Peninsula AshokVann Phase 2
RG-MH-34626 · RERA P52100046842 · Last updated on MahaRERA portal: 7 Jun 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Peninsula AshokVann Phase 2 is a Plotted project by PENINSULA LAND LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100046842 on 14 Sep 2022. The registration is recorded completed; possession was promised by 30 Apr 2024. 89 of the 116 units on this registration are recorded sold or booked.
At a glance
Project
- NamePeninsula AshokVann Phase 2
- TypePlotted
- Location
- Off Mumbai Pune Expressway
- Near MCA Stadium Gahunje
- Gahunje
- Mawal
- Pune
- 412101
- Pincode412101
- RERA no.P52100046842
- ReraGenie IDRG-MH-34626
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Sep 2022
- Promised completion30 Apr 2024
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed57 files
Current status
Figures as on 7 Jun 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 7 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 70% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jagdish P Deshpande |
| Engineer | Pankaj Lingot |
| Chartered Accountant | KIRAN R MATHKAR |
| Partner | Role in project |
|---|---|
| PENINSULA LAND LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Jun 2024
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate -Ashokvann Phase I and II.pdf | 7 Jun 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architects Certificate AshokVan Phase 2 07 06 2024.pdf | 7 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Commencement Certificate - Ashokvann 27-03-2024.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph02 Engineer Certificate March24.pdf | 4 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ashokvann Ph02 QA Certificate March24.pdf | 4 Apr 2024 |
| Layout approvalFile: Sanctioned layout Plan- AshokVann_compressed.pdf | 3 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Sanctioned layout Plan- AshokVann_compressed.pdf | 3 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Final Commencement Certificate - Ashokvann 27-03-2024.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Invertory - Ashokvann Phase II.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold plots_Ashokvann_Phase II_Dec 2023.pdf | 9 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate RERA Form 1 Ashok Van Phase 2.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - Dec 23 - AshokVann - Phase 2.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Ashok Vann PHASE 2 Dec 2023_compressed.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ashokvann Ph-02 QA Certificate March '23.pdf | 31 Oct 2023 |
| CERSAI detailsFile: PLL CERSAI_Search_Report_06-10-2023.pdf | 9 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold plots - Phase II.pdf | 9 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Ashokvann - 30 Sep 23 - PHASE 2 _ 06 10 23_compressed.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ashokvann Phase 2 for RERA.PDF | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Phase 2 Engg Certificate Sept '23.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold plotas - Phase II.pdf | 24 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ASHOK VANN PHASE2_compressed.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Certificate - Ashokvann Ph02 June 23.pdf | 6 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph-02 Engineer Certificate Jun'23.pdf | 4 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate AshokVann Phase 2 March 2023.pdf | 10 May 2023 |
| CERSAI detailsFile: PLL CERSAI Search Report 190423.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashokvann Ph-02 Engineer Certificate March '23.pdf | 7 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ashokvann Ph-02 QA Certificate March '23.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ashok-Vann Phase 2 RERA FORM 3 March 2023.pdf | 7 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold plot - Phase II 310323.pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold plot - Phase II.pdf | 5 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AshokVann Phase II - Architect Certifcate.pdf | 6 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: RERA upload_Peninsula Ashokvann_Q3 - Phase II.pdf | 6 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASHOK-VANN PHASE 2DECEMBER 2022 RERA FORM 3.pdf | 6 Jan 2023 |
| Proforma of Agreement for saleFile: AshokVann Phase 2 AFS18112022 RERA Upload Part I.pdf | 18 Nov 2022 |
| Proforma of Agreement for saleFile: AshokVann Phase 2 AFS18112022 RERA Upload Part II.pdf | 18 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFSPhase 2 18112022.pdf | 18 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance - AshokVann - Phase 2.pdf | 8 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Phase 2 AFS.pdf | 8 Sep 2022 |
| Other - LegalFile: AFS Phase 2.pdf | 8 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration - Financial Encumbrance (Phase II).pdf | 1 Sep 2022 |
| CERSAI detailsFile: Declaration - Financial Encumbrance (Phase II).pdf | 1 Sep 2022 |
| Proforma of Allotment letterFile: Final Allotment Letter_26082022.pdf | 30 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Phase II - Deviation Report Allotment Letter.pdf | 30 Aug 2022 |
| Copy of the legal title reportFile: TSR RERA Format Part I.pdf | 26 Aug 2022 |
| Copy of the legal title reportFile: TSR RERA Format Part II.pdf | 26 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance - Litigation (Phase II).pdf | 26 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 26 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Phase II.pdf | 26 Aug 2022 |
| Building plan approval or NA orderFile: 220714 COMMENCEMENT CERTIFICATE.pdf | 17 Aug 2022 |
| Layout approvalFile: Approved Layout and Phase 2.pdf | 17 Aug 2022 |
| PAN CardFile: Peninsula Land Limited.pdf | 17 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: Approved Layout and Phase 2.pdf | 17 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 220714 COMMENCEMENT CERTIFICATE.pdf | 17 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 220714 COMMENCEMENT CERTIFICATE.pdf | 17 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration Form D Phase 2.pdf | 17 Aug 2022 |
| Declaration in FORM BFile: Declaration (Form B) Phase II.pdf | 17 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PENINSULA ASHOK VANN - PHASE 2 - SIGNED FORM 3.pdf | 17 Aug 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Ashok Astoria Phase 1 | Gat No 2 Govardhan Road Gangapur Village Nashik | 270 | Completed | Sep 2016 | Late, May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 16 other registrations, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
Keep Peninsula AshokVann Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near MCA Stadium Gahunje13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: PENINSULA LAND LIMITED
Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Peninsula AshokVann Phase 2 is delayed beyond 30 Apr 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Peninsula AshokVann Phase 2?
The registered promoter entity is PENINSULA LAND LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Peninsula AshokVann Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Peninsula AshokVann Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Peninsula AshokVann Phase 2?
The professionals named in the filing: Architect: Jagdish P Deshpande; Engineer: Pankaj Lingot; Chartered Accountant: KIRAN R MATHKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Peninsula AshokVann Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback