 Engg Certificate Sept '23.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ashok Vann Phase III architect Certificate.pdf17 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold plotas - Phase III.pdf24 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ASHOK VANN PHASE3.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Certificate - Ashokvann Ph03 June 23.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph-03 Engineer Certificate Jun'23.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate AshokVann Phase 3 March 2023.pdf10 May 2023
CERSAI detailsFile: PLL CERSAI Search Report 190423.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph-03 Engineer Certificate March '23.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ashokvann Ph-03 QA Certificate March '23.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ashok-Vann Phase 3 RERA FORM 3 March 2023.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold plot - Phase III 310323.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold plot - Phase III.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AshokVann Phase III - Architect Certifcate.pdf6 Jan 2023
Disclosure of sold/ booked inventoryFile: RERA upload_Peninsula Ashokvann_Q3 - Phase III.pdf6 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASHOK-VANN PHASE 3 DECEMBER 2022 RERA FORM 3.pdf6 Jan 2023
Proforma of Agreement for saleFile: AshokVannPhase 3 AFS18112022RERA Upload Part I.pdf18 Nov 2022
Proforma of Agreement for saleFile: AshokVann Phase 3 AFS18112022 RERA Upload Part II.pdf18 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFSPhase 3 18112022.pdf18 Nov 2022
Proforma of Allotment letterFile: Final Allotment Letter - Phase III 16092022.pdf17 Sep 2022
Proforma of Allotment letterFile: Final AFS_Phase III_16092022.pdf17 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter Phase III_16092022.pdf17 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFS_Phase III_16092022.pdf17 Sep 2022
Copy of the legal title reportFile: TSR RERA Format Part I.pdf26 Aug 2022
Copy of the legal title reportFile: TSR RERA Format Part II.pdf26 Aug 2022
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance (Phase III).pdf26 Aug 2022
Details of encumbrances concerned to LegalFile: Encumbrance - Litigation (Phase III).pdf26 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf26 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Phase III.pdf26 Aug 2022
Layout approvalFile: Approved layout and Phase 3.pdf17 Aug 2022
Building plan approval or NA orderFile: 220714 COMMENCEMENT CERTIFICATE.pdf17 Aug 2022
PAN CardFile: Peninsula Land Limited.pdf17 Aug 2022
Copy of Layout Approval (in case of layout)File: Approved layout and Phase 3.pdf17 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 220714 COMMENCEMENT CERTIFICATE.pdf17 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: 220714 COMMENCEMENT CERTIFICATE.pdf17 Aug 2022
Declaration about Commencement CertificateFile: Declaration Form D Phase 3.pdf17 Aug 2022
Declaration in FORM BFile: Declaration (From B) Phase III.pdf17 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PENINSULA ASHOK VANN - PHASE 3 - SIGNED FORM 3.pdf17 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Ashok Astoria Phase 1Gat No 2 Govardhan Road Gangapur Village Nashik270CompletedSep 2016Late, May 2017

How this compares with Pune

76%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Peninsula AshokVann Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near MCA Stadium Gahunje13,700+ in Pune

Builder: PENINSULA LAND LIMITED

Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Peninsula AshokVann Phase 3 is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Peninsula AshokVann Phase 3?

The registered promoter entity is PENINSULA LAND LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Peninsula AshokVann Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Peninsula AshokVann Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Peninsula AshokVann Phase 3?

The professionals named in the filing: Architect: Jagdish P Deshpande; Engineer: Pankaj Lingot; Chartered Accountant: KIRAN R MATHKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Peninsula AshokVann Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Peninsula AshokVann Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Peninsula AshokVann Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.