De-registered No litigation declared Residential / Group Housing project

Palava Verde A - E

By PALAVA DWELLERS PVT LTD

RG-MH-02953 · RERA P51700020267 · Last updated on MahaRERA portal: 18 Nov 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 17 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Palava Verde A - E is a Residential / Group Housing project by PALAVA DWELLERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700020267 on 30 Mar 2019. Possession was promised by 30 May 2025 and is now 17 months past that date.

At a glance

Project

  • NamePalava Verde A - E
  • TypeResidential / Group Housing
  • Location
    • Kalyan Shifphata Road Palava
    • Palava
    • Khoni
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700020267
  • ReraGenie IDRG-MH-02953

Builder

  • NamePALAVA DWELLERS PVT LTD
  • Entity typeCompany
  • GSTIN27AAACL1490J1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsHITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK
  • Other registrations15 more →
  • Completed8 of 16
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

17 months past promisethis monthRegisteredMar 2019PromisedMay 2025

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on30 Mar 2019
  • Promised completion30 May 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Palava Verde ANA00000
Palava Verde BNA00000
Palava Verde CNA00000
Palava Verde DNA00000
Palava Verde ENA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 18 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Palava Verde A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Palava Verde B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Palava Verde C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Palava Verde D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Palava Verde E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,076 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Lodha Developers LtdMumbai CityMumbai City

Approvals and building plan

Permissible FSI258344.46
Proposed, not sanctioned255,766 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMistry Bhavan, Churchgate

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
PALAVA DWELLERS PVT LTD-

Litigation declared2

CaseCourtStatus
586/2016Civil Judge JD KalyanFiles say WS
284/2015Civil Judge JD KalyanFiles say WS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: NCLT Order Palava to MDL.pdf18 Nov 2024
Other - LegalFile: NCLT Order Palava to MDL.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - March 24.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep 24.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June 24.pdf14 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - March 24.pdf14 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - June 24.pdf14 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - Sep 24.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - March 24.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June 24.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep 24.pdf14 Nov 2024
Other - LegalFile: MDL Authority for RERA Registration.pdf14 Nov 2024
Other - LegalFile: Palava Verde A E - Notary.pdf14 Nov 2024
Other - LegalFile: MDL-PDPL merger INC-28.pdf14 Nov 2024
Other - LegalFile: Annexure A.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - June 24.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Sep 24.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700020267 - Palava Verde A - E.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palava Verde A-E - P51700020267 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Palava Verde A-E - P51700020267 - June24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Palava Verde A-E - P51700020267 - March 24.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 18-19.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 19-20.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 20-21.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 21-22.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 22-23.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 23-24.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 18-19.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 19-20.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 20-21.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 21-22.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 22-23.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 23-24.pdf6 May 2024
Certificates of CA (Form 3)File: FY 18-19.pdf6 May 2024
Certificates of CA (Form 3)File: FY 19-20.pdf6 May 2024
Certificates of CA (Form 3)File: FY 20-21.pdf6 May 2024
Certificates of CA (Form 3)File: FY 21-22.pdf6 May 2024
Certificates of CA (Form 3)File: FY 22-23.pdf6 May 2024
Certificates of CA (Form 3)File: FY 23-24.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Palava Verde A-E - P51700020267 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Palava Verde A-E - P51700020267 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Palava Verde A-E - P51700020267.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palava Verde A To E - Form1 - Sep23.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Palava Verde A - E.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Verde A-E - March23.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Palava Verde A-E - June23.pdf24 Jul 2023
Certificates of CA (Form 3)File: 46 PALAVA VERDE A - E - Form3.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_Verde.pdf26 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 61 verde a to e.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: Palava Verde A-E.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 58 PALAVA VERDE A - E.pdf12 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 58 PALAVA VERDE A TO E.pdf1 Sep 2022
Certificates of CA (Form 3)File: 58 PALAVA VERDE A TO E.pdf1 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 58 PALAVA VERDE A TO E.pdf30 Jun 2022
Disclosure of sold/ booked inventoryFile: Palava Verde A-E.pdf27 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 38 PALAVA VERDE A-E.pdf17 Dec 2021
Certificates of CA (Form 3)File: 58 PALAVA VERDE A - E.pdf15 Dec 2021
Form 2AFile: 69 PALAVA VERDE A-E.pdf18 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 37_Verde A-E.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 22 Palava Verde A To E.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 38 PALAVA VERDE A-E.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: P51700020267.pdf14 Oct 2021
Certificates of CA (Form 3)File: 58 PALAVA VERDE A TO E.pdf9 Oct 2021
Form 2AFile: P51700020267.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 23 Palava Verde A to E.pdf27 Oct 2020
Form 2AFile: Palava Verde A to E.pdf28 Aug 2020
Form 2AFile: VERDE A TO E.pdf17 Jun 2019
Building plan approvalFile: 1_compressed (1).pdf29 Mar 2019
Building plan approvalFile: 2.pdf29 Mar 2019
Building plan approvalFile: 3.pdf29 Mar 2019
Building plan approvalFile: 4.pdf29 Mar 2019
Building Plan Approval (IOD)File: 1_compressed (1).pdf29 Mar 2019
Building Plan Approval (IOD)File: 2.pdf29 Mar 2019
Building Plan Approval (IOD)File: 3.pdf29 Mar 2019
Building Plan Approval (IOD)File: 4.pdf29 Mar 2019
Layout approvalFile: D01 - Sector-D - Layout Plan.pdf22 Mar 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Palava Verde A - E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palava7,600+ in Thane

Builder: PALAVA DWELLERS PVT LTD

Palava Dwellers Pvt Ltd has 16 registrations on MahaRERA, including Orchid A to L and PALAVA AZZURRA A TO D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Palava Verde A - E shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Palava Verde A - E is delayed beyond 30 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Palava Verde A - E?

The registered promoter entity is PALAVA DWELLERS PVT LTD, a company as per the filing. Its GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Palava Verde A - E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Palava Verde A - E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Palava Verde A - E?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Palava Verde A - E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Palava Verde A - E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Palava Verde A - E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.